Chapter 21
Work as a worker
Everybody in this manual so far has been running something: a company, a job, a subcontract, a budget. This chapter is about the person doing the work — the plasterer, the framer, the painter whose name is on the roster and who is expected on site on Wednesday morning.
He is not a manager of anything. He does not price the job, he does not order materials and he does not open the drawing. DrawToBid gives him a screen of his own carrying the works handed to him, when he is due, and one figure about himself — his own hourly rate. Everything else in the product is deliberately not there.
The chapter is written for both people who meet this:
the builder, who has to put somebody on a job and wants to know what that person will then be able to see;
the worker, who has been sent a link and a password and wants to know what he is looking at.
Everything below was carried out on the running product, in the order it is written.
Putting a worker on the job
A worker's seat does not come from being on your roster. Adding somebody to your roster gives you a name, a trade and a rate for your own planning (Chapter 7). It gives them nothing at all — no login, no screen, no way to know what they are on.
What creates the seat is a per-project invitation, and it is made in one place: the editor's Manage access control, on the project itself.
Manage access
Open the project, open the File menu and press Manage access. The dialog says what it is:
Manage access — "DrawToBid funny home" Grant one role per person on this project.
Invite someone
[email protected]Subcontractor · Customer · Worker
Three roles, one picker, one person at a time.
There is no Foreman here, and that is deliberate. A crew lead is one of your own workers, promoted afterwards on the Crews page — never somebody invited in from outside (Chapter 7). This door grants a role on one project; it does not make anybody a member of your company.
Press Worker and the dialog tells you what that role means:
Views the project, the works assigned to them and their schedule. Read only: progress is recorded for them, never by them.
That sentence is accurate, and it is worth reading twice, because it is the whole of the seat. He looks; he does not touch. The last clause in particular — progress is recorded for them, never by them — is the thing builders most often expect to work the other way round, and it is answered here before you send the invitation rather than after.
Pick Worker and a second control appears underneath, which was not there a moment earlier under the dialog's default role:
Link this invite to a roster worker (optional) — Not linked —
This is the join between the account you are inviting and the person already on your roster. Open it and your roster drops down:
— Not linked — · Al Peterson · Dan Harris · Miguel Santos · Ray Jenkins · Sam Rodriguez
It is not the whole roster. Two of the people on this company's list were not offered at all — both of them people whose account is already tied to their roster entry, and for whom there is therefore nothing left to join up. So a name you know is on your team can be missing from this list, and that is not a fault. If the person you are inviting is one of them, leave the picker at Not linked and send the invite anyway: it landed on the existing seat, correctly, and the invited worker's own screen greeted him by his roster name.
Type the address, press Invite, and they appear in People with access:
[the customer] · [email protected] — Customer · Active — Revoke [the subcontractor] · [email protected] — Subcontractor · Active — Revoke billy-green · [email protected] — Worker · Pending — Revoke
Pending means they have not opened it yet. It changes on its own: after the invited workers had signed in and looked at their screens, the same list read Worker · Active for each of them, with nothing pressed in between.
Note what the grant row does not say: it names the account, not the roster person, and it does not show which roster worker the invite was linked to. If you are inviting several people, keep track of the email addresses.
And then hand them some work
The invitation alone gets them a screen with their name on it and no work under it — see Two empty screens below, because the product has two different ways of saying "nothing here" and this is the milder one. What fills it is the ordinary work of running the job, which this manual has already covered:
assigning a work to them — Chapter 7, on the estimate's Labor tab;
putting days against it — Chapter 10, the planner.
For this walk the handing-over and the days were put in through the product's own assignment and planning doors rather than by re-driving those two chapters' screens, so what is measured here is the effect on the worker's side. That effect is immediate: a work handed over while he was signed out was on his list the next time he looked, without anybody telling him.
What the worker sees
He signs in at the ordinary sign-in page with his own email address and password. He does not choose where to go and he is not asked to pick a company. He lands on the project itself — the building on screen, and a banner across the top:
Worker view — the project and the works assigned to you. Read only: progress is recorded for you, never by you.
That banner is the same sentence the invite dialog gave the builder, said to the other party. The two agree, which is worth knowing because they have not always: whatever the seat can and cannot do, both people are told the same thing about it.
Beside the banner is Calculate in the toolbar, for his cut of the estimate, and the scene column is already filtered to MY WORKS with the count of his own jobs beside it.
The very first time he arrives — the arrival that accepts his invitation — a short dialog meets him on top of the project: the project's name, "You were invited as a worker — the works handed to you and your schedule are here", a line explaining that Calculate opens the estimate, and two buttons: Open the estimate / View the project. Once, and never again. The dialog does not mention money to him — his line reads "the estimate is the list of works — yours are marked" — because there is none on his seat.
Driven cold from a registration, two workers were invited from Manage access to addresses that had no account; each opened the invitation link, registered through the gate's Register, verified, signed in — and landed on the project under the Worker view banner with the dialog on top. Open the estimate opened the one-tab estimate described below with My works already lit; View the project closed the dialog and left the building on screen, the scene tree filtered to My works and saying No element matches this filter — turn off My works to see the whole tree, because nothing had been handed to either man yet. Neither saw the dialog again — not on a reload, not on a second sign-in from a fresh browser.
What is on his estimate
Press Calculate and he gets one tab: LABOR. There is no Total tab on this seat at all — that tab is the money summary, and with the money hidden it drew him a blank page, so it is not offered. What the tab carries is the work list: the name and unit of each job, the quantity, and the hours — the norm per unit and the total. No money column of any kind.
It opens already showing only the works handed to him. The header carries a My works button, lit, with the count of his own jobs beside it; the rest of the project's work list sits behind it, one press away, for when he wants to see where his job sits in the whole build.
His own page still exists. The address is /my-work and the page is called My work — no longer where he lands, but still his: the schedule first, the works under it, and the one money-shaped figure this seat carries. Its header shows his roster name as a badge, his own hourly rate, and his account name in the corner:
⛑ My work · BILLY GREEN · Your rate $18/h — billy-green
Then the page says what it is:
Your works and schedule
The works handed to you, and when you are due on site.
The schedule comes first on the page and the works come under it. That order is worth knowing if you are telling somebody over the phone what to look at: the calendar fills the top of his screen, and the list of what he has been handed sits below it, one block per project, headed with the project's real name and the company running it:
DrawToBid funny home [your company]
The project is named, not numbered. That is worth saying out loud because the other invited seats in this product do not manage it — a subcontractor's landing page shows Project #107 (Chapter 9). A worker gets the name of the house he is working on.
The one person whose landing looks different
A man who is also a company member — a crew lead with a membership, not just a grant — lands in the full company editor, on the company's newest project, rather than on the scoped worker view. That is not a misroute: everyone lands on a project, and a member's project page IS the company editor. But the cut-down My work page is not where he is dropped — if he wants it, he types
/my-workhimself, and he is the one person you have to tell the address to.
Your own rate, once
Your rate $18/h
It is a fact about him, not about the job. It sits in the header beside his name, it is the same figure you agreed with him and the same one your Team page shows you (Chapter 7), and it is the only money-shaped figure anywhere on this seat.
Three different workers were walked on the same job in the same sitting to make sure each man is seeing his own and not a shared number: $18/h, $36/h and $32/h, each on his own screen.
It is never on a work row and it is never multiplied by anything. There is no line anywhere that says what a day, a work or a week is worth to him — see What is deliberately not here, which explains why that absence is deliberate rather than unfinished.
If his roster row carries no rate, nothing appears — the header simply has no such line. It never reads $0/h.
Works handed to you
WORKS HANDED TO YOU 📋 Timber-frame structural wall (timber-frame house) — Your share 30% — planned · 0%
One line per work. Three things on it and no more:
| what it says | what it means |
|---|---|
| the work's name | the catalog name of the job. It is sometimes fuller than the short name on the builder's own estimate row — Interior wall priming there was Interior wall priming (before finishing) here |
| Your share | how much of that work is yours. On a work you are doing alone it reads 100%; where the builder split it between several people, each person's line shows their own portion. Three men on the same work in this walk read 30%, 25% and 15% — each his own portion, and none of them told what the others held. Your portion can be rebalanced by two people — the builder, and your own crew's lead, who may shift shares between his crew's members (what they hold between them never changes under his hands) — until the owner has verified the work, after which it is settled |
| the state and the figure | where the work stands, and how far it has got |
the work's name
what it means
the catalog name of the job. It is sometimes fuller than the short name on the builder's own estimate row — Interior wall priming there was Interior wall priming (before finishing) here
Your share
what it means
how much of that work is yours. On a work you are doing alone it reads 100%; where the builder split it between several people, each person's line shows their own portion. Three men on the same work in this walk read 30%, 25% and 15% — each his own portion, and none of them told what the others held. Your portion can be rebalanced by two people — the builder, and your own crew's lead, who may shift shares between his crew's members (what they hold between them never changes under his hands) — until the owner has verified the work, after which it is settled
the state and the figure
what it means
where the work stands, and how far it has got
The state reads planned until somebody records otherwise, and the figure beside it is the progress on the work. The builder's own screen uses the same word for the same state, so the two sides agree.
There is no money on that line. No rate, no price, no what-the-work-is-worth — the one figure about his pay is in the header and nowhere else. See What is deliberately not here below.
Two empty screens
When a man opens My work and finds nothing on it, the product says one of two different things, and the difference matters to whoever he telephones about it.
The first is the whole page being empty. No name badge, no rate, no project, nothing:
This page shows the work handed to you on projects you have been invited to, and no such project is open to you right now. An assignment on its own does not open a project here — if you have been given work and do not see it, ask the company for an invite to that project.
The second is a project block with no work in it. His own name is in the header, his rate is beside it, the job is named — and under WORKS HANDED TO YOU:
No works have been handed to you on this project yet.
with "Nothing is scheduled for you yet." where the calendar would be.
Read the header to tell them apart, and it is the reliable tell. On the second screen the product knows who he is: it printed MARCO REYES and Your rate $22/h and named DrawToBid funny home · [your company]. On the first it printed neither, because it had resolved nobody.
That is not a cosmetic difference. It is the difference between "we looked and there is none" and "we never got as far as looking." The second screen has read the job's records and found no work of his on it — so "none" is a measured answer and the person to ask is whoever hands out the work. The first screen has not read any job at all, because no job is open to him; it cannot know whether he has been given work, and it deliberately does not guess. What he is missing there is the invitation, not the work — which is exactly what the sentence tells him to ask for.
And the first screen is the same words for several quite different people. It was read on three accounts in one sitting, before any invitation existed, and all three got the sentence above character for character:
a crew's own lead who had genuinely been given a quarter of a real work on the job, with dates against it;
a man on the roster holding nothing anywhere;
a customer, who is not a worker at all.
The first of those is the one to understand before you answer a telephone call about it. He had been put on the job and the screen still would not show it, because being assigned to a work and being invited to a project are two different acts and only the second opens this page. The same man, after the invitation was made in Manage access and nothing else was changed, read his work immediately: FRANK ADAMS, Your rate $36/h, Timber-frame structural wall (timber-frame house) — Your share 25% — planned · 0%, and a week of 8h blocks on his calendar. The invitation was the only thing that moved.
If a worker tells you his page is empty, ask him whether his own name is in the corner. With his name there, he is on the job and simply holds no work on it — hand him some. Without it, he has not been invited to the project, whatever else has been done for him.
The schedule
YOUR SCHEDULE ‹ · Today · › · August 2026 — Day · Week · Month
This is the same calendar the general contractor plans with (Chapter 10), not a second one made to look like it. It was put beside the general contractor's own Planning page in the same sitting to be sure: the same arrows, the same Today button, the same read-out beside them answering by the same rule, and the same grid underneath. What differs is what each man may do with it, and how many views he gets:
| the general contractor's Planning page | the worker's seat | |
|---|---|---|
| views offered | Timeline · Week · Day · Month · List | Day · Week · Month |
| whose days are drawn | everyone's, with a person picker and a project picker | his own, and there is no picker |
| what pressing it does | sets and moves schedules — Chapter 10 | nothing — it is read to, not written on |
views offered
the general contractor's Planning page
Timeline · Week · Day · Month · List
the worker's seat
Day · Week · Month
whose days are drawn
the general contractor's Planning page
everyone's, with a person picker and a project picker
the worker's seat
his own, and there is no picker
what pressing it does
the general contractor's Planning page
sets and moves schedules — Chapter 10
the worker's seat
nothing — it is read to, not written on
The grid is headed with one lane, carrying his own name, and every block on it is one of his days. A block says the work and the hours and nothing else:
Timber-frame structural wall (timber-frame house) · 8h
Under the calendar there is one line of explanation, and it is the only one:
The accent line marks the current time (now).
Week is the view it opens on, and it is the one that answers "where do I have to be this week?" — seven columns headed with real dates, the hours down the left, and each of his days drawn as a bar in its own slot at the hour it starts. When the week on screen is the current one, today's column is shaded and a coloured line crosses it at the current time. On the walk this week carried four bars — three whole days of 8h and one of 1.8h.
Month gives him the whole month at once, dates in every cell, today shaded, and every one of his days as a bar. On the walk this showed nine days at a glance, which is the view to tell a man to open if he wants to know what he is in for.
It does not open on today. It opens on a week that has his days on it: driven on 4 September, the calendar came up on August 2026, the month his work actually falls in, while today's own week was empty. That is what the Today button is for: press it and the calendar jumps to the current period, with today's column shaded and the accent line at the current time. On this job that week had nothing on it, which is itself an honest answer.
The arrows move one period at a time in whichever view he is in — a week at a time in Week, a month at a time in Month, a day at a time in Day — and the bars change with them.
The read-out beside the arrows names the period you are looking at, and it names exactly as much of it as is true. In Day it prints the whole day and changes on every press: driven from August 6, 2026, one press of › read August 7, 2026. In Week and Month it prints the month and the year and no more — because a week spans seven days and often two months, so naming one of them would be false of what is drawn. So in Week view the line can stay word-for-word the same while you move between weeks of one month; there, read the dates off the grid rather than off that line. In Month view it moves with each press, from September 2026 to October 2026.
Nothing on it can be pressed to any effect. A block was pressed and an empty slot was pressed: no dialog opened either time, and the calendar was character-for-character the same afterwards. There is no drag, no click-to-create, no way for him to move a day or say he cannot make it.
Day — one day at a time, and it says which day
Day is the third view, and it is the one that answers "what am I doing on that day?". The calendar narrows to one column, headed with the date — Thu, Aug 6 — and the read-out beside the arrows names the whole day, August 6, 2026. Between them, nothing on the screen is ambiguous about which day is drawn: the head gives the weekday and date, the read-out gives the year with it. His name is not on the grid in this view. It is in the header where it always is (BILLY GREEN), and on Week it still heads his lane; in Day the date takes that place.
Down the left are the hours — 7:00 AM to 7:00 PM on the walk — and his day is drawn as a bar starting at the hour it starts, carrying the same wording it carries everywhere else on his seat:
Timber-frame structural wall (timber-frame house) · 1.8h
It does not open on today either. Exactly like Week, it opens on a day that has his work on it. Today brings him back: pressed in Day view it lands on the current day, with the whole column shaded and the accent line drawn across it at the current time.
The arrows move one day at a time, and both the head and the read-out move with them. Pressed forward from August 6, 2026 the screen read August 7, 2026; pressed back it returned. That is the difference a man can see without counting: in Day view the line beside the arrows changes on every press, which is not true of it in Week.
A day with nothing on it simply looks empty. No bar, no message, no shading — an hour grid and the date at the top. Day says nothing about whether he is free or merely not booked, so a man checking whether he is wanted on Friday should read the emptiness as nothing is scheduled for you on this day, and no more than that.
And it cannot be pressed to any effect, like the rest of the calendar. A bar was pressed and an empty slot was pressed in Day view: no dialog opened either time and the screen was identical afterwards, frame for frame.
It is the same view the general contractor plans in, and the two now read alike. Driven minutes apart on the same stack, the general contractor's own Planning page in Day view heads its column with the date (Fri, Sep 4) and names the whole day beside its arrows (September 4, 2026) — the identical shape, down to the wording. The two pages answer what period am I looking at by one rule, so a builder telling a man over the telephone which day to look at is describing the same line on both screens.
A work with no days at all
Then there is no calendar. The whole schedule section is replaced by a single line:
Nothing is scheduled for you yet.
No arrows, no Today, no Day/Week/Month — the switcher is not there to press. The work itself still appears below in Works handed to you exactly as any other, with its share and its state. That is the ordinary state of a job handed out but not yet slotted into a week, and the third worker in this walk showed exactly it: one work at 15%, and nothing scheduled.
A worker who is in a crew
Being in a crew changes nothing about what he sees, and that is worth knowing before you build one. This section was driven with two ordinary members of the same crew — men who are in it but do not lead it — on one job, on the same works, in one sitting.
His crew is invisible from inside it. The crew's name is on no screen he has: not on the tree header, not on the estimate, not on his own page. His crew mates are on none of them either. He is told what he holds and nothing about who holds the rest.
The tree header says SCENE, like everybody else's. A crew's FOREMAN gets his binding printed there instead — FOREMAN · Sitework Crew — and that is the one visible difference between the two seats. An ordinary member gets the panel's own name.
What being in a crew does change is who may move his share. The builder can, and so can his crew's foreman, inside what the crew holds between them (Chapter 7). Neither of those doors is on the member's own screen: counted over the whole of it, there is no Progress / Work distribution switch, no share box and no Split evenly — and asked of the server directly with his own login, rebalancing his crew came back refused: "You are not a member of this company."
The estimate a crew member gets
One tab — LABOR — and it opens filtered to him, with MY WORKS lit and the count of his own jobs beside it. Five columns: the row number, the work's name and unit, the quantity, the norm hours per unit and the total hours.
No money column of any kind. Every text and every input value on that screen was collected and searched for a currency mark; nothing came back. The one money-shaped figure on the whole seat is his own hourly rate, on his own page — see Your own rate, once.
His list is flat. Your own estimate groups every work under a phase heading; his does not. That is worth knowing if you are reading a work's position to him over the phone.
MY WORKS is one switch mounted twice — once over the tree and once over the estimate — and pressing either one changes both.
Other people on the same work
On the worker's own screens, nothing. Not a name, not a share, not a percentage. Two members of one crew on the same four works were walked minutes apart: the first read Your share 20% and $30/h, the second Your share 10% and $55/h, and neither page carried a single thing belonging to the other.
The crew's foreman — the same seat, and his own rate
A crew's foreman is a worker too. He leads the men on the job and he may move shares inside what his crew holds — but on his own page he is the same person as everybody else on the roster, and DrawToBid treats him that way. Miguel Santos, the foreman of Sitework Crew, opens the same My work page as the men he leads.
MIGUEL SANTOS · Your rate $28/h
His own rate is there, once, beside his name — the same line, in the same place, in the same words a worker gets. It is the whole answer to what am I paid: he is not sent to ask anybody.
And it is the only money on his page. The whole document was collected and searched, not glanced at: Your rate $28/h is the single money-shaped string on it. His works read Your share 30% · planned · 0% and carry no rate, no price and no what-it-is-worth; his schedule carries none either. Nothing multiplies his rate by anything, on his screen or anywhere he can reach.
He is told nothing about anyone else's pay. His page was searched for every other man on the company roster — by name, and by each man's own hourly figure — and not one of them appears. That includes his own crew: Dan Harris and Ray Jenkins are on the same four works under him, and neither their names nor their rates are anywhere on his screen.
Three seats on one job, in one sitting, to show it is each man's own figure and not a shared one:
| the man | his seat | his share of each work | the figure on his page |
|---|---|---|---|
| Miguel Santos — leads Sitework Crew | foreman | 30% | Your rate $28/h |
| Dan Harris — in the crew | worker | 20% | Your rate $30/h |
| Ray Jenkins — in the crew | worker | 10% | Your rate $55/h |
Miguel Santos — leads Sitework Crew
his seat
foreman
his share of each work
30%
the figure on his page
Your rate $28/h
Dan Harris — in the crew
his seat
worker
his share of each work
20%
the figure on his page
Your rate $30/h
Ray Jenkins — in the crew
his seat
worker
his share of each work
10%
the figure on his page
Your rate $55/h
Each page carried exactly one money figure, and it was his own. A man in the crew can be paid more than the man leading it — Ray is on $55/h under a foreman on $28/h — and neither of them can see the other's number. That is the point of putting the figure on the man rather than on the work.
The two seats are otherwise the same screen. Counted element by element, the foreman's page and the crew member's page expose the same parts in the same order — the name and rate line, the schedule, the project, the works handed to him — and the same single thing to press: the account button in the corner. The foreman's page carries no extra control.
He cannot close a work from this page either. The seat's own limitation — described above for the worker — applies to him unchanged: there is nothing on
My workfor taking a work up, reporting progress, marking it done or handing it over. Whatever a foreman may close, he does not close it here. Where that control lives was not driven in this walk, so this manual does not yet say.
Do not read "a foreman sees no money" as covering this page. That sentence is about the estimate — the tab set a foreman gets inside a project, which carries no rates and no prices. His personal page is a different surface and it deliberately carries one figure: his own.
The bell
He does not have to be told. A work handed to him puts a line on his notification bell within the minute, and the count beside it goes up:
You were assigned a work — DrawToBid funny home · 1 work · 9m ago — View works
View works opens the job with his own filter already on. Four such lines were on the bell of a man who had been given four works, each naming the project and the number of works in it.
What is deliberately not here
This is the part of the chapter a builder should read twice, because the absences are not oversights. They are the design.
No drawing, no editor, no 3D. A worker never opens the model. There is no File menu, no Save, no Share, no Constructor, no Geometry, no Material tab and no scene. Counted on the running seat, his whole page carries seven controls and no others: the account button in the corner, and the calendar's ‹ · Today · › · Day · Week · Month. Not one of them changes anything about the work — see What a worker can change.
One money-shaped figure, and it is his own rate. Your rate $18/h, in the header, once. Every $ on the whole page was collected on three different workers' seats and each time the list came back with exactly that one entry — his own rate, and nothing else.
Everything else about money is still absent, and that is the design. Not the job's total, not the client's price, not the work's value, not your markup, not what anybody else is paid — while, on the same job in the same session, the owner's own estimate carries its COST and CLIENT PRICE as usual.
And nothing is multiplied by his rate anywhere. No day is priced, no work is priced, there is no running total and no earned so far. That is deliberate and it is worth understanding rather than treating as a gap: the hours on his calendar are the estimate's planned hours, and his share of a work is a percentage — so a rate multiplied by them would print a sum the product never computed and that he is not paid by. The rate on its own is true. The multiplication would be a claim about his pay that nothing behind the screen supports. If a worker asks you "so what does that come to?", the answer is not on this seat and is not meant to be.
No materials at all. No list, no quantities, no supplier, no purchases, no allowances. The word does not appear on the page.
No other people's work. He sees his own works. He does not see who else is on the job, what they are on, or how far along they are.
That last one is the point of the seat, and it was tested rather than assumed. Three workers were put on one project, on the same work, from one seat in one sitting — the hardest case, since anything leaking between them would show up as the same screen three times:
Billy Green — share 30%, his calendar headed Billy Green, four days that week, nine in the month, rate $18/h.
Frank Adams — share 25%, his calendar headed Frank Adams, two days that week, seven in the month, rate $36/h.
Jake Thompson — share 15%, no days at all, and "Nothing is scheduled for you yet.", rate $32/h.
Same job, same work, same moment, three different pages. Not one of them named another, showed another's share, another's days or another's rate.
What a worker can change
Nothing.
His page has seven things to press and not one of them changes the work. Six are the calendar's, and they only change what he is looking at: ‹ and › move the period, Today returns him to the present — the current week, or the current day when he is in Day view — and Day / Week / Month change the view. Pressing the calendar itself — a block, or an empty slot — does nothing at all; no dialog opens and the screen does not move.
The seventh is the account button in the corner, and behind it a short menu:
billy-green · [email protected] GO TO — Editor · Create a company SHARED WITH YOU — [your company] — WORKER Account settings · Log out
The Shared with you entry is the badge for the job they are on. The two under Go to lead nowhere near it — see Addresses they may type.
The second entry has two wordings. It reads Create a company for somebody who owns none, and Company dashboard for somebody who already owns one. Neither leads to your job.
There is no control anywhere on the seat for taking a work up, reporting how far it has got, marking it done, handing it over for review, flagging a problem, or saying he was not on site. He reads his works and his days; that is the whole of it.
The invite dialog and the seat now say the same thing
When you pick Worker in Manage access, the product tells you the person "views the project, the works assigned to them and their schedule. Read only: progress is recorded for them, never by them." The banner over his own screen says it back to him in the same words.
Both halves are true of the seat as built. He does view the project — the building, and the works handed to him on it, filtered to his own. And he cannot mark anything done: there is no control on his screen that moves a work, and the door behind such a control refuses his account outright.
So plan on it: do not invite somebody expecting progress to start coming back from them, and do not tell them to "tick it off when it's done". Recording progress is yours to do, on the estimate, exactly as Chapter 7 describes — and now both of you are told so before the invitation is sent, rather than finding out afterwards.
Addresses they may type
A worker who types an address they were told about, or follows a link from an email, does not break anything. Here is where each road actually ends, driven one at a time.
The project's own address — the drawing they are working from. They do not get it. The editor opens on an empty, untitled project of their own rather than the job, and the job's own data is refused to that account at every door: the project, its assignments, its work orders, the company's rate card and the estimate settings all answer forbidden, while answering the owner normally in the same minute. That is the product working, not failing. Driven with a freshly invited worker: the job's address was typed, the editor came up headed Untitled project with one element in the scene, and the house they are working on was not on it.
The company's address — your Team page, your Planning board. The worker does not get those either.
The account page works normally: display name, email, password. It is their account, not your job.
The Editor and Company dashboard entries in their own menu lead away from your job, not into it.
Taking the access back
Revoke, on the person's row in People with access. It asks first:
Remove billy-green's access? — Confirm · Cancel
Confirm, and the row is gone from People with access at once.
This was walked on a man who was using the product at the time — a roster worker holding a real 30% share of a work with days against it, signed in, with the project open in front of him. Here is what each of his screens became.
His own page, /my-work, is the same page with everything gone — no roster badge, no rate, no schedule, no works — carrying the page-level sentence quoted in Two empty screens:
This page shows the work handed to you on projects you have been invited to, and no such project is open to you right now. An assignment on its own does not open a project here — if you have been given work and do not see it, ask the company for an invite to that project.
Nothing is hidden behind an error, and he is not locked out. He can still sign in. It is worded as a state, not as a refusal, which is the honest thing for it to say — nobody has denied him anything, and the work he still holds on your roster is simply not this page's business. The same words come up on an account that was never invited at all, so what he reads is the page's ordinary empty state rather than a message about having been removed.
The job's own address, typed or followed from an old link, drops him into his own empty editor with a notice on top:
That link didn't open You don't have access to that project. This is your own editor. Close
Behind that notice is Untitled project, 0 elements — his, not yours. Press Close and the notice goes; the house he was working on is not there and never appears.
Signing in again from a fresh browser does not put him on the project and does not put him on My work. It lands on the company's Shared projects page — headed with the company's name and, still, the badge WORKER — with no project row and one sentence:
Your access to this company's projects has been removed — ask [your company] to share one again.
Honest, and in the right place.
Who else can open this page
Nobody without an account. Typing the address while signed out gives a flat 404 — This page could not be found, not a sign-in prompt. The seat does not announce itself to strangers.
A person with no company and no invitation never meets this page. An account registered through the product's own form, verified and signed in for the first time, lands on its own empty editor — Untitled project, 0 elements. Nothing routes them here; they would have to type the address.
Anybody signed in can open it, and sees nothing. The page is a projection of what the server resolves for the account asking, so an account that resolves no worker's seat gets the empty state — no error, no refusal, and nothing of anybody else's on it.
Where this chapter stops
This chapter still cannot watch a figure on a worker's row move, and the walk settled why rather than closing it — on his side. The question was put to the seat twice over, from the screen and from the door behind it, on a crew member holding a fifth of a real work:
on the screen — his estimate carries no progress control at all. Counted over the whole of it: not a rung, not a slider, not a submit. There is nothing to press;
at the door — asked directly with his own login to record his own share as taken up, and then to hand part of it over for review, the answer both times was: "You are not a member of this company."
The same sentence answered the two things he should be refused — verifying his own work, and moving a crew mate's figure — so on those two the product is doing exactly what the design says.
So the chapter stops here, and the reason is measured rather than guessed. A worker's figures are not his to move; recording progress is the builder's, on the estimate, as Chapter 7 describes — and the control for it is on the builder's holder lines, as the box below records. What is not answered here is what the man's own row looks like once somebody else has moved it.
The builder's own screen carries the control, and that is where the figure moves from. Read line by line with the tab narrowed to one person, every holder line on the builder's estimate carries a
Take upslider beside the share, the hours, the Unassign and the dates, and the work row above them carries a Progress / Work distribution switch:Jake Thompson (carpenter) · 65.6 h · 15% of this work — Unassign — Not started — Assigned · Not scheduled — Take up ▬▬●
So the figure is the builder's to move, and Chapter 7 walks that press. This chapter's own subject is the other seat, and on it the answer was measured twice: the worker's screen carries no progress control, and the door behind it refuses the account in words.
All three views — Day, Week and Month — are described in full in Your schedule.
What to remember
The roster is not a seat. Being on your team list gives a person nothing to look at. Manage access → Worker on the project is what gives them a screen.
The link to a roster worker is what makes it his work. Somebody already linked will not appear in the picker — that is not a fault.
A worker's whole product is a calendar and a list: the days he is due, drawn in the same calendar you plan with, and the works handed to him with his share and where each stands. No materials, no drawing, nobody else's work.
He sees his own hourly rate, once, in the header — and no other money at all. Nothing on that seat is multiplied by it, deliberately: his hours are planned hours and his share is a percentage, so any such total would be a number the product never worked out.
All three views carry their dates. Tell him Week for where do I have to be this week, Month for the whole run of his days at a glance, and Day for one day on its own — Day heads its column with the date and names the day beside the arrows, so it can be read without counting columns. The general contractor's own page answers by the same rule, so both of you are reading the same line.
He cannot change anything, and the product now says so on both sides — in the invite dialog the builder reads, and in the banner over the worker's own screen. The calendar is read to, not written on. Progress is recorded by you.
A crew changes nothing he can see. His crew's name and his crew mates are on none of his screens; what the crew adds is a second person — his foreman — who may move his share.
The bell is how he learns. A work handed to him puts a line on it within the minute.
Refusals on his seat are the product working. He is meant to be unable to reach the job, the estimate and the roster.
There are TWO empty screens and they mean different things. His name in the corner means he is on the job and holds no work on it; no name in the corner means he has not been invited to the project at all, however much work has been assigned to him.
Revoking access empties his page rather than locking him out, in the same words a worker who was never invited sees. The job's own address answers "That link didn't open… This is your own editor", and a fresh sign-in lands him on Shared projects with the sentence saying his access was removed.