Chapter 40
Rework a house: before and after
A house that is being reworked is two jobs. First something comes off: a roof is torn off, a window comes out, a wall is opened up. Then new work goes in. DrawToBid prices this as two projects. "Before" is the house as it stands, with what comes off marked for demolition, and its estimate is the demolition estimate. "After" is a copy of "before". In the copy you take out what came off and build the new work, so its estimate prices only the new work.
This chapter walks both projects, in order. You open the house as it stands, mark it, mark what comes off, and read the demolition estimate. Then you copy it, take out what came off, build the new work, and read the second estimate.
Everything below was carried out on the running product, signed in as the company's owner, on a company project that already held a drawn house.
The three states every element can be in
Every element you place is in one of three states. The state decides what the element puts into the estimate:
| state | what the estimate does with it | its mark in the scene tree |
|---|---|---|
| Build | prices it as work to do: the hours at the work's norm and its materials to buy. Every element starts here. | none |
| Demolish | prices it as work to take down: the hours at the work's demolition norm, and its materials as a quantity to remove and haul away. Nothing is bought. | a pickaxe |
| Existing | keeps it in the drawing and leaves it out of the estimate. It adds no hours, no materials and no haul-off. | a house |
Build
what the estimate does with it
prices it as work to do: the hours at the work's norm and its materials to buy. Every element starts here.
its mark in the scene tree
none
Demolish
what the estimate does with it
prices it as work to take down: the hours at the work's demolition norm, and its materials as a quantity to remove and haul away. Nothing is bought.
its mark in the scene tree
a pickaxe
Existing
what the estimate does with it
keeps it in the drawing and leaves it out of the estimate. It adds no hours, no materials and no haul-off.
its mark in the scene tree
a house
The same three presses, Build, Demolish and Existing, appear in three places:
above the scene tree, for whatever you have selected;
on the card of the work you are about to place, for everything you add;
on the roof planner card, for the roof it builds, layer by layer.
Demolish is only offered on a work that has a demolition norm. Where a work has none, its Demolish press stands greyed in place, and pressing it tells you why. See When Demolish is greyed below.
"Before": open the house as it stands
Open the project that holds the house. Draw it as it stands, the way chapter 4 describes. You are recording what is there, not designing anything new.
Give the project a name that says which of the two it is. Open File, then Projects…, press the pencil beside the project's name, type the new name and press the tick. Here it is Craftsman Ranch — before.
Mark the whole house Existing
The house as it stands is not work you will do, so it should cost nothing. Mark all of it at once.
In the scene tree, press the name Building 1. The building is selected.
Look above the tree. Under Clone and Delete there are three presses: Build, Demolish and Existing. With the building selected, Build is held.
Press Existing. The press is held, and every element under the building is now Existing: the walls, floors, partitions, windows and the whole roof.
Open the building in the tree and every element's row carries a small house before its name. That is the Existing mark.
Open the estimate and it is empty. Calculate shows a Cost of $0, and the Labor tab reads No work rows. That is correct. Nothing is being built or taken down yet.
When nothing in the tree is selected, or only the project row, the three presses stand greyed. There is nothing for them to set.
Draw what you add already marked
Some of the house may not be drawn yet: a window, a partition, a deck. You do not have to add it and then mark it. The card of the work you are placing carries the same three presses, and whatever you add takes the state the card holds.
On the Constructor tab, open Openings and choose Window installation. The card at the top reads the work's name, EA | billed by the piece | 9 materials. Under that line sit Build, Demolish and Existing, with Build held.
To add a window that is already there and stays, press Existing, then Add Window. The new window is Existing from the start.
To add a window that comes out, press Demolish, then Add Window.
The new window is selected when it arrives, the presses above the tree hold Demolish for it, and its row carries a pickaxe before its name. The card stays on the state you chose after the Add, so the next window you add goes in the same way. Press Build on the card when you move on to drawing new work.
Mark an element that is already placed
To mark something already in the drawing, select it and press the state you want.
Select the element in the scene tree. Here it is an interior partition. With the whole house marked Existing, the presses above the tree hold Existing.
Press Demolish. It is held, and the partition will be priced as removal. Its row now carries the pickaxe.
The presses act on everything you have selected, so one press marks one element, a group of elements, or a whole building.
When Demolish is greyed
A work can be demolished only when it has a demolition norm: the hours it takes to take one unit down. The catalog carries that norm for the works a rework most often starts with. In this house the walls, the partitions, the windows, the foundation and every layer of the roof have one. It does not carry one for every work.
Select the concrete floor screed of this house and Demolish stands greyed, while Build and Existing stay live. Press it anyway, and a card says why:
Concrete floor screed has no demolition norm in the catalog.
As the company's owner, the card carries a way in: Set your own norm.
Set your own norm opens Rates & Works in the company workspace. Type the work's name into the search box. Its row carries two demolition columns. OUR DEMOLITION NORM is the catalog's figure, and reads No norm for the screed. YOUR DEMOLITION NORM is your own, and reads — until you set it.
Press the YOUR DEMOLITION NORM cell, type the hours per unit, and press Enter. Here 0.02 was typed and the cell reads 0.02 h/SF. The unit is the work's own: square feet for a screed.
Go back to the project and select the screed again. Demolish is live.
A norm is hours, not money. The estimate prices those hours the same way it prices any other work's hours, as chapter 35 describes.
Mark the roof, layer by layer
A roof is rarely all or nothing. On a re-roof the shingles come off while the deck and the framing stay. The roof planner builds the roof in layers, and its card lets you mark each layer.
Open the Workbench from the right-hand rail of the editor. The Roof planner card shows a picture of the roof, the count of slopes, lines and elements, and one row, Roof, with Build, Demolish and Existing. Build is held.
Press Existing on the Roof row. The card opens out into the layers this roof is built from: Roofing, Sheathing, Framing, Closing box and Soffit. Each now holds Existing.
Press Demolish on Roofing. The shingles, the underlayment, the ridge caps and the valley linings are now marked to come off. The Roof row holds no single press any more: Demolish and Existing are both outlined dashed, because the roof now carries both.
Demolish is live on all five layers of this roof, so each can be marked on its own. On a re-roof only Roofing comes off.
Press Build roof. The states you set are applied as the roof is built.
A roof already stands on this house, so a warning comes first, headed The standing roof will be replaced. It tells you that building the roof removes the framing that stands now and builds it again, and that demolition states set on single roof elements will be lost. The states you set on this card are not lost; the build applies them. Press Replace the roof.
The card reports what it built.
Press Save in the top bar when you are done marking.
Read the demolition estimate
Press Calculate.
Labor: one Demolition group, first
On the Labor tab everything you marked Demolish sits in one group, Demolition, at the top of the list. It is counted as (9) here. Nothing marked Existing appears anywhere: there is no Foundations group, no Walls group and no Floors group.
Open the group. Each row reads what is being done: Asphalt shingle tear-off, not the installation it came from.
| row | quantity | hours |
|---|---|---|
| Partition wall demolition | 155.355 SF | 8.08 |
| Underlayment removal | 3,537.211 SF | No separate time |
| Asphalt shingle tear-off | 3,537.211 SF | 53.07 |
| Ridge cap removal | 246.785 LF | No separate time |
| Valley lining removal | 79.035 LF | No separate time |
| Window removal | 1 EA | 1 |
| Inner casing removal | 17.06 LF | No separate time |
| Outer casing removal | 17.06 LF | No separate time |
| Window stool & apron removal | 3.937 LF | No separate time |
Partition wall demolition
quantity
155.355 SF
hours
8.08
Underlayment removal
quantity
3,537.211 SF
hours
No separate time
Asphalt shingle tear-off
quantity
3,537.211 SF
hours
53.07
Ridge cap removal
quantity
246.785 LF
hours
No separate time
Valley lining removal
quantity
79.035 LF
hours
No separate time
Window removal
quantity
1 EA
hours
1
Inner casing removal
quantity
17.06 LF
hours
No separate time
Outer casing removal
quantity
17.06 LF
hours
No separate time
Window stool & apron removal
quantity
3.937 LF
hours
No separate time
Two things are worth noticing in that list:
A window comes out with its trim. Its casings and its stool and apron are rows of their own.
Some rows read No separate time. These pieces come off in the time of the work they belong to: the underlayment and ridge caps with the shingle tear-off, and the casings with the window. They are still listed, because they are still taken off and hauled away. They add no hours, and there is nobody to assign to them.
The hours are priced the same way as every other work's hours in the estimate.
Details: what comes off, and what it weighs
On the Details tab, press + Materials & Equipment. Under each demolition row the list is headed TO REMOVE, not Materials. It lists what the element is made of, in the quantity that stands, with no price anywhere, because none of it is bought. The last line is that row's Haul-off. For the partition that is 310.711 SF of gypsum board, 80.502 LF of studs, 33.15 LF of plates, the tape, compound and screws, and Haul-off 901 lb · 1.7 CY loose.
Total: the haul-off
On the Total tab, Haul-off sits under Hours. It is the weight and the loose volume of everything coming off: 6.67 tons · 19.1 CY loose here. That is what you size the dumpster by. Under the label it names what it could not count: 6 works have no haul figures and are not counted. Those are the pieces that carry no weight or volume of their own in the catalog.
In a "before" project the demolition labor is the whole cost, so the Total tab does not repeat it on a line of its own. The Cost figure at the top is that labor: $2,024.32 here, for 62.15 hours.
By party
On the By party tab the company's card carries one line, Demolition labor.
"After": make the copy
"Before" is finished. Now make the project the new work is priced in: a copy of "before".
Open All projects in the company workspace. Every project is a card.
On the "before" card, press ⋯. The menu offers Make a copy and Archive.
Press Make a copy. The copy is made and opens in the editor. It takes the same name with (1) after it: Craftsman Ranch — before (1).
Rename it so the two cannot be mixed up. Open File, then Projects…, press the pencil beside the copy's name, type the new name and press the tick. Here it is Craftsman Ranch — after.
The copy carries everything "before" held: every element, every Existing and Demolish mark, and the roof card's layer states. Open the building in the tree and the rows carry the same house and pickaxe marks. Its estimate, as copied, is still the demolition estimate.
The same copy can be made without leaving the editor. In File → Projects…, every row carries a copy button beside the history and delete buttons.
Press it and the copy is made, but not opened: a line at the top of the dialog names it, and its row is at the top of the list with its own Open.
Take out what came out
In "after", what came off is gone. Delete it.
Select an element that came out whole: here the window marked Demolish.
Press Delete above the tree.
Do the same for every other element that came out whole: here the partition.
Do not delete anything from the roof. The roof comes back through its card, below.
Put the roof back
The roof card in the copy still holds what "before" held: Roofing on Demolish.
Press Build on Roofing. The new shingles, underlayment, ridge caps and valley linings are now work to do. The deck and the framing stay Existing.
Press Build roof, then Replace the roof in the warning.
Build the new work
Draw what goes in, the ordinary way. Check that the work card holds Build, because the card keeps whatever state you last chose. Here a new window goes in: Window installation, Build, Add Window. Everything that stays remains Existing.
Press Save.
Read the "after" estimate
Press Calculate. There is no Demolition group and no Haul-off. What is left is the new work, filed in its own groups: here Openings (16) and Roof (7).
Open them and every row is new work: the window, its casings and its stool and apron, and the new roofing. The rows in grey, struck through and marked Excluded from estimate — not paid, are switched off in this project and count for nothing; among them are the tile and metal roofing this roof could have taken instead.
The Total tab reads Payment workers, Hours and the cost of the new work alone: $3,238.24 for 99.42 hours here.
What the two projects give you
| "before" | "after" | |
|---|---|---|
| what it prices | taking down what comes off | building what goes in |
| its groups | one: Demolition | the building's own, new work only |
| cost, on this house | $2,024.32, all of it demolition labor | $3,238.24 |
| hours | 62.15 | 99.42 |
| haul-off | 6.67 tons · 19.1 CY loose | none |
| what stays | Existing, not counted | Existing, not counted |
what it prices
"before"
taking down what comes off
"after"
building what goes in
its groups
"before"
one: Demolition
"after"
the building's own, new work only
cost, on this house
"before"
$2,024.32, all of it demolition labor
"after"
$3,238.24
hours
"before"
62.15
"after"
99.42
haul-off
"before"
6.67 tons · 19.1 CY loose
"after"
none
what stays
"before"
Existing, not counted
"after"
Existing, not counted
Two estimates, one for each half of the job. Neither counts the house that stays. If you find more to take down once the work has started, mark it in "before".
On a phone
The same presses are on a phone, in the phone's own places. On a phone they are not in the Scene sheet: they stand with the selected element, at the top of the Element sheet, on every one of its tabs. Select a row in the tree (here the Walls group), then press the panel button at the right of the tree's top row:
The Element sheet opens with the selection's presses: the line above them says what is selected and how many elements they change (Walls · 25 elements), then Clone, Delete, and Build, Demolish and Existing. A group goes all at once, every element under it; a group of mixed states shows every state present and none held.
On the work's card, in the Element sheet:
On the roof planner card on the Workbench:
The demolition estimate reads the same. The Demolition group comes first, and each row is a card:
The Haul-off on the Total tab:
Make a copy is on the project card's ⋯ menu:
It is also a copy button on each row of Projects…, which the phone keeps in the ⋮ menu at the top right:
Delete stands beside Clone, a little apart, at the top of the Element sheet:
And the "after" estimate, with no Demolition group:
What this chapter does not cover
The demolition norms the catalog itself carries, and how they are entered.