The DrawToBid manualSearch the manual

Chapter 35

The calculation

Chapter 5 opens the cost estimate and reads the tab you land on. Chapter 20 reads the last three. Neither of them answers the question a builder asks the second time they look at the screen: where did that number come from?

This chapter is the answer. It is about the press itself, every control in the panel behind it, and how one line of money gets built out of a drawing, a norm and a rate.

This chapter was driven on the running product on 4 September 2026, and The per-square-foot column on 17 September 2026. Every frame in it was taken on one of those walks, each one ringed on the control its own paragraph is about, and every money figure in it is quoted off the screen character for character. Where a walk could not reach something, the chapter says so rather than describing it from the outside.

The one thing to hold on to before any of the detail: you never type a quantity into the estimate. You draw a building; DrawToBid measures it, looks up how many hours each work takes and how much material it eats, prices the hours from your own people's rates, and adds it up. What you do type is what you pay your suppliers, and what you want to charge. Everything else is derived, and it moves the moment the drawing moves.

For the furniture this chapter's screens are built out of — how a window over the screen closes, why a button goes grey rather than vanishing, what a disclosure triangle does — see 25 — The controls that repeat. For the editor's own edge, see 26 — Every button around the edge.


Before you press anything: the dialog that opens by itself

On a project whose catalog has moved since the job was costed, the first thing you meet is not the estimate. It is a window headed Catalog updates, and it opens on its own, over the whole screen, before you have pressed a thing.

It is worth reading rather than dismissing, because it is the clearest statement the product ever makes about what a calculation is made of. On the job this chapter was driven on it read:

TOTAL $306,085.93 → $313,735.96 +$7,650.03 LABOR 2,585.03 h → 2,911.95 h +326.92 h

These are catalog norm changes. Your prices are unchanged.

Read that second line twice. The catalog carries norms — hours and material quantities — and not prices. When the catalog moves, the hours move and the money moves with them, because the hours are priced at your rates. Your own prices are untouched, and the window says so in as many words.

Underneath is a table with three columns — WORK, NORM (OLD → NOW), COST IMPACT — one row per work that changed:

Reinforced concrete foundation slab · [the subcontractor] · 1.53 → 9.72 h/1 CY · +$9,217.14 Full roof sheathing — boards / OSB / plywood · 0.04 → 0.03 h/1 SF · −$805.94 Common rafter installation · 0.08 → 0.09 h/1 LF · +$292.09 Concrete floor screed · 15 related-work norms changed · catalog data —

That is the whole mechanism of this chapter on one screen: a norm is hours per unit, and changing it changes the money by the hours times your rate. A norm that went down — the roof sheathing, from 0.04 to 0.03 hours per square foot — takes money off the job.

Two more things on that window before you close it.

A padlocked note near the top:

Work that's delegated to a subcontractor can't be changed until it's released. Use Initiate change to ask for it back, or withdraw the subcontract it's on.

Below the changed works are two more blocks, and neither of them moves any money:

NEW WORKS IN THE CATALOG — 5 works Interior floor slab — basement / garage, 4 in. (Foundations) — available to add Slab-edge rigid insulation, vertical (XPS) (Foundations) — available to add Under-slab rigid insulation (full area) (Foundations) — available to add Subfloor over concrete slab (dimpled membrane / panels / sleepers) (Floors) — available to add Gypsum concrete floor underlayment 3/4 in. (Floors) — available to add

MOVED OR RENAMED IN THE CATALOG — 11 entries Common rafter installation (work) moved from section #— to Roof in your project — no cost change

That is why the line above the tabs names one clause per kind of drift instead of adding them into a single number: three of the four kinds move no money at all. A work that is merely available to add is an offer, not a change to your job, and a work that moved to another section is filed differently and costs the same. Only the first block — the changed norms — has money against it.

And a line at the foot saying what applying it will and will not do:

Applies norms and material consumptions. Not applied: 13 added, 20 switched additional works on 4 works — set those on the element.

Closing it does not throw it away. The window says so itself — "Closing keeps this — it stays on the Calculate button until you apply it" — and the two buttons are Not now and Apply. Press Not now and the same fact reappears as a line above the estimate's tabs, with Review & apply beside it, every time you open the panel. Chapter 5 covers that line; this window is what it opens.

Nothing on this window is applied until you press Apply. Until then your project keeps its own copy of the works it uses, which is why a catalog improvement never silently rewrites a job you have already quoted.


The press

Calculate is the one bright button on the editor's top strip. On the owner's seat it sits after Share — and Share is a pair, a labelled button with a small people icon beside it, so the thing immediately to Calculate's left is that icon rather than the word. Censused left to right, the strip it belongs to reads:

DrawToBid mark · project name · AI · 2D 3D · File · undo/redo · Save · Share · Calculate · messages · notifications · your name

It is on every seat that has an editor at all, but it does not sit in the same place on any two of them — chapter 5 carries the table of all six. Find it by its label, not by what is beside it.

What happens while it runs

Press it and nothing appears instantly. On a house-sized job — 454 elements — the panel took fourteen seconds to come up with its figures in place. That is not the drawing loading; the drawing is already there. It is the calculation itself: every element measured, every work's norm looked up, every hour priced, every material counted, and the whole thing totalled.

You are not waiting on the server for a stored answer. There is no stored answer. The estimate is computed from the model each time you ask for it, which is why it can never be out of date with the building and why nothing you do in it changes the drawing.

What it produces

A panel headed Cost estimate, a dot, and the name of whatever is selected in your scene — on this walk, Cost estimate · [the building]. That is what scope means here: the estimate is costing the part you have selected. Select nothing in particular and you get the whole project.

Across the top, on the owner's seat, eight tabs:

TOTAL · PROGRESS BILLING · BY PARTY · SUBCONTRACTORS · LABOR · DETAILS · MATERIALS · EQUIPMENT

and above them, the catalog line this chapter opened with:

Catalog updated — 12 works changed, 5 new works in the catalog, 11 entries moved or renamed. Review & apply

The three figures at the head of the Total tab, read on the same press:

TOTAL COST $287,487.45 · CLIENT PRICE $302,900.41 · MARGIN 5.09%

Read the arithmetic, not the amounts — that is one job on one day, and it moves as the job is built on. What is worth holding is the relationship: cost is what the job costs you, client price is what you are asking, and margin is the gap between them as a percentage of the client price.


Every control in the panel

The panel was censused control by control, tab by tab, on the owner's seat: every button, box and switch inside it, read by what it is and what state it was in. This is the whole list. Where a control belongs to a road another chapter walks, this one names it and points there rather than walking it twice.

The three that never move

Whatever tab you are on, three controls sit above the tab strip and stay put:

Save changes

what it does

commits what you have edited anywhere in the panel, in one batch. Greyed with no number beside it when nothing is waiting; it comes alive carrying a count the moment something is — driven: one material price took it from clean and disabled to dirty and enabled with a count of 1

Review & apply

what it does

the catalog line's own button, described at the top of this chapter. Present only when something has moved under the project

Close

what it does

shuts the panel. Escape does the same

There is no currency control and no unit control anywhere in this panel — not on any tab, not behind any menu; the census that produced this list found neither. The client-price box names its own currency in its own label — "Client price in US Dollar" — and there is nothing to change it to. Areas are in square feet throughout (ft² on the Building area row, SF on every quantity), and there is nothing to change that either.

There is no Export button of any kind. Not greyed, not hidden — it does not exist.

Total — nine controls

Nine, beyond the strip and the three above — this being the tab in the state it arrives in. Two more controls exist on it and appear only when the product asks you a question about the building area; they are in The per-square-foot column below.

Price them →

what it is for

switches the panel to the Materials tab, where an unpriced line gets its price. Pressed: the active tab went from TOTAL to MATERIALS

what a sensible value looks like

—

Building area (a number box)

what it is for

the floor area every per-square-foot figure elsewhere divides by. Placeheld Not set until it has one

what a sensible value looks like

the area of the house you are quoting

USE

what it is for

adopts the area DrawToBid measured off your own drawing. Present only when there is something to measure — see below

what a sensible value looks like

on this job it offered suggested 2,568.99 ft²

How the building area is computed

what it is for

an information mark; pressing it explains where the suggestion comes from, or why there is none

what a sensible value looks like

—

Overhead, tax & markup (…%)

what it is for

a disclosure. Closed it shows one row and one total; opened it shows the individual layers

what a sensible value looks like

14.8% · +$42,529.27 on this job

Client price (a text box)

what it is for

what you are asking the customer to pay. It holds the computed figure until you type over it

what a sensible value looks like

—

the allowance box

what it is for

the amount of one allowance in the price, editable without leaving the tab

what a sensible value looks like

it held 89478.36 on this job — a bare number, unformatted, as a box you type in is

Request approval

what it is for

sends the client price to the customer for sign-off

what a sensible value looks like

—

History

what it is for

the approval history, with its own timestamps

what a sensible value looks like

—

The suggestion and its USE button are absent, not greyed, when DrawToBid cannot measure a building. On a project carrying a single wall, the Building area row reads Not set with no suggestion and no USE beside it — and the information mark says why in the product's own words:

BUILDING AREA — We can't auto-compute the area yet — add floor packages to the model, or enter it manually.

Which is the honest answer: a wall is not a floor, and DrawToBid will not invent a footprint it cannot see. Draw the floors and the suggestion appears; until then the box is yours to fill.

Everything else on Total is a read-out, not a control. The three figures, the BEFORE YOU COMMIT block, the breakdown rows and the CUSTOMER APPROVAL state are all printed, not typed.

Here is that whole tab as one reading, so the arithmetic can be followed rather than trusted:

TOTAL COST $287,487.45 · CLIENT PRICE $302,900.41 · MARGIN 5.09%

BEFORE YOU COMMIT — 93 of 95 materials not priced yet · 98% · Price them → $191,422.63 of contractor materials not yet purchased

Building area — ft² — suggested 2,568.99 ft² — USE

Payment workers $76,831.95 Hours 2,470.28 Materials (net) $202,173.06 Equipment (net) $482.44 [the subcontractor] (bought-in) lump sum $8,000 Overhead, tax & markup (14.8%) +$42,529.27 Client price — a box

That whole tab, in one frame — the Building area row still reading Not set beside its suggestion, the collapsed markup row with its arrow, the Client price box holding the computed figure, and the allowance disclosed under CUSTOMER APPROVAL:

The four cost lines add to the cost figure exactly:

76,831.95 + 202,173.06 + 482.44 + 8,000.00 = 287,487.45

and the margin is the gap over the client price:

(302,900.41 − 287,487.45) ÷ 302,900.41 = 5.09%

That is the whole of the Total tab's arithmetic in the state it arrives in. Everything above it in this chapter is about how the first of those four numbers comes to be $76,831.95 — and one press puts a second column of arithmetic on every one of these rows, which is the next section.

The per-square-foot column

One press, and a second money figure appears beside the money on this tab.

It is the press on USE, and until it is made there is no per-square-foot figure anywhere on Total — not a blank cell, not a dash. The column is absent, because a price per square foot needs a number of square feet and the box is empty. That is the state the tab above was read in, and it is the state you land in on a project whose area has never been set.

This section was driven on the same house as the reading above, thirteen days later. The catalog moved in between, so its money figures are not the ones printed further up the page; they are consistent with each other throughout, and every one of them is read off the screen.

Before the press

The Building area row carries four things: a box placeheld Not set, the unit ft², the figure DrawToBid measured off your drawing, and the button that adopts it.

Building area — ft² — suggested 2,568.99 ft² — USE

Where the suggested figure comes from

The information mark beside USE answers that, and it answers it with the parts rather than with a sentence. Pressed on this job it listed every piece of the model that counts as floor, each with its own area and a tick:

Foundation_heated · Reinforced concrete foundation slab · 1,911.86 ft² ✓ Foundation_garage · Reinforced concrete foundation slab · 558.36 ft² ✓ Timber-frame structural wall_1 · 24.41 ft² ✓ · _3 · 19.95 ft² ✓ · _4 · 17.89 ft² ✓ · _5 · 15.90 ft² ✓ Gable-end truss_1 · 20.62 ft² ✓ Heated (living) area — 2,568.99 ft²

Those seven parts add to the total exactly:

1,911.86 + 558.36 + 24.41 + 19.95 + 17.89 + 15.90 + 20.62 = 2,568.99

So the suggestion is not an estimate of your house. It is a sum of named things you drew, and the panel shows you which ones.

Close it by pressing the mark again. Escape belongs to the estimate: pressed here it closes the whole panel, not the popover.

What USE does

It puts the measured figure in the box — and the same tab, unchanged in every other respect, now reads:

TOTAL COST $275,046.34 · CLIENT PRICE $283,741.10 $110.45/ft² · MARGIN 3.06%

Building area 2568.99 ft²

Payment workers $25.06/ft² $64,390.84 Hours ≈ 32.63 crew-days at 8 man 2,088.31 Materials (net) $78.70/ft² $202,173.06 Equipment (net) $0.19/ft² $482.44 Sub Test Co (bought-in) lump sum $8,000 Overhead, tax & markup (13.0%) $13.94/ft² +$35,811.07 Client price $110.45/ft² $283,741.10

Not one money figure moved. The cost is the same cost, the price is the same price, the margin is the same margin. What arrived is a second way of reading them, and it arrived in two places at once: a rail down the breakdown, and a headline under CLIENT PRICE — the figure a builder is actually asked for on the phone.

It divides exactly the way you would expect

Each figure is its own row's money divided by the number in the box, and nothing else. Every one of them was checked by hand against the 2,568.99 ft² on screen:

Client price

money on the row

$283,741.10

printed beside it

$110.45/ft²

money ÷ 2,568.99, by hand

110.4485

Payment workers

money on the row

$64,390.84

printed beside it

$25.06/ft²

money ÷ 2,568.99, by hand

25.0647

Materials (net)

money on the row

$202,173.06

printed beside it

$78.70/ft²

money ÷ 2,568.99, by hand

78.6975

Equipment (net)

money on the row

$482.44

printed beside it

$0.19/ft²

money ÷ 2,568.99, by hand

0.1878

Overhead, tax & markup

money on the row

$35,811.07

printed beside it

$13.94/ft²

money ÷ 2,568.99, by hand

13.9397

Five for five, to the cent. There is no weighting and no second denominator hiding anywhere — it is the one number in the Building area box, the number the information mark derived, and you can reproduce every figure in the column with a pocket calculator.

Hours carries no per-square-foot figure, and should not: hours are not money.

And do not expect to add down the column to the client price. Division is linear, so this column adds up exactly as far as the money column beside it does — which means the rows above the markup are the cost and the headline is the price. The gap between them is the margin, here as everywhere else on this tab.

The layers carry it too

Open the markup row and each layer has its own:

Overheads 10% $2.51/ft² $6,439.09 Income 20% $5.01/ft² $12,878.17 Income on subcontracts 10% $0.31/ft² $800 Net subtotal $104.34/ft² $268,047.29

Those four divide the same way and were checked the same way — 6,439.09 ÷ 2,568.99 = 2.5065, 12,878.17 ÷ 2,568.99 = 5.0129, 800 ÷ 2,568.99 = 0.3114, 268,047.29 ÷ 2,568.99 = 104.3396.

There is no second press

Once the box holds the measured figure, the suggestion and USE take themselves off the row. Nothing is greyed out; the two of them are simply not there, because there is no longer a different number to adopt. The box, the unit and the information mark stay.

Typing your own area instead

The box is yours. Type into it and the whole column recomputes on the same money — 2,000 ft² typed by hand on the same job:

Client price

money

$283,741.10

at 2,568.99 ft²

$110.45/ft²

at 2,000 ft²

$141.87/ft²

Payment workers

money

$64,390.84

at 2,568.99 ft²

$25.06/ft²

at 2,000 ft²

$32.20/ft²

Materials (net)

money

$202,173.06

at 2,568.99 ft²

$78.70/ft²

at 2,000 ft²

$101.09/ft²

Equipment (net)

money

$482.44

at 2,568.99 ft²

$0.19/ft²

at 2,000 ft²

$0.24/ft²

Overhead, tax & markup

money

$35,811.07

at 2,568.99 ft²

$13.94/ft²

at 2,000 ft²

$17.91/ft²

And the suggestion comes back the moment your figure differs from the measured one, with its USE beside it — the same pattern the Client price box uses. That is how you get back to what DrawToBid measured without having to remember what it was.

When the product asks you about the area

There is one state in which this row asks a question instead of waiting. If the figure in the box is smaller than the measured one by exactly the square-metre-to-square-foot factor — 10.76 — a notice opens directly under the row and the ordinary suggestion is suppressed while it is up:

⚠ BEFORE YOU COMMIT Building area is set to 238.67 ft², which is 10.76× smaller than this scene measures (2,568.99 ft²). That gap is the m²-to-ft² factor — the signature of a building area adopted before the units fix. Every per-area figure on this tab is divided by it.

USE MEASURED AREA · Keep mine

Both numbers it argues from are on the screen, and so is the ratio between them — 2,568.99 ÷ 238.67 is 10.76 — so you can check the claim without leaving the tab. It is worth checking, and the rest of the tab is why: while the notice is up every figure in the column reads 10.76 times too high, $1,188.84/ft² under CLIENT PRICE against the $110.45/ft² the same job prints with the measured area in the box.

The likeliest way to arrive here is to type your area in square metres into a box labelled ft², which is exactly the arithmetic the notice describes.

Two answers, and they do different things.

USE MEASURED AREA adopts the measured figure, exactly as USE does: the box went from 238.67 to 2568.99, the column went back to $110.45/ft² and $25.06/ft² and $78.70/ft², and the notice closed.

Keep mine writes nothing at all. The box still read 238.67 afterwards and every figure in the column was unchanged — the product asked once, was told no, and the row went back to its ordinary shape with the suggested 2,568.99 ft² and its USE in place. Your number stands, and the offer to replace it is still one press away whenever you want it.

It is asked once. Whichever answer you give, the question does not come back for that project in that browser. Reloading the page after Keep mine brought back the same 238.67 in the box and the same figures in the column, and no notice with them.

The markup row, opened

The one collapsed row on the Total tab is a disclosure, and pressing its arrow is how you find out what the percentage beside it is made of. Opened, it lists the layers:

Overhead, tax & markup (14.8%) +$42,529.27 Overheads 10% · $7,683.20 Income 20% · $15,366.39 Income on subcontracts 10% · $800 Net subtotal · $284,220.73 Taxes 2 · $18,679.68

That is why the one percentage on the closed row is not a setting you can go and change. It is what several layers come to together on this particular job — and the layer names tell you why two jobs in the same company print different percentages: one of them is income on subcontracts, so a job with a subcontractor on it is loaded differently from one without. The composite read 54.0% on the fresh project in this chapter and 14.8% on the older one, same company, same day.

The layers themselves are company settings, not project settings. Chapter 14 is where they are authored.

The Client price box, typed into

The last row of the breakdown is the one thing on Total you are meant to overwrite. Driven on a job whose cost is $0, so that the box's own behaviour is not confused with the arithmetic around it:

nothing — as it arrives

the box then held

0

MARGIN

0%

what appeared beside it

—

9999

the box then held

9,999

MARGIN

100%

what appeared beside it

*Client price (recommended: $0)* USE

0

the box then held

0

MARGIN

0%

what appeared beside it

—

emptied

the box then held

0

MARGIN

0%

what appeared beside it

—

Three things worth taking from that.

It takes what you type, and formats it. 9999 becomes 9,999 in the box.

The moment your figure differs from the computed one, the product offers the computed one back — "(recommended: …)" with a USE button beside it, exactly like the Building area row. That is how you undo an override without having to remember what the number was.

Emptying the box is not a third state. Clearing it lands on 0, the same as typing zero; there is no "unset" for a client price.

What the panel looks like with nothing drawn yet

Worth seeing once, because it tells you which parts of the panel are computed and which are furniture. Opened on a project made minutes earlier with an empty scene, the panel carries the same eight tabs and:

TOTAL COST $0 · CLIENT PRICE $0 · MARGIN 0% Building area — ft² Overhead, tax & markup +$0 Client price — a box CUSTOMER APPROVAL — DRAFT $0 — "No customer on this project to approve — invite a customer to request approval."

Three things are missing rather than empty, and each absence is informative. There is no BEFORE YOU COMMIT block — nothing is unpriced, because nothing has been called for yet. There is no suggested building area beside the box — DrawToBid measures the building it can see, and it cannot see one. There is no breakdown — no Payment workers, no Hours, no Materials — because there are no works to lay out.

The catalog line above the tabs is there, and on a new project it names one clause only:

Catalog updated — 113 new works in the catalog. Review & apply

Which is the same rule as before from the other end: a project born today has 113 works available to add and nothing changed underneath it, so the only clause it can print is the one that moves no money.

Progress billing — no controls at all, and it says why

On this job the tab carried no controls of its own. In their place, one sentence:

You cannot compose an application yet. The final price has not been sent to the customer for approval yet. Send it for approval — an application is a breakdown of the figure the customer approved.

That is the ordering the whole billing road depends on: a price is agreed first, and only then can work be billed against it. Chapter 8 is that road.

By party — fourteen controls, and the same cost figure again

Headed BY RESPONSIBILITY PARTY, with one figure under the heading:

BILLABLE COST BASE (COMPANY + SUBCONTRACTORS) — $287,487.45 Markup and tax are added on the Total tab.

That is the Total tab's COST, to the cent. Below it, one card per party — Company $279,487.45 and [the subcontractor] $8,000 — which add back to it. Chapter 20 walks this tab.

Subcontractors — the work you have handed out

SUBCONTRACT PROGRESS — Work you've handed to subcontractors — their price, status, and progress. [the subcontractor] — PLANNED · 0% — NOT AGREED $8,000

Chapter 13 is the tendering road that fills it.

Labor — the working table, and where the money is actually built

Two view positions — JOINED and DETAILED — a filter bar of three selects and a Clear, and a pivot:

view

positions

JOINED · DETAILED

FILTER

positions

All categories · Any assignee · All (coverage)

PIVOT

positions

By work · By worker

By work is the position the tab opens in, and every reading in this chapter was taken in it. By worker is the other way of folding the same list. This walk did not press it, so this chapter does not describe it.

Under them the table, with the columns that are the subject of this chapter:

NAME, UNIT OF MEASURE · QUANTITY · HOURS · PAYMENT · COVERAGE · BASIS · ASSIGNEE

The category rows are collapsed when you arrive, and each header carries its own rollup:

Foundations (6) — 4.32 — $140.56 — ● 3 planned · ○ 3 not assigned Walls (8) — 770.26 — $21,449.24 — ● 4 planned · ○ 1 not assigned +3 excluded Columns (5) — 34.58 — $1,121.61 — ○ 3 not assigned +2 excluded

Read a header as (works) — hours — money — who is on them. The +N excluded term is outside the sums: an excluded work still prints its own row, but the hours and money on the header cover the works that are in the job.

The bar beside that caption

The words you have just read are the caption of a picture, and the picture is the wider part of the reading. Every category header carries a bar across the COVERAGE column, and the caption sits at its right-hand end.

The bar is the category's works, laid end to end, each segment as wide as its share of them. There are six states it can draw — planned, in progress, awaiting review, verified, payable and not assigned — and it draws only the ones that are actually there. On the header above, three of six works are planned and three are not assigned, so two segments are drawn and nothing prints a zero.

Hover it, or reach it with the keyboard, and it names its own counts. The card is titled for the category and says how many works it is describing, then gives one line per state with the count as a fraction of the whole:

Foundations — work distribution 6 works ● Planned 3 of 6 ○ Not assigned 3 of 6

The +N excluded term appears in the card too, marked (not counted), so the bar and its caption cannot be read as covering works that are out of the job.

And a second bar, on every work row

Open a category and each work row carries a bar of its own in the same column. It answers a different question from the header's: not how many works are at each stage but how much of this one work is held, and by whom.

It says by whom with the shape of the band rather than with a word, and there are three shapes:

solid

what it means

your own people hold it

half-height, sitting on the baseline

what it means

a subcontractor holds it — and the missing upper half is the point: what they have done is known only from the acts they send you, so the figure is not yours to draw

hollow, dashed

what it means

nobody holds it

Beside the bar is the same kind of short read-out the header has — 1 worker, 1 crew — and hover or focus opens the full card, one line per state with its percentage, under a subtitle that says what the percentages are shares of.

Two marks can appear on that row, and they mean different things.

A thin upright mark across the bar is where the signed scope falls. It takes no width of its own — its position is the whole of its claim — so you can see at a glance whether what is held has passed what was signed for.

A yellow triangle before the caption is a disagreement, and the card says what disagrees:

Reinforced concrete foundation slab — every state Percentages are shares of this whole work. ● Assigned, not started 100%

Our own people and the subcontractor together hold more than this whole work. Two figures were read a moment apart.

The triangle has a column of its own that is always there whether or not it is filled, so a disagreement on one row never shifts the captions of the rows around it.

Neither bar is a control. Nothing is pressed here and nothing is changed; this is the column the tab uses to tell you where the work stands. Putting somebody on a work is Chapter 38.

Details — three positions, not two

The same money laid out for reading, under № · NAME, UNIT OF MEASURE · QUANTITY · COSTS PER UNIT · COSTS TOTAL, with ten collapsed category rows.

Its view control has three positions, and this is the one place in the estimate where that is true: JOINED · DETAILED · + MATERIALS & EQUIPMENT. The Labor tab's has two.

If you have read that there are three positions above the work table and found only two, you were on Labor. Chapter 20 walks Details.

Materials — where a price comes from, because the catalog carries none

The tab opens on a budget block:

MATERIAL BUDGET — 5.47% bought TOTAL BUDGET $202,502.89 · BOUGHT $11,080.26 · TO BUY $191,422.63 UNPRICED 93 of 95 lines · 98% — Show

$11,080.26 + $191,422.63 = $202,502.89, and the TO BUY figure is the same $191,422.63 the Total tab prints as "of contractor materials not yet purchased". The two tabs are one number seen twice.

Then the table — № · NAME, UNIT OF MEASURE · QUANTITY · PRICE · NET · WHO BUYS · PURCHASED — grouped by material category, with a Set all… control on every group header that routes a whole category to one buyer at once, and a History control at the top of the tab.

The QUANTITY column is computed and the PRICE column is empty. That is the single most important fact about this tab, and it is not a gap in the data: DrawToBid's catalog ships no prices at all. It carries the norms — how many hours a work takes and how much material it eats — because those are properties of the work. What a bag of screws costs in your town on the day you buy it is not, and we will not guess it for you. Ninety-three of the ninety-five lines on this job had no price, and until you give them one they contribute nothing to the total. That is what the BEFORE YOU COMMIT block on Total is counting.

The category rows are collapsed when you arrive, and until you open one there is nothing to type into. Open one and the lines appear, each with its own price box:

Damp-proof membranes (2) — Set all… 1 · Wind barrier membrane (vapour-open) · SF · 156.303 · Not priced · General contractor · Set a price 2 · Smart vapor retarder, Class II (variable-perm) · SF · 142.094 · Not priced · General contractor · Set a price

The quantity is DrawToBid's — it came off the wall that was drawn. Everything to the right of it is yours.

Pricing one line, and what moved

12.50 typed into the first row's price box. Before and after, read off the same screen:

the row's price

before

Not priced · Set a price

after

$ 12.5 · Mark as allowance

the row's money

before

—

after

$1,953.78

TOTAL BUDGET

before

$0

after

$1,953.78

UNPRICED

before

7 of 7 lines · 100%

after

6 of 7 lines · 86%

the row's end

before

—

after

Record · Nothing bought yet

Save changes

before

clean, disabled, no count

after

dirty, enabled, count 1

the tab strip

before

no dots

after

Materials (unsaved changes)

156.303 SF × $12.50/SF = $1,953.78

One number typed, and six things moved. The line got its money, the budget went from nothing to that money, the unpriced count dropped by exactly one, the row grew two controls it did not have (Mark as allowance, and Record for when you actually buy), and the header's Save changes came alive carrying a count of 1 with a dot on the Materials tab beside it.

That last row is the answer to "how do I know what I have not saved". The count counts the things you changed, and the dot tells you which tab to look on. Nothing here is written until you press it.

And while something is waiting, the panel does not let go of the screen. Deal with what is waiting — press Save changes, or answer the question the product asks you — and the way out opens again.

Equipment — the machine time

№ · NAME, UNIT OF MEASURE · QUANTITY · RATE · NET · VAT % · VAT · GROSS · PROVIDED BY, with a Set all… on the group header. On this job: Equipment (3) — $482.44, VAT $0, gross $482.44 — the same $482.44 the Total tab carries as Equipment (net).


When something is marked Demolish

An element marked Demolish (chapter 29) is priced as work to take down, and it changes what four tabs show. This reading is from one company copy of a house, built as drawn, with one interior partition and the roofing marked Demolish and the rest of the roof marked Existing.

Labor: a Demolition group, first

Every demolished work is filed in its own group, Demolition, at the top of the list, before the building's own groups:

Demolition (5) — 61.16 — $1,991.74 — ○ 5 not assigned Foundations (3) — 164.84 — $5,368.94 — ○ 3 not assigned Walls (8) — 658.37 — $21,444.08 — ○ 5 not assigned +3 excluded

Open it and each row is named for the work of taking it down, not for the installation it came from: Partition wall demolition, Asphalt shingle tear-off, Underlayment removal, Ridge cap removal. The quantity is the drawing's, as for any row; the hours are that quantity at the work's demolition norm; the payment is those hours at your people's rates.

Partition wall demolition (1 SF) — 155.355 — 8.08 — $263.12

Some rows read No separate time in place of their hours and payment. Those pieces come off in the time of the work they belong to — the underlayment and the ridge caps with the shingle tear-off. They are listed because they are still taken off and hauled away; they add nothing to the sums, and there is nobody to assign to them, so their assignee cell holds a dash.

The demolition norms

The norm is in the catalog, per work, in hours per unit, like every install norm. On the Details tab the demolition row's Payment workers line prints it: norm: 0.052 h/unit for the partition. The catalog carries US demolition norms for the works a rework most often starts with, among them the shingle tear-off at 0.015 h/SF, which Rates & Works lists under OUR DEMOLITION NORM (chapter 11). A company sets its own there, and its own wins.

Details: TO REMOVE, and the haul-off of each row

With + MATERIALS & EQUIPMENT on, a demolition row's list is headed TO REMOVE instead of materials. It is what the element is made of, in the quantity that stands, with no price anywhere, because none of it is bought. Its last line is the row's own Haul-off: here 310.711 SF of gypsum board, 80.502 LF of studs, 33.15 LF of plates, the tape, compound and screws, and 901 lb · 1.7 CY loose.

Total: Demolition labor, and Haul-off

Demolition labor sits directly under Payment workers, which then carries the install labour alone. Haul-off sits under Hours: the weight and the loose volume of everything coming off, the figures a dumpster is sized by, with a note naming what it could not count.

Payment workers $30,860.86 Demolition labor $1,991.74 Hours 1,008.64 Haul-off 6.64 tons · 18.7 CY loose — 3 works have no haul figures and are not counted Equipment (net) $453.95

The cost lines still add to the cost exactly:

30,860.86 + 1,991.74 + 453.95 = 33,306.55

and Hours is the sum of the group headers, the Demolition group's included: 61.16 + 164.84 + 658.37 + 121.59 + 2.68 = 1,008.64.

A project that is only demolition prints no Demolition labor row: that labour is then the whole cost, and the Cost figure already says it. Chapter 40 shows that estimate.

By party

The company's card splits its labour the same way: Labor and Demolition labor.

On a phone the Demolition group is the first group of cards on the Labor tab, and a No separate time card says in words that there is nothing to assign:


How one line's money is built

This is the part of the chapter worth reading twice. Take one row off the Labor tab and follow it from the drawing to the money.

Timber-frame structural wall (1 SF) ×6 — quantity 3,361.512 — hours 437.25 — payment $11,804.79 — coverage 4 workers — basis self sub off — 4 assignees

Four numbers, and each one comes from somewhere different.

1. The quantity comes from the drawing

3,361.512 square feet, and the ×6 says that quantity is the sum over six placed elements. You did not type it. DrawToBid measured the six walls you drew — their real lengths, heights and thicknesses — and the work's unit (1 SF) decides which measurement it wants. Move a wall and this number moves with it.

The unit is what makes the number meaningful. A work billed by surface area asks a different question of the same wall than one billed by footprint or by the piece — chapter 27 lists every work in the catalog with its unit and what it is billed by.

2. The hours come from the norm

437.25 hours. This is the catalog's contribution, and it is the only thing the catalog contributes: a norm, which is hours per unit of that work. The Catalog updates window at the top of this chapter shows norms in exactly that shape — 0.04 → 0.03 h/1 SF, 1.53 → 9.72 h/1 CY, 1 → 1.50 h/1 EA.

quantity × the work's norm = hours

Change the norm and the hours change; that is why the catalog window can move money without touching a single price of yours.

3. The money is those hours at your own people's rates

$11,804.79. Not a price from a catalog — your hours at your rates. Which rates, exactly, depends on whether the work has been given to anybody yet, and that is the next section.

The arithmetic, in full, on the row above

Open the row's disclosure — the 4 assignees chevron — and it names everyone on the work with the share each holds:

Work distribution Jake Thompson (carpenter) · 65.6 h · 15% of this work Luis Ortega (concrete worker) · 131.2 h · 30% of this work Frank Adams (general builder) · 109.3 h · 25% of this work Billy Green (laborer) · 131.2 h · 30% of this work

Three things to read out of that, in order.

The shares divide the hours, not the money. They add to 100%, and each person's hours are that person's share of the work's 437.25: 15% is 65.6, 30% is 131.2, 25% is 109.3. Nothing about money has happened yet.

Each slice is then priced at that person's own hourly rate — the rate on their row of your company's Team page. On this roster those four are $32, $26, $36 and $18 an hour respectively.

The line's payment is the four slices added up. Which means the rate this work was charged at is the average of the four men's rates weighted by their shares:

0.15 × $32 + 0.30 × $26 + 0.25 × $36 + 0.30 × $18 = $27.00 per hour

And the rate the product actually charged, taken by dividing the two figures it printed on the row:

$11,804.79 ÷ 437.25 h = $26.9978 per hour

Those agree to four decimal places, and the remaining fraction of a cent is the row's hours being printed to two places. That is the whole of rung 1, closed.

A second row on the same tab does it again with two people instead of four:

Gypsum board partition on wood studs (1 SF) ×19 — quantity 2,014.453 — hours 187.26 — payment $4,903.41 — 2 workers

Chris Miller (drywaller) · 112.4 h · 60% of this work Tomasz Kowalski (tiler) · 74.9 h · 40% of this work

60% of 187.26 is 112.4 and 40% is 74.9, exactly as printed; at $25 and $28 an hour the share-weighted rate is $26.20, and $4,903.41 ÷ 187.26 is $26.19. Two works with different people on them are charged at different rates, and that is the intent, not a rounding artefact.

Everything the disclosure puts on each person's line

Unfolding a work is not just a read-out. Each person's line carries, left to right: their name and trade, their hours and their share of this work, a progress bar, their state (Not started), their scheduling state (Assigned · Not scheduled, or real dates — two of the four above read from Jul 20 to Aug 4 and from Jul 20 to Aug 6), a Take up slider with a % box and its own Take up button, an Unassign control and a small history icon. Above them all sit two positions, Progress and Work distribution.

Chapter 7 is the road that puts people on works in the first place; chapter 18 is checking what they report. This chapter only cares that the share is what divides the hours.

What an excluded work looks like

Some rows carry a quantity and hours and no money at all:

Fire / biocidal protection of timber structure (1 SF) ×7 — 3,533.229 — 32.85 — *Excluded from estimate — not paid* — basis self sub off — —

Venetian plaster (1 SF) ×26 — 5,547.682 — 515.54 — *Excluded from estimate — not paid*

The work is still measured and still has hours. What has been switched off is paying for it — the basis chip's third position, off. Its assignee cell is a bare dash, because there is nothing to assign. On the category header these rows are counted separately, as +3 excluded, and they are outside the header's hours and money.

One more arithmetic, and where the units come from

The allowance disclosed at the foot of the Total tab does the same job in a single line:

Smart vapor retarder, Class II (variable-perm) — ALLOWANCE — Material — NOW IN THE ESTIMATE $116,594.67 · ~3,886.489 SF · $30/SF

3,886.489 SF × $30/SF = $116,594.67

exactly. The ~ marks a figure rounded for display. There is no unit switch — feet and square feet are what the product prints.


Which rates the hours are priced at

This is the one rule in the whole panel worth memorising, because it decides every money figure on it. DrawToBid asks a different question depending on whether the work has been given to anybody yet, and it does that on purpose: you have to be able to quote a customer before you have decided who is doing what.

There are three rungs, and the estimate always uses the most specific one it can reach.

Rung 1 — the work is already assigned: its own people's rates, by their shares

If somebody is on the work, that work is priced by the people who are actually on it. The hours are divided by the shares you set, and each slice is priced at that person's own hourly rate. The gypsum partition above is the whole rule in one row: 60% of the hours to a drywaller, 40% to a tiler, each at their own rate.

This is why the estimate sharpens as the job fills up. Put your most expensive worker on a job and that work costs more; take them off it and it costs less. Nothing else has to be re-entered.

Rung 2 — nobody is on it yet: your company's average rate

A work with nobody on it is priced at the average rate across your company's roster. On the job in this chapter, the unassigned rows all imply almost exactly the same rate, which is what an average looks like:

Skim coating — gypsum finish

hours

93.66

payment

$3,047.98

payment ÷ hours

$32.54/h

Interior wall painting

hours

41.27

payment

$1,341.14

payment ÷ hours

$32.50/h

Double top plate

hours

10.82

payment

$351.92

payment ÷ hours

$32.52/h

Three different works, three different trades, one rate. Compare that with the two assigned rows on the same tab — the timber wall at $27.00/h and the gypsum partition at $26.19/h — and the ladder is visible on one screen: assigned work is priced by its own people; unassigned work is priced by the company.

And that one rate is not a number anybody typed. The company's Team page was opened on the same walk and its fourteen workers read off, rate by rate:

Al Peterson (HVAC technician) $60/h · Billy Green (laborer) $18/h · Chris Miller (drywaller) $25/h · Dan Harris (roofer) $30/h · Danny Fielder (laborer) $22/h · Frank Adams (general builder) $36/h · Jake Thompson (carpenter) $32/h · Luis Ortega (concrete worker) $26/h · Marco Reyes (laborer) $22/h · Miguel Santos (mason) $28/h · Pete Nowak (painter) $24/h · Ray Jenkins (electrician) $55/h · Sam Rodriguez (plumber) $50/h · Tomasz Kowalski (tiler) $28/h

Those fourteen rates add to $456 an hour, so the company's average is $32.57 an hour — which is the rate the three unassigned works above are being charged at, to within a fifth of one percent.

Why "to within a fifth of a percent" and not exactly. The hours in that table are printed to two decimal places, so dividing one printed figure by another cannot land on the exact rate. The three implied rates come out at $32.54, $32.50 and $32.52 against a roster average of $32.57 — the same number seen through rounding, not three different rates. This chapter shows you the division so you can do it on your own job; it does not pretend the division is exact.

This is the reason your roster matters more than any setting. There is no page where you type "our labour rate" — no such setting exists anywhere in the product. You enter your workers and their rates on the company's Team page, and those rates are what every estimate uses. Chapter 14 is that page.

Your own rates are used from the first stroke

A reasonable fear: that the estimate shows you a placeholder price while you draw and quietly re-prices itself once the job is properly saved. It does not.

A project was made through the product and a single wall placed on it. Before it had been saved at all, its estimate read:

TOTAL COST $703.55 · CLIENT PRICE $1,083.49 · MARGIN 35.07% Payment workers $703.55 · Hours 21.60

$703.55 ÷ 21.60 h = $32.5718 per hour

which is the company average from the roster above — $32.57 — and not the country default that a company with no roster would fall back to. The rate that comes out of your own people is used from the first stroke you draw, before the project has been written anywhere.

What this chapter does NOT claim, and the reason is worth stating. The same three figures were read again after pressing Save and were identical — but that comparison proves nothing and is not offered as evidence. The isolated copy of the product this chapter was driven on has cloud writing switched off by the test harness, so the press had nothing to write: the status strip read Cloud: —, and re-opening the same project later showed an empty scene. A control that was prevented from acting cannot be used to show that acting changes nothing. The reading that stands is the one above — the rate on an unsaved scene — and it stands on its own.

That fresh estimate is also the cleanest place to see the client price being computed rather than typed:

cost $703.55 + markup $379.94 (54.0%) = client price $1,083.49 margin ($1,083.49 − $703.55) ÷ $1,083.49 = 35.07%

both exactly as printed. On the older job earlier in this chapter the client price is not cost-plus-markup — $287,487.45 plus $42,529.27 would be $330,016.72, and the box holds $302,900.41. Nothing is wrong with either: the box holds the computed figure until somebody types over it, and on that job somebody had.

Rung 3 — no company behind it at all: a built-in default

Somebody with no company can still draw and still press Calculate, and the estimate still has to produce a number. An account was registered for this chapter with no company at all, one wall drawn on the scene it is allowed, and its estimate read:

TOTAL COST $477 · CLIENT PRICE $744.12 · MARGIN 35.90% Payment workers $477 Hours 31.80 — ≈ 1 crew-days at 4 man

$477 ÷ 31.80 h = $15.00 per hour

Exactly fifteen dollars an hour. That is a built-in default and nothing else: not your company's average, and not a market rate for anywhere. Treat any figure from that seat as an illustration of the shape of an estimate, never as a price. The moment there is a company with real people on its roster behind the project, rungs 1 and 2 take over and the number becomes yours.

That seat has one read-out a company project does not: a crew-days line beside the hours — ≈ 1 crew-days at 4 man — because a scene with no company keeps its own crew setting where a company project takes the real crews.

What was and was not driven

All three rungs were driven, each on the seat where it is reachable: rungs 1 and 2 on a company job in one sitting, and rung 3 on an account registered for this chapter with no company at all. Every figure above is read off the screen and every division is of two numbers the product printed.

One case was NOT reachable and this chapter does not claim it: a company that exists but has nobody on its roster. Every company on the job this chapter was driven on has workers, so there was no empty roster to open. That case is not the same as the company-less seat above, and what it falls back to is not stated here because it was not watched.


What the calculation does not do

Five things a reader will reasonably assume, and be wrong about.

It shows you no money at all until the whole drawing has arrived

Open a project cold and watch. This was sampled every 400 milliseconds from the moment the page began to load, on the same 454-element house:

0.3 s

what the page had

nothing — no element count, no Calculate button

1.5 s

what the page had

0 elements, Calculate on the toolbar — no money anywhere on the page

7.7 s

what the page had

454 elements — the drawing is complete — still no money

9.8 s

what the page had

the first money appears

Not one zero and not one placeholder in the whole window. The count of money figures on the page goes 0 → 0 → 0 → 14; it never passes through a $0. A price on a building that has not finished loading is not a price, and the product would rather show you nothing than show you a number that is about to change.

Two and a bit seconds pass between the building being complete and the money appearing. If you are watching for it, that gap is the calculation running.

The distinction is loading against loaded, not empty against full — and that is worth being exact about, because the two look alike from the outside. A brand-new project that has finished loading and has nothing drawn in it does show you money, and the money it shows is zero:

TOTAL COST $0 · CLIENT PRICE $0 · MARGIN 0%

An empty job honestly costs nothing, and the estimate says so. A job that is still arriving does not yet have an honest answer, so it gives none.

It does not price your materials, and it never will

DrawToBid's catalog carries no prices at all — not a reference price, not a typical price, not a starter price. It carries norms: hours per unit, and how much material a unit of work eats. On the job in this chapter, 93 of 95 material lines had no price, and the estimate said so at the top of the Total tab rather than quietly treating them as free.

A price gets into your estimate exactly one way: you put it there, against one material on one project, from your own supplier's quote. There is no supplier list to pick from and there is not going to be one. The supplier note columns beside a price are a note to yourself.

Until a material is priced it contributes nothing, which is why an estimate on a fresh job can look reassuringly small and mean nothing at all. Read the BEFORE YOU COMMIT block before you read the total.

Freezing a line freezes the quantity, not the price

Once a scope has been signed off, the quantity on that line stops moving — the work that was agreed is the work that was agreed, and redrawing the building afterwards does not quietly change what was signed. The price on it is not frozen. A frozen line is shown at today's rate against the frozen quantity, so a rate you correct later is applied to it like any other line. Your customer's protection against a moving price is the signature on the agreed figure, not a second copy of the money stored somewhere else.

This is the one thing in this chapter that could not be driven, and the chapter says so rather than describing it from the outside. Getting a line frozen means getting a scope signed, and that road was closed on the job this chapter was walked on: the Progress billing tab refuses in words — "You cannot compose an application yet. The final price has not been sent to the customer for approval yet." No scope had been signed, so there was no frozen line on the screen to read. Chapter 8 is the road that gets you there.

It does not tell you how long the job will take

The estimate carries Hours — 2,470.28 of them on this job. Hours are not a schedule. Nothing on this panel knows how many people you will put on site, or in what order, or on which days. Chapter 10 is the job's calendar; this panel is the job's cost.

It does not export

There is no Export to PDF and no Export to Excel. Not greyed out, not behind a menu — the controls do not exist. If you need the figures outside DrawToBid today, the share link in chapter 6 is how you show them to somebody.


Who sees the money

The same button on the same job gives four different answers depending on who pressed it. Every seat below was signed into for real, and the money on each panel was counted — every figure carrying a $, in the text and inside the boxes — rather than glanced at.

you, the owner

tabs

8

money figures on the panel

present — cost, client price and margin

Save changes

present

a foreman in your company

tabs

2 — Total and Labor

money figures on the panel

client price only

Save changes

absent

the customer

tabs

4 — Total, Progress billing, Labor, Materials

money figures on the panel

none at all

Save changes

present

The foreman sees the price, not the cost

The heading says so before the figures do: "Project · Manual ch35 … (cost detail hidden)". And the Total tab that follows carries exactly one line of money:

CLIENT PRICE $0 Client price $0

No COST and no MARGIN. A foreman can see what the job is being sold for and run the work against it; what it costs you, and therefore what you are making on it, does not travel to that seat. There is no Save changes control either — that seat reads, it does not edit.

The customer sees only what has been agreed

This is the one to be sure of before you invite anybody. Signed in as the customer on a real job, the estimate carried zero money figures — not the cost, not your working client price, nothing. In their place, one sentence:

APPROVE FINAL PRICE — DRAFT Your contractor has not sent a price yet. When it arrives, you will be asked to approve it here.

Nothing crosses to the customer until you send it. The figure you are still moving about on your own Total tab is yours; the customer's screen stays empty until you press Request approval, and after that it shows the figure you sent and nothing else.

A worker, and anybody without a company

Sign in as a worker and go looking for the editor and you do not land on the company's job. You land on a scene of your own — an empty one — and the estimate you get there is the estimate of that empty scene:

TOTAL · LABOR · DETAILS · MATERIALS · EQUIPMENT · SETTINGS — six tabs, all zeroes, no Save changes

That is not the worker's seat on your job, and nothing is wrong: a worker reaches the job through the invitation you send, and what that seat carries is chapter 21.

An account with no company at all lands in exactly the same place and gets exactly the same six tabs — registered fresh and driven on this walk to be sure. It can draw, and it can press Calculate on what it drew; the job it is costing is its own scene, not anybody else's. Note the sixth tab: Settings exists on a scene with no company behind it and on no company project, because those numbers have nowhere else to come from.

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .