The DrawToBid manualSearch the manual

Chapter 14

Run the company

Every chapter so far has been inside a job. You made a project, drew a building, read its estimate, sent it to a customer, put people on the work and put some of it out to tender. All of that happens inside one project.

This chapter is the other place — the screens that belong to the company itself. Who is in it, what its work is worth an hour, what it charges on top of its costs, who is asking to be let in, and what its name is. Nothing here belongs to one job; everything here lands on all of them.

The price of every estimate your company will ever produce is settled here, in two halves that sit in two different places — what the work costs you, which comes out of the people and crews you entered, and what you add on top of that, which is a setting. Most owners never look at either. They are the substance of this chapter.

Everything below was carried out on the running product, in the order it is written.

Re-driven and illustrated on 4 September 2026. The rail was counted again from the owner's seat and from a foreman's, both settings screens were read control by control, and the same rail was walked as a worker and as a client guest. Every picture in this chapter was taken on that walk, at the size the product draws it, with a red ring round the one control its own paragraph is about. Where a section carries an older date, that section was not re-exercised in this pass and says so.


Where all of this lives

Open your company. However you get there — the account menu, a bookmark, or by typing the address — you land on the same shell: a rail down the left, a strip across the top, and one page in the middle.

The strip across the top says two things and nothing else: your company's name, and under it Your role: owner. At its right-hand end are the notification bell and your account button.

The rail below the DrawToBid · COMPANY ADMIN mark is the whole surface, in four groups:

PEOPLE

entries

Team · Crews · Join requests

CATALOG

entries

Rates & Works · Materials

PROJECTS

entries

All projects · Planning · Subcontractors · Access requests · Invitations

SETTINGS

entries

Company profile · Estimate / Markup

Twelve entries, and every one of them has an icon beside it. Counted on the running product on 4 September 2026 from the owner's seat and again from a foreman's: twelve entries, twelve icons, four groups. On the owner's seat none of them is greyed out.

Chapter 7 covers Team and Crews. Chapter 10 covers Planning. Chapter 11 covers Rates & Works and Materials. Chapter 13 covers Invitations. This chapter is the other six, plus the two things the rail does not show: what a foreman is locked out of, and what happens when you change the company's own name.

Every entry, and where it takes you

Each of the twelve was pressed in turn. This is where each one lands and what greets you there.

Team

the address it opens

/company/<your-company>/team

the page's own heading

Team

what is on it

your roster, one row per worker — chapter 7

Crews

the address it opens

…/crews

the page's own heading

Crews

what is on it

your crews, each with a lead and a list of members — chapter 7

Join requests

the address it opens

…/join-requests

the page's own heading

Join requests

what is on it

an inbox for people asking to join your workforce — below

Rates & Works

the address it opens

…/catalog/rates

the page's own heading

Rates & Works

what is on it

every work with the catalog's numbers beside yours — chapter 11

Materials

the address it opens

…/catalog/materials

the page's own heading

Materials

what is on it

materials you added yourself, with your prices — chapter 11

All projects

the address it opens

…/projects

the page's own heading

Projects

what is on it

your jobs as cards — below

Planning

the address it opens

…/planning

the page's own heading

Planning

what is on it

who is busy and who is free, across every job — chapter 10

Subcontractors

the address it opens

…/projects/subcontractors

the page's own heading

Subcontractors

what is on it

the other companies working on one of your jobs — below, and chapter 13

Access requests

the address it opens

…/access-requests

the page's own heading

Access requests

what is on it

people asking to be let onto one of your projects — below

Invitations

the address it opens

…/invitations

the page's own heading

Invitations

what is on it

projects another company has invited you onto — chapter 13

Company profile

the address it opens

…/settings

the page's own heading

Company profile

what is on it

your company's name and its web address — below

Estimate / Markup

the address it opens

…/settings/estimate

the page's own heading

Estimate / Markup

what is on it

what you add on top of your costs — below

Each of the twelve has its own picture, ringed on the rail entry, so you can find it on your own screen without counting rows.

There is no dashboard. Opening your company without naming a page takes you to Team — the list of your workers. That is the landing page, on the owner's seat and on a foreman's alike. Nothing anywhere in the company shell tells you how the business as a whole is doing: no total of work in hand, no money outstanding, no count of jobs running. If you want the state of the business you read it a project at a time, out of the estimates.

There is no Estimate defaults screen. The rail has no entry for one, and asking for its old address — /company/<your-company>/settings/estimate-defaults — gets you a plain browser "This page could not be found" with none of the company shell around it. Driven again on 4 September 2026 from the owner's seat. What replaced it is the section What your costs are built from, below.


All projects: your jobs, as cards

All projects is the first entry under PROJECTS in the rail, and it is the company's list of its own jobs. Press it and the address becomes /company/<your-company>/projects.

The page itself is headed Projects, not All projects. The rail says one word more than the heading; they are the same page.

What is on it

A grid of cards, one per project. Each card is in two halves — a picture tile on top and a body underneath carrying the project's name and the date it was last edited — and under the body a row of controls ending in a ⋯ menu, which the section The card's ⋯ menu below walks. The switches in that row (Show on your planner page, and on some projects Can edit this project) are not covered in this chapter. Read again on 4 September 2026, the grid held four:

DrawToBid funny home

the line under the name

Edited Sep 3, 2026

Craftsman Ranch

the line under the name

Edited Sep 3, 2026

DrawToBid editor scene

the line under the name

Edited Sep 2, 2026

DrawToBid editor scene

the line under the name

Edited Jul 14, 2026

They are ordered by when they were last edited, newest first — not alphabetically, not by age. The project you were last in is the first card. Two of those four carry the same name, and the Edited line is the only thing telling them apart; that is what it is there for.

The two halves of a card do two different things

Press the body — the name and the date — and the project opens in the editor, at /draw/<your-company>/<the project's number>. No intermediate dialog and no preview step: the card is the door.

Press the picture tile and your computer's file chooser opens, ready to put a picture on that project. The tile is a separate control from the body, so pressing it never opens the project — the page stays where it is. Until you upload one the tile reads + Add a picture. There are no pictures by default and DrawToBid supplies none; every picture on this page is one somebody in your company put there.

The chooser takes PNG, JPG or WebP, one file at a time, up to 20 MB. Give it something else and the tile answers on itself — "That kind of file isn't supported — use PNG, JPG or WebP." — and give it something too big and it answers "That file is too large — 20 MB is the limit." The answer lands on the card you pressed, not in a banner elsewhere on the page. The first of those two was driven and is quoted off the screen; the size refusal was not — a 20 MB file was not worth putting through the wire to read a sentence — so read it as the limit rather than as a verbatim quotation.

The picture is for recognising a job, and that is all it is. It is not a plan, not a rendering of your model, and it does not reach the estimate or your customer. Photograph the house, or the drawing pinned up in the site hut, and you will never again open the wrong one of two projects with the same name.

Once a project has a picture the tile stops being an invitation and becomes a window. It carries the photograph with a small ⤢ in the corner, and what it announces to a screen reader changes with it — from "Add a picture to Craftsman Ranch" to "Enlarge the picture of Craftsman Ranch".

Press it and the picture opens large, in a panel over the page headed with the project's name. There are three things on it and nothing else:

  • Replace picture — opens the file chooser again, on the same project. Pick a new photograph and it takes the old one's place.

  • Open project — goes straight into the editor for that project, the same place the card's body goes. So from the enlarged picture you can go to work without closing anything first.

  • ✕ — closes the panel.

Escape closes it too, and puts you back on the tile you pressed — if you opened it from the keyboard you are returned exactly where you were, not dumped at the top of the grid.

A tile with no picture on it does not do this. Pressing an empty tile opens the file chooser, as before; it does not open an empty panel and pretend there is something to look at.

Everyone in the company sees it, and can replace it. A foreman looking at the same card gets the same photograph, opens the same panel, and has the same three controls — Replace picture included. The picture is the company's, not the owner's.

The card's ⋯ menu: Make a copy and Archive

Each card ends in a ⋯ button. On the company owner's seat it opens a menu of two entries: Make a copy and Archive.

Make a copy makes the company's own copy of that project — everything drawn in it, as last saved — and opens the copy in the editor. The copy is named after the original with the next free number: the first copy of Craftsman Ranch is Craftsman Ranch (1), the next (2). The original is not touched.

The same menu is on a phone, on the same card:

This is the door a reworked house goes through: chapter 40 copies a "before" project to make its "after". The editor has the same copy on each row of File → Projects… (chapter 26).

Archive takes a project out of the grid without deleting it. Pressed on a card, it moved the card into a section headed ARCHIVED at the foot of the page, where it is marked ARCHIVED and carries its own ⋯. What that menu offers is not covered in this chapter.

What is not on this page

No rename, no delete and no version history. Those belong to the Projects… window inside the editor, under File — Chapter 3 walks it. There is deliberately not a second copy of it here.

There is also no filter box on a company this size. A search field appears above the grid only once the company holds more than twelve projects; below that it is absent rather than greyed out. This company has four, so the field was not on screen and this manual has not driven it.

New project

At the top right, beside the heading, is New project. It goes to /draw/<your-company> — the editor, on an empty scene. The name in the top-left reads Untitled project, the scene tree holds nothing but Project, and the status bar reads 0 elements.

Nothing on this route asks you for a name, and there is no create form. You draw first; the project comes into being when you press Save, and that first save is what creates it.

The editor's File menu has an item called New project too, and it is not the same thing. That one opens the Projects… window with a New project name… box and a Create & open button beside it — you name the project first and get the empty scene afterwards. Two routes and two habits: this page's button draws first and names later; the File-menu item names first and draws after. Chapter 3 walks the second.

If this browser has already been in one of your projects, New project may stop and ask. Pressed straight after opening another job in the same tab, the editor came up with that scene still on it and a question across the middle:

Is this the same project? This scene looks like your project «DrawToBid editor scene» (#116). Continue working on it? Nothing is saved yet — your changes are written only when you click Save. No, keep separate · Yes, same project

No, keep separate is the answer that means this is a new job — a later Save then creates a project instead of writing over that one. From a browser that had not been in a project, the same button opened a genuinely empty scene and asked nothing.

When there are none

A company with no projects gets no grid at all — no empty box, no placeholder cards. One sentence and the button:

No projects yet. New project

Projects other companies have given you

Underneath your own grid, and only if you have any, sits a second list headed Delegated to you:

Delegated to you Projects other companies have delegated to you as a subcontractor. Open one to view it in your scoped workspace.

SUB DrawToBid funny home — from [the contractor] — Open

They are rows rather than cards, they carry a SUB badge, and they name the company whose job it is — three differences at once, so a job somebody delegated to you can never be read as one of your own. Open takes you to the scoped view of that project, not to the full editor; Chapter 9 is that seat. A company with no delegated work sees nothing here at all, not an empty heading.

The old address still works

There is no work board anywhere in the product. This rail slot used to hold one, at /company/<your-company>/projects/board, and it is now All projects — a different page rather than a renamed one. The board showed one project at a time, chosen from a picker, with every work on it and the people and progress bars beside them; that reading was deleted rather than moved. Who holds a work and how far along it is belongs to the estimate's Labor tab (chapter 20 reads it) and to the work record (chapter 7).

Asking for the old address lands you on Projects, silently — no "this has moved" notice, and no error. Driven 21 August 2026 and not repeated since.

So where are your projects listed?

In two places, and they are not the same list.

  • Here, on All projects — every project the company has, as cards, with a picture and a last-edited date. This is the one you use to find and open a job.

  • In the editor, under File › Projects… — the same projects as a plain list with a size and a date, plus Open, Rename, Make a copy, Delete, version history and the New project name… box. This is the one you use to manage a job. Chapter 3 describes it.

The Subcontractors page carries a third enumeration, but it is not a list of projects — it is a Project selector at the top of the page that scopes everything below it to one job at a time.

Worth knowing before you go looking for it: a project is archived from its card on All projects, through the ⋯ menu, and only there. The editor's Projects window has Delete and no Archive.


Subcontractors: the other project page

Subcontractors carries its own Project selector at the top and everything below it is scoped to whichever job is chosen — "Every invite is for the selected project only." Where All projects is a list of your jobs, this page is about the other companies working on one of them.

It has three parts:

  1. Invite a subcontractor — a single search box, Search companies by name…. You find a company already registered on DrawToBid and invite it onto the selected project.

  2. Invited to this project — the registry: one card per company, with its lifecycle, the price it holds, and how many of your works it has won. "Pending until they accept; then their lifecycle, price and scope show here."

  3. Archived subcontractors — a collapsed list at the bottom, with a count beside it.

Chapter 13 is the whole road that fills this page: inviting companies, putting works out to tender, reading the offers and awarding one. This page is where you see the result of it, per project, from the company's side rather than the estimate's.

What a registry card says

Read on 4 September 2026, the one company on this project's registry read:

[the subcontractor] — ● Accepted — OFFERED ≈ $8,000 — PROVISIONAL — 1 work ↗ — [ Archive ]

Five facts and a link: the company, where it stands, the price on the table, whether that price is settled or still provisional, and how many of your works it is counted as holding. The arrow beside the count opens the estimate.

Archived subcontractors is a collapsed list at the bottom holding the companies you have finished with, in the same shape but with their lifecycle showing CLOSED. On a project that has archived none, the heading is not drawn at all rather than shown empty — which is what this project showed on 4 September, so this manual has not driven the list itself.

Archive is how a company leaves the list, and it will not let you do it while there is live work in their hands. On the card above it was greyed out under this explanation:

[the subcontractor] still has 1 work on DrawToBid funny home. Withdraw the subcontract in the estimate first — then you can archive them here.

Open the estimate ↗

The refusal is correct and the link takes you to where the withdrawal is done.

Choosing which job you are looking at

The PROJECT selector at the top of the page is what everything below it answers to. Change it and the invite box, the registry and the archived list all follow — "Every invite is for the selected project only."


Settings: the two screens under SETTINGS, and where the third one went

Under SETTINGS there are two entries, and they do two unrelated things:

Company profile

what it is for

your company's name and its web address

Estimate / Markup

what it is for

what you add on top of your costs to reach the price you charge

Every price your company quotes still has two halves — what the job costs you, and what you add on top to reach the price you charge — and only the second of them is a setting. Estimate / Markup is that second half, and this is where you set it.

The first half is not set anywhere under SETTINGS. It is built out of the people and the crews you actually entered, on the Team and Crews pages, and the section below walks it.


Company profile

The plainest screen in the product. Two fields and a note.

COMPANY NAME holds your company's name as everyone sees it — at the top of every company screen, and wherever else the product names your company.

COMPANY URL is shown, not edited, on the line beneath: /draw/your-company/…. Under it, in as many words:

Changing the name does not change the URL. Set a new URL below to change it.

CHANGE URL (ADVANCED) is the field that does change it. It starts empty, with your current address shown as grey placeholder text — so leaving it alone leaves the address alone.

Under the two fields, one Save.

There is nothing else on this screen. No currency, no units, no country, no tax rate, no language, no logo, no address, no tax number. Two fields and a button.

Beneath the card is a second, greyed one:

Billing — Coming soon — subscription plan, seats, and invoices.

There is no billing today. No plan, no seats, no invoices, nothing to enter and nothing to pay. The card is there to tell you that is coming.

Changing the name

Type over COMPANY NAME and press Save. That is all there is to it, and the screen is telling the truth when it says the address does not follow: driven on 4 September 2026, the name was changed to Northside Builders, and the COMPANY URL line still read /draw/your-company/… afterwards. Every company address kept working under the old spelling.

The new name is in force immediately, and the strip at the top of the shell repaints where you are standing — it read Northside Builders on the settings page itself, without a reload and without moving to another page. Move anywhere else and it is there too: the Team page read Workers of Northside Builders** on the next page load.

(The name was put back immediately afterwards, which is why every other picture in this chapter carries the old one.)

Changing the web address

CHANGE URL (ADVANCED) is a live field: while you type it says Checking… underneath, because it is making sure nobody else has that address. Press Save and the COMPANY URL line above rewrites itself to the new one.

Your old company links keep working. Opening the company shell at the old address afterwards lands on the same page at the new one — the address in the bar changes and the page is your page. Old bookmarks to Team, All projects or the settings survive the change.


Estimate / Markup: what you charge on top of your costs

This is the screen that turns what a job costs you into what you charge for it, and it is the most capable screen in this chapter.

Its own description:

Ordered markup & tax layers applied on top of internal cost to reach the client price. A layer's base can be a cost component, an earlier layer (compounding), or everything-so-far.

What ships with a new company

A company starts with a preset already loaded, and the five layers it lays down are on the screen the first time you open it.

There is no country to choose. At the top of the screen sits LOAD PRESET and, beside it, a single Load — and nothing else. There is no picker, no dropdown, no list of countries; the product is sold in the United States and the preset it loads is the United States one. Press Load and it asks before it does anything:

Load the preset? This replaces the current layer set.

Answer no and the five layers you had are still there, untouched — counted on the screen afterwards. Answer yes and your layer set is replaced by the preset's, which is a real loss if you have edited yours, and is why it asks.

The five layers the preset lays down, read off the running product on 4 September 2026:

1

name

Overheads

rate

10%

kind

markup

BASE — what the percentage is taken of

Labor

APPLIES TO

Self-perform only

2

name

Income

rate

20%

kind

markup

BASE — what the percentage is taken of

Labor

APPLIES TO

Self-perform only

3

name

Income on subcontracts

rate

10%

kind

markup

BASE — what the percentage is taken of

Subcontractors

APPLIES TO

Subcontract only

4

name

Taxes on Labor

rate

15%

kind

tax

BASE — what the percentage is taken of

Labor

APPLIES TO

Self-perform only

5

name

Income Tax

rate

30%

kind

tax

BASE — what the percentage is taken of

on Overheads · on Income · on Income on subcontracts

APPLIES TO

— none

The BASE column is the thing this chapter could not print before, and it is worth reading twice. Four of the five layers charge on Labor or Subcontractors alone. Not one of them touches Materials or Equipment. So the shipped preset marks up your labour and the work you buy in, and passes your materials and your plant through at what they cost you. If you mean to make a margin on materials, nothing in the box does it for you — you add a layer.

And layer 5 is the compounding the description mentions, doing real work: Income Tax charges 30% on the three markup layers above it, not on the job. That is why it has no APPLIES TO of its own — see below.

What one layer is made of

Every layer is the same four things, plus its position in the stack.

  • A name. Free text — it is what the customer's price breakdown calls this line.

  • A percentage.

  • markup or tax. A button that flips between the two words. Pressed on layer 1 it read markup, became tax, and came back to markup on a second press. Nothing is written until you Save.

  • BASE — a row of chips saying what the percentage is taken of: Labor, Materials, Equipment, Subcontractors, Everything-so-far, and then one chip per layer above this one, each reading on <that layer's name>. A chip that is ON is filled in; one that is off is a plain outline. That last group is the compounding: layer 2 can be charged on layer 1's result.

  • APPLIES TO — a picker with three answers: All lines, Self-perform only, or Subcontract only. That is how the shipped preset charges 20% on your own work and 10% on work you bought in, in two separate layers.

A layer that charges only on other layers has no APPLIES TO at all. Layer 5 draws from three compounding chips and nothing else, and the picker is not on that row — it is not greyed out, it is absent. That is deliberate rather than missing: a layer charged on earlier layers takes their scope, so a control there could only be set and ignored. Four of the five shipped layers carry the picker; the fifth does not.

Switch the Materials chip on and a fourth control appears under the row — a three-way asking which materials this layer applies to:

MATERIALS — ○ All materials · ○ Allowance materials only · ○ Everything except allowances

It arrives already set to All materials, and it is not drawn at all while the Materials chip is off — which is why you will not see it on a company that has never touched the preset. It is on markup layers only; a tax layer has one materials base and no split.

Beside each layer are ↑ and ↓ to move it in the order, and ✕ to remove it. The order is the calculation order: the arrows are greyed out at the two ends of the stack — the top layer's ↑ and the bottom layer's ↓.

At the bottom sit + Add layer and Save, and one last line: No markup on allowance materials.

+ Add layer appends an empty sixth one at the bottom — named New layer, 0%, markup — for you to fill in. ✕ takes it straight back off; driven on 4 September, five rows became six and six became five again. Neither is written anywhere until you press Save, so you can add one, look at it and remove it without consequence.

The last line is a read-out, not a control. No markup on allowance materials is what the current layer set works out to for materials you have priced as an allowance, and it is there because that is the one markup figure your customer is ever shown. Change a layer so that it does charge on allowance materials and this line is replaced by what the customer will see instead.

It works, and here is the proof

The point of a settings screen is what it does to a real job, so this was driven rather than described. What follows is the record of one measurement, taken again on 22 August 2026 on one job — the before, the change, and the after. The figures are that job's; the mechanism they demonstrate is every job's. Do not expect to find these numbers on your own screen, and do not expect to find them on that job either: the setting was put back afterwards, and the job keeps moving.

On that project, before touching anything:

COST $210,454.88 · CLIENT PRICE $237,059.17 · MARGIN 11.22% Overhead, tax & markup (12.6%) +$26,604.29

Then one number was changed on this screen — layer 2, Income, from 20% to 40% — and Save pressed. Reloading the settings page showed 40, so it had stuck. Then the same project's estimate was opened again:

COST $210,454.88 · CLIENT PRICE $249,367.88 · MARGIN 15.60%

The cost did not move by a cent — nothing about the job changed. The client price grew by $12,308.71, and the margin went from 11.22% to 15.60%. Since cost plus the overhead-tax-and- markup line is exactly the client price ($210,454.88 + $26,604.29 = $237,059.17, to the cent), that line grew by the same $12,308.71 and nothing else did. That is the whole mechanism in one comparison: this screen never changes what a job costs you, only what you charge for it.

Then Income was put back to 20% and Save pressed again, and the estimate was read a third time. It came back identical to the first reading, to the cent — $210,454.88, $237,059.17, 11.22%, and the same +$26,604.29 markup line. So the change is a lever, not a ratchet: it goes both ways and leaves nothing behind.

Why this example was re-measured, and what that tells you about every figure in this manual. It was first taken on 17 August 2026, when the same job read COST $223,664.35 at an 8.21% margin. Five days later the same job, at the same 20% Income setting, reads $210,454.88 and 11.22%. Nothing on this settings screen did that — the job changed: works were drawn, a subcontractor was swapped, money was billed. Chapter 13 puts it best about a different pair of numbers on the same project: read the difference, not the two totals. The $12,308.71 is the part that will be true on yours. The $210,454.88 will not.

It applies to projects that already exist, not only to new ones. The project used here was drawn, priced, approved and part-billed long before the setting was touched.

It is worth knowing where this screen's numbers do not reach. A view-only share link does not use them — Chapter 6 measures that in detail: what a stranger's browser is sent is the drawing, never your rates or your markup, so the price it prints for them is worked out with generic assumptions and comes out different from yours. Nothing you set here changes that.

⚠ One consequence to be ready for, watched on 17 August 2026 — the earlier run of the same experiment, and the pair of figures below belongs to that day rather than to the reading above. That project had already been approved by its customer at $205,972.86. Changing the markup did not touch the approved figure — it stayed locked, exactly as it should — but it did grow the change-order draft sitting behind it, from +$37,691.66 of unsent changes to +$44,755.07. The two amounts are that day's; the behaviour is every day's. So changing your company markup while a job is live is not a quiet internal adjustment: it becomes a price change your customer will be asked to approve. Change it between jobs if you can.


What your costs are built from

The other half of the price, and the one nobody sets on a settings screen.

There is no settings screen for this half of the price, and there is not meant to be one. The company's costs are built out of the people and crews you actually entered, on Team and Crews. What follows was driven on 21 August 2026, and the absence of the settings screen was confirmed again on 4 September — its address answers a plain 404 from the owner's seat and from a foreman's alike.

Why there is no screen for it

Until 18 August 2026 there was one, and it asked for two numbers: a DEFAULT CREW SIZE and one flat LABOR RATE for the whole company. Both were numbers you had already given the product somewhere else, and it did not use the ones you had given it.

You enter your workers, and each of them carries an hourly rate. You build your crews, and each crew has people in it. A company that has done both has already said what an hour of its work costs and how many people it puts on a job — so a second, company-wide box asking for one flat rate and one flat crew size could only ever disagree with the roster, and a flat rate does not distinguish your $18 labourer from your $36 general builder.

So there is no third place to set either number. What an hour costs comes from the person doing the work, and how big a crew is comes from the crew.

The hourly rate lives on each worker

Team — the first entry in the rail, and the page your company opens on.

The roster is a table of eight columns: NAME, TRADE, TYPE, HOURLY RATE, ROLE, CREWS, ACCOUNT, STATUS — counted again on 4 September 2026, still eight. The fourth of them is the number this section is about, and it is per person. The rows below are the roster as it stood on 21 August 2026, when the arithmetic further down was worked through; that company has since taken on more people, so read the method rather than the names:

Al Peterson

trade

HVAC technician

type

1099

hourly rate

$60/h

crews

—

Billy Green

trade

laborer

type

W-2

hourly rate

$18/h

crews

Framing Crew

Chris Miller

trade

drywaller

type

W-2

hourly rate

$25/h

crews

Finishing Crew

Dan Harris

trade

roofer

type

W-2

hourly rate

$30/h

crews

—

Danny Fielder

trade

laborer

type

W-2

hourly rate

$22/h

crews

Finishing Crew

Frank Adams

trade

general builder

type

W-2

hourly rate

$36/h

crews

Framing Crew

Jake Thompson

trade

carpenter

type

W-2

hourly rate

$32/h

crews

Framing Crew

Luis Ortega

trade

concrete worker

type

W-2

hourly rate

$26/h

crews

Framing Crew

Every row ends with Edit and Deactivate. Edit opens Edit worker, and the rate is a required field there — Hourly rate ($/h) — required — beside Name, Trade / specialty, Employment type and Linked account. The dialog states its own scope in a line worth reading before you change a number:

The hourly rate is the worker's global base rate — changes apply to future work. Piece rates are set per work at assignment time.

Two things follow from that sentence, and both matter more than anything the old settings screen did. The rate is global to the worker, not to the job — change it and every future job prices that person at the new figure. And a change does not reach back into work already priced, so correcting a rate is not a way to re-price a job you have already quoted.

The crew size is however many people are in the crew

Crews, the second entry in the rail. There is no size field anywhere on it.

A crew is a name, a LEAD, and a list of people. You add people with Add member… and remove them with the × beside each name; the size is the length of that list and nothing else. On the company used here:

Framing Crew

lead

Frank Adams

members

Frank Adams · Jake Thompson · Luis Ortega · Billy Green

Finishing Crew

lead

Danny Fielder

members

Chris Miller · Tomasz Kowalski · Pete Nowak · Danny Fielder

Note that a lead counts as a member of their own crew — Frank Adams and Danny Fielder each appear in the list they lead. Four people in a crew is four people, and you never type the four anywhere.

What the estimate does with them

This is the part the old section got wrong, and it is worth following through one work.

Open a project's estimate and go to the Labor tab. Every work is a row carrying, among other columns, HOURS and PAYMENT. One of the works on the project used here:

Timber-frame structural wall (1 SF) ×2 — quantity 2,711.459 — HOURS 352.67 — PAYMENT $9,521.94 — coverage 100% · 4 workers

Expand the row and the four workers are named, each with their hours and their share:

Frank Adams

trade

general builder

hours

88.2

share of the work

25%

their roster rate

$36/h

Jake Thompson

trade

carpenter

hours

52.9

share of the work

15%

their roster rate

$32/h

Luis Ortega

trade

concrete worker

hours

105.8

share of the work

30%

their roster rate

$26/h

Billy Green

trade

laborer

hours

105.8

share of the work

30%

their roster rate

$18/h

Now do the arithmetic the product did. Weight each roster rate by that person's share of the work:

0.25 × $36 + 0.15 × $32 + 0.30 × $26 + 0.30 × $18 = $9.00 + $4.80 + $7.80 + $5.40 = $27.00 an hour

and divide the row's own two figures:

$9,521.94 ÷ 352.67 hours = $26.9996 = $27.00 an hour

The two are the same number. The labour cost on that row is the real rates of the four real people holding it, blended by how much of the work each one holds — which is what you would have got if you had costed it by hand off the roster, and is not something any single company-wide number could have produced. (The last hundredth of a cent is the screen rounding the hours and the shares it shows you; the roster rates themselves are whole dollars.)

One piece of advice worth keeping. If the labour cost on an estimate matters to you, read it off the estimate — the hours and the payment on the work's own row — where you can check it against your own roster in one line of arithmetic, exactly as above. No screen anywhere else in the product states that rate, and one that did could only disagree with the roster.

So how do you change what a job costs you?

Three answers, and none of them is a settings page:

  • change a person's rate on Team › Edit, which changes every future job that person works;

  • change who holds the work, and in what shares — the blend follows the shares, so which of your people carries a work is itself a pricing decision. Chapter 7 is how work is handed out and how a share is set; this section is only saying what it does to the money;

  • change what you charge on top, on Estimate / Markup, which is the other half of the price and the subject of the previous section.

The duration line, and when you get one

The estimate's Total tab can print a second line under the Hours row — ≈ 25.27 crew-days at 4 man — turning man-hours into a number of days. Most of the time it does not, and it is worth knowing exactly why, because its absence is not a fault. Driven on 21 August 2026, the Total tab prints:

Payment workers $45,055.37 Hours 1,443.61 Materials (net) $155,095.74 …

and the Hours row carries the hours and nothing else.

A day-count appears only when real crews are actually on this project's works. Not when your company has crews — this company has two, of four people each — but when a crew has been put on the work as a crew. Assign people one at a time and the estimate has no crew in view; it then prints the man-hours alone rather than dividing them by a crew nobody put on the job. That is deliberate: the number it would have to invent is the one number a builder would trust and should not.

Asked directly for this project, the server says so in as many words — crew size 1, source default — and default is what every part of the product reads as no real crew, so no day-count. The four people on the wall on this job were assigned individually, so default is the honest answer.

Put a whole crew on the work and the division comes back, out of that crew's actual member count rather than a number anybody typed. Chapter 7 is how work is handed to a crew.

Until then: the estimate tells you what a job costs and how many man-hours it holds, and leaves the duration to you. Divide the hours by the crew you mean to put on it.


What a foreman sees

Everything above is the owner's seat. Sign in as a foreman and you land on the same page — Team — the strip reads Your role: foreman, and the rail keeps all twelve entries with all twelve icons. Five of them are greyed out, and each one says why before you press it, in the rail itself:

Join requests

what the greyed entry says

Owner only — approve people asking to join your team

Access requests

what the greyed entry says

Owner only — approve inbound project-access requests

Invitations

what the greyed entry says

Owner only — invitations from other companies

Company profile

what the greyed entry says

Owner only — company profile and billing

Estimate / Markup

what the greyed entry says

Owner only — markup, tax and the client price

Those five are not links at all — there is nothing to click, so a foreman cannot even open them by accident.

Typing those addresses in directly does not get round it. Each page loads its heading and one line in place of its contents:

…/access-requests

what the page says instead

Not authorized — approving inbound access requests is managed by the company owner.

…/invitations

what the page says instead

Not authorized — invitations from other companies are managed by the company owner.

…/settings

what the page says instead

Owner only — company profile and billing are managed by the company owner.

Chapter 7 covers the rest of the foreman's view of Team and Crews.

On the pages of this chapter a foreman can reach:

  • All projects — the whole list, exactly as the owner sees it. Driven as the seeded foreman on 4 September 2026: the same four cards in the same order, each with its picture tile and its Edited date, and the same New project button at the top right. A foreman may upload a project picture, which is the one thing on this page anybody can change.

  • Subcontractors — the registry is there and readable, with the same project selector and the same card, but the invite box is replaced by one line: "Inviting subcontractors is owner-only." No search box, and the Archive button is not offered.

  • Rates & Works and Materials — readable, and nothing on either is editable. Chapter 11 walks what a foreman sees there.

  • Team and Crews — the two pages the section What your costs are built from sends you to. A foreman reaches both; chapter 7 says what he may change on them.

The markup is the one thing a foreman cannot even read

Four of the five greyed entries are screens he may not change. Estimate / Markup is different: it is a READ he is refused. A foreman cannot see what your company adds on top of cost — not the layers, not the percentages, not the order they are applied in.

Asked for by its own address, the page loads its heading and one line in place of the constructor:

Estimate / Markup — Owner only — markup, tax and the client price are set by the company owner.

What this means for you: a foreman working out what to quote is working from cost, not from price. If you need him to know your markup, tell him; the product will not.


The seats with no company at all

Two more accounts were signed in and sent to the same address, on 4 September 2026, to answer a question the rail cannot: what does somebody who is not in your company see where the rail would be?

A worker — an account linked to a person on your roster, but not a member of the company — and a client guest both get the same card, and it is the whole page:

No access to this company You don't have an active invitation to this company workspace. Back to editor

No rail, no strip, no heading, no empty tables. A refusal in one sentence and a way out. It is the same answer at every company address, the settings screens included.

What the product offers a person with no company, and where it says so

The company area offers them nothing at all — and that is correct, because a company is not something you can be shown until you have one. Where the product tells them what they need is their own account page, and it is one block with one button:

Create your company A company is where your projects live. It runs on a subscription, so that comes first — you only need a payment method, nothing about the company itself. Once it is active, you create the company on the next screen. [ Subscribe ]

That is the whole road, and the order matters: the subscription comes first and the company form comes after it. Until then the person can open the editor and draw — the guest scene chapter 3 describes — but they cannot save a project, share one, or reach any screen in this chapter. Chapter 2 walks the road from that button to a company that exists.


The two queues: people asking to be let in

The rail has two inboxes for people knocking on the door, and they are for different things:

Access requests

who it is for

Companies and customers requesting access to your projects. Approve with a role, or decline.

Join requests

who it is for

People asking to join your team as a worker or foreman. Approve to add them to your roster, or decline.

Both start empty, each with a line telling you what would put something in it. Read on 4 September 2026 with nothing waiting in either:

Access requests — No pending access requests. When someone requests access to one of your projects, it appears here.

Join requests — No pending join requests. When someone asks to join your team, it appears here.

One of them can be filled; the other cannot. What follows — a person requesting access, the card you get, approving with a role and declining — was driven on 21 August 2026 and has not been repeated in this pass; the queues were empty on 4 September and no second account was put through the road again.

How somebody ends up in Access requests

They open a link to one of your projects while signed in to an account you have not let in. That is the whole mechanism, and it was walked from both ends.

Two people who are on your roster but have no access to the project were each sent the project's address. Each of them saw this, and nothing else — no error code, no dead end:

This page is unavailable

Request an invitation and the owning company will review it. You'll get access to this project once they approve.

Requesting as [email protected] Add a note (optional) — Why you need access… [ Request an invitation ]

The email is theirs, shown and not editable — you will be reviewing a request from a known account, not from a name somebody typed. The note is optional and free text.

Pressing the button replaces the card with:

Request sent — The company owner will review your request. You'll get access to this project once they approve it.

What you see, and what you do about it

Open Access requests and each person waiting is one card:

[the worker] ([email protected]) · PROJECT Requested access to DrawToBid funny home "I am putting the drywall crew together and need to see the scope." [ Approve… ] [ Decline ]

The card tells you everything you need to decide: who (their account), which job — named, not numbered — and why, in their own words.

Approve… does not approve anything. It opens the card out into a small panel:

ROLE — Subcontractor · Customer · Worker · Foreman Grant access to: DrawToBid funny home [ Approve access ] Cancel

You must pick a role, and the role is the whole decision — it is what this person will be able to see and do on that job. Chapters 6, 7 and 9 describe the four: a Customer reads the price and approves it; a Worker sees their own works; a Foreman checks other people's; a Subcontractor is another company doing a package. The line underneath names the one project they will be let into — the one they asked about, and nothing else of yours.

Press Approve access and the card leaves the queue. Press Decline on the other one and it leaves too.

With both handled, the page reads "No pending access requests. When someone requests access to one of your projects, it appears here."

What the approved person got

The approved one. Signing in no longer drops them into an empty guest scene — it takes them straight to a page of your projects:

Shared projects — Projects [your company] has shared with you. Open one to view it in your scoped workspace.

DrawToBid funny home — Open

Pressing Open puts them inside the project in the seat you gave them. Approved as a Worker, the editor opened with a banner reading "Worker view — mark your assigned works done and send them for review. Everything else is read only" and a MY WORKS (1) panel down the side.

Approving somebody does not add them to your roster. The Team page is exactly as it was — same people, same count. Roster entries and access grants are two different things, and this queue only does the second (Chapter 7 explains the difference).

Join requests

Your workers cannot ask to join you; you add them. Build the roster and send invitations yourself, as Chapter 7 describes.


Two things that are true here, as everywhere

All money is in US dollars. Nothing on either settings screen offers a currency. The worker rates are $/h, the markup layers are percentages, and there is no switch to look for — searched control by control on both screens on 4 September 2026 and there is not one.

All measurements are feet, inches, square feet, pounds and cubic yards. There is no unit setting on the company screens either. You do not choose it and you cannot change it.

If you came to these screens looking for either control, that is why you cannot find it.


Where this chapter stops

Everything above was reached and driven. Three things were not, and each is named so its absence is not read as a pass:

  • Billing. The card says Coming soon and there is nothing behind it. Nothing was tested because nothing is there.

  • A second company on one account. Everything here was walked by an owner who belongs to one company. What the header does when an account belongs to two is outside this chapter.

  • The Archived subcontractors list. The project driven has archived nobody, and the heading is not drawn at all when the list is empty, so there was nothing to open.

What this chapter did not cover

  • Team, Crews and the roster — Chapter 7.

  • Rates & Works and Materials — Chapter 11.

  • Planning — Chapter 10.

  • Invitations and the whole tender road that fills the Subcontractors registry — Chapter 13.

  • Creating the company in the first place, and the subscription that comes before it — Chapter 2.

  • The furniture these screens are built out of — a window that closes on Escape, a button that greys rather than vanishing, a hover text, a form that holds its submit — Chapter 25.

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .