Chapter 9
Work as a subcontractor
Every chapter so far has been written from the general contractor's chair. This one turns the table around. Another builder has invited your company onto their project, and this chapter is about what that is like from your side: what arrives, what you can see of a job that is not yours, what you are allowed to change, and what you owe back.
The first thing to understand is that you now have two seats, and they are not the same place:
Your own company — the ordinary administrative shell from Chapter 2, where you are the owner and everything works exactly as it does for anybody else. Your roster, your crews, your catalog, your settings.
The project you were let into — somebody else's job, opened in a scoped workspace of its own, where you can see your part of the work and nothing else about how that company is run.
Almost every confusion on these screens comes from mixing those two up. The chapter is written in the order you meet them.
Everything below was carried out on the running product, in the order it is written.
The invitation arrives
Chapter 7 ended with a general contractor sending an invitation to a roofing company. Here is where it lands.
How the invitation is sent
It starts on the general contractor's side, in the Manage access dialog on his own editor (Chapter 22 is the whole of that door). He types your email address, picks a role, and presses Invite:
Manage access — "DrawToBid editor scene" — Grant one role per person on this project.
Invite someone — [ your address ] — Subcontractor · Customer · Worker Edits the estimate for their works and the general contractor's works, and attaches workers. No canvas editing. This applies to this project only — invite them again on another project. — Invite
The dialog above names a different job from the one the rest of this chapter is written from, and that is the point of the sentence at the foot of it: a grant is per project. The company in these pages was let onto DrawToBid funny home by exactly this road, some time earlier; what you are watching here is the same road being walked again for a second job.
Two things in that dialog decide what the rest of this chapter is like. The sentence under the role says what a subcontractor is here — edits the estimate for their works … no canvas editing — and the one under it says the grant is for one project only. Being somebody's subcontractor on one job gives you nothing on the next.
Your address then appears in the dialog's People with access list, as Subcontractor · Pending, with Revoke beside it. It stays pending until you first open the project.
Where it lands
When you sign in for the first time, you do not land in your own company — and, unlike the customer and the worker, you do not land on the project either. You land on a page belonging to the company that invited you, headed with their name and a badge saying what you are to them:
[the contractor] · SUBCONTRACTOR
Shared projects — Projects [the contractor] has shared with you. Open one to view it in your scoped workspace.
and one row per project, with an Open link.
That page is deliberately bare. It shows you the projects bound to your invitation and nothing at all about the company that sent it — no people, no rates, no catalog, no other projects. Searched control by control, the only two things on it are the account button in the header and the project row itself.
Once you have been on the project once, you stop seeing this page. A subcontractor whose invitation has already been used signs in and goes straight to the project, and so does the same account from a fresh browser. It is the first sign-in that stops here.
The row prints the project's real name — DrawToBid funny home — so two invitations give you two rows you can tell apart.
Where the invitation lives
The invitation as a document is somewhere else — in your own company, under Projects › Invitations (the address is /company/invitations):
Invitations — Projects other companies invited you to work on. Accept a pending invite to open the project; past invitations stay here for your records.
Pending — Awaiting your response. DrawToBid editor scene · by [the contractor] · Subcontractor · Sep 6, 2026 ● Pending — Accept & open · Decline
Note what this page gives you that the landing page does not: the project's real name, who sent it, what role you are being offered, and the date.
A pending invitation offers exactly two controls, Accept & open and Decline, and nothing else. There is nothing to open, nothing to price and no list of works to inspect before you decide.
The page has two halves and keeps everything. Under Pending — Awaiting your response — sit the invitations you have not answered; with none outstanding it reads No pending invitations — you're all caught up. Under History — Invitations you've responded to, or that were withdrawn — every past one stays, each naming the project, the company that sent it, your role, the date and what became of it, with Open project ↗ on the ones you took.
Before you press anything
Opening the project is accepting it
This is the single most important thing in the chapter, and it is easy to walk into.
The Open link on that shared-projects landing page — the one that says nothing about an invitation at all — accepts the invitation the moment you press it. You do not have to visit the Invitations page, and you are not asked to confirm.
This was carried out deliberately, one step at a time. Before pressing anything, the Invitations page read Pending, with Accept & open and Decline both offered. Then Open was pressed on the landing page — and only that. Returning to the Invitations page, it read:
Pending — No pending invitations — you're all caught up.
History — Invitations you've responded to, or that were withdrawn. DrawToBid funny home · by [the contractor] · Subcontractor · Sep 6, 2026 ● Accepted — Open project ↗
The invitation had moved to the history list as Accepted, and Decline was gone.
This is how DrawToBid is meant to work — accepting is defined as opening the project, and nothing less. But the consequence is worth stating plainly: there is no way to look first. If you want to turn a job down, decline it from the Invitations page before you open it. Once you have opened it, you have taken it on.
This road needs a company of your own. An account with no company has no Invitations page at all — it meets the card the next section but one describes instead — so declining before you look is something only a company can do.
Your first arrival
Whichever way you reach it — Open on the list, or the project's link once your first sign-in is behind you — the very first time the project opens for you, a short dialog meets you on top of it:
DrawToBid funny home
You were invited as the subcontractor — set your quote and staff your own works.
The estimate is the works and the money; the project is the building itself. Calculate, top right, opens the estimate any time.
Open the estimate · View the project
Open the estimate opens the estimate at once; View the project closes the dialog and leaves you on the building. It shows once: a reload did not bring it back, and neither did signing in again from a fresh browser — that sign-in went straight to the project with no dialog.
Without a company of your own
The seat described in the rest of this chapter belongs to a COMPANY that was invited. If you were invited personally and have no company yet, you do not get a cut-down version of it — you get one card, and it tells you what is missing:
This seat needs a company
DrawToBid funny home
You were invited to price and staff your own works on this project. On DrawToBid that work belongs to your own company, and a company starts with a subscription.
Set one up and this project opens here on your seat. Your invitation stays as it is.
Set up your company
The project is named on it — you followed a link and are entitled to know which job this is about — but there is no canvas, no scene tree and no status strip behind it. Nothing of the building is shown, and that is the point rather than a fault: a subcontractor on DrawToBid is a company, because the company is the thing that quotes, is staffed and is paid. There is nothing coherent for a person without one to do on this seat, so the product says so instead of showing you an empty room.
Your invitation is not spent by meeting this card. It stays exactly as it was — the general contractor's access list still shows you, and the same address opens the project the moment you have a company.
The card's one control, Set up your company, takes you to your account page, at the panel that starts the road Chapter 2 describes:
Create your company — A company is where your projects live. It runs on a subscription, so that comes first — you only need a payment method, nothing about the company itself. Once it is active, you create the company on the next screen. — Subscribe
The other two addresses you might try both put you somewhere sensible, and neither leaks anything. Asking for the general contractor's own address for the project lands you in your own empty editor under "That link didn't open — You don't have access to that project. This is your own editor."; asking for the inviting company's Team page puts you back on the shared-projects list. Nothing of theirs is exposed either way.
What accepting actually does
Accepting turns the invitation into a subcontract — a live record of you on that project, which both sides can now see. Immediately after accepting, and before anyone has given you any work, the contract exists but is empty: no price, no scope.
That matters because the general contractor's side of the same record now shows your company on his estimate's Subcontractors tab, with a state, a price and every work he has put in your scope. A freshly accepted company reads NOT AGREED $0 with nothing under it; the one used for this chapter, holding real work, read PLANNED · 0% over a list of ten work lines.
Your own company
Open your company — the ordinary way, from your account — and nothing about being somebody's subcontractor has changed it. The rail carries the same twelve entries any owner gets, in the same four groups, none of them greyed:
| group | entries |
|---|---|
| PEOPLE | Team · Crews · Join requests |
| CATALOG | Rates & Works · Materials |
| PROJECTS | All projects · Planning · Subcontractors · Access requests · Invitations |
| SETTINGS | Company profile · Estimate / Markup |
PEOPLE
entries
Team · Crews · Join requests
CATALOG
entries
Rates & Works · Materials
PROJECTS
entries
All projects · Planning · Subcontractors · Access requests · Invitations
SETTINGS
entries
Company profile · Estimate / Markup
and the header above it reads your company's name with Your role: owner under it.
You have your own Team page with Invite worker and Add worker, your own Crews, your own Rates & Works and Materials, your own All projects and Planning, your own settings. Note what is in that list: Subcontractors and Access requests are yours too — being somebody's subcontractor does not stop you hiring your own.
None of it is shared with the company that invited you, and none of theirs is visible to you.
Typing their address does not get you in. Asking for the inviting company's own Team page does not produce a refusal card — it quietly puts you back on your own company's Team page instead. Nothing of theirs is exposed; you simply end up at home.
The workspace you are let into
Open the project — from the list, or by signing in once your first arrival is behind you — and it opens in a scoped editor with a banner across the top saying exactly what the seat is for:
Subcontractor access — set your quote and staff your own crew. Canvas editing is off.
Read that sentence carefully, because it is an accurate summary of the whole seat. You get two powers — price the work and staff it — and the drawing is not one of them.
The building and the tree
The building is all there — the status strip at the foot of the screen counts 454 elements on the job this chapter was written from. You can look at it in 2D and 3D, move the camera, expand the scene tree, and open the assistant. What you cannot do is change the geometry: the elements you have been given are marked as belonging to you and are locked against editing.
The scene tree is the full one and it keeps its own controls — a search box, the master eye, HIDDEN, expand and collapse, the BUILDER filter and PROGRESS with its ALL and TO DO buckets. Chapter 19 is about all of them; nothing on this seat is cut down.
What the header carries
Along the top you also get a message control and a notification bell, so the general contractor can reach you and you can reach them about this project — and, at the very left of the header, a My projects link back out of their job to your own.
What is not in that header is everything that writes to the drawing: no File menu, no Save, no Share, no undo or redo, no tool rail down the left. The banner said canvas editing is off, and the header is the proof of it.
Calculate, top right, is what this chapter is mostly about.
The estimate, scoped to you
Press Calculate and you get the cost estimate — and this is where most people expect a cut-down screen and do not get one. You get seven tabs, in this order:
TOTAL · PROGRESS BILLING · BY PARTY · LABOR · DETAILS · MATERIALS · EQUIPMENT
What changes is not mostly the tabs, it is whose numbers are in them. Every one of them is headed:
Cost estimate · Your works on DrawToBid funny home
Acting as [your company] · your works on DrawToBid funny home
The one tab you do not get
The general contractor's strip has an eighth, Subcontractors, and yours does not. Driven side by side on the same project the same day: his estimate offers it, yours does not have it at all — not greyed, not empty, absent.
That is deliberate and it is not a slight. That tab is where a company reads the work it has handed to its own subcontractors — their prices, their states, their progress. On this project you are the subcontractor, not the company holding one, so there is nothing for it to show. The tab is tied to the seat, not to the account: what decides it is whether you are the subcontractor on this job.
What you do not see
You do not see the general contractor's price to their customer. Searched term by term across the Total and Labor tabs, the words client price appear nowhere on this seat. Nor do you see their other trades, their people, their markup, or what they are charging for the work you are doing.
An empty package
A company that has just accepted sees a complete but empty estimate, and each tab says so in its own words. The Labor tab is the one that explains it best:
No works are delegated to you on this project yet. When the general contractor delegates work, it appears here with your costs.
The Total tab reads zero across its three figures, Details says No work rows, Materials says No materials in this estimate, and Equipment says No equipment in this estimate. Nothing is broken; you simply have not been given anything yet.
Once you hold a package
A company holding real work sees the same tabs filled with its own figures. The Total tab of the company used for this chapter reads:
COST $4,551.81 · SUBCONTRACTOR PRICE $6,196.54 · MARGIN 26.54%
Payment workers $3,289.45 · Hours 114.75 · Equipment (net) $1,262.36 Overhead, tax & markup (36.1%) +$1,644.73
Those are your costs and your margin on your slice of the job — built from your rates, not the general contractor's. The three headings are worth reading carefully: the general contractor's Total tab says COST, CLIENT PRICE and MARGIN; yours says COST, SUBCONTRACTOR PRICE and MARGIN. Same shape, different party.
Between the headline figures and the breakdown there is one row that is not a figure at all:
Building area [ Not set ] ft² · suggested 2,568.99 ft² · USE · ⓘ
It is the floor area the estimate uses for its per-square-foot readings. DrawToBid measures a suggestion off the building itself and offers USE to adopt it; you can type your own instead. It is yours to set on your own slice — nothing about it is inherited from the general contractor.
The Labor tab
The Labor tab lists the works you were given. Above the table are four sets of controls, and the first of them is why this tab is not the general contractor's:
| control | what it does |
|---|---|
| JOINED · DETAILED | one row per work, or every material and machine under it |
| SCOPE | already set to My works, and there is nothing else in it for you |
| FILTER | All categories · Any assignee · All — narrow the list three ways |
| PIVOT | By work, or By worker — the same figures grouped the other way round |
JOINED · DETAILED
what it does
one row per work, or every material and machine under it
SCOPE
what it does
already set to My works, and there is nothing else in it for you
FILTER
what it does
All categories · Any assignee · All — narrow the list three ways
PIVOT
what it does
By work, or By worker — the same figures grouped the other way round
Under them the table carries the same columns Chapter 7 described — visible along the top of the ringed table above:
NAME, UNIT OF MEASURE · QUANTITY · HOURS · PAYMENT · COVERAGE · BASIS · ASSIGNEE
and, on the job this chapter was written from, one category holding three works:
Foundations (3) · 114.75 · $3,289.45 · ● 3 planned Reinforced concrete foundation slab (1 CY) ×2 · 75.042 · 114.75 · $3,289.45 ·
selfsuboffExcavation and subgrade preparation (1 CY) ×2 · 75.042 · 0 · $0 ·selfsuboff· — Concrete pumping service (1 CY) Machinery work ×2 · 75.042 · 0 · $0 ·selfsuboff
The Basis controls are visible and every one of them is dead. The three little switches on each row — self, sub, off — are how the general contractor decides who carries a work and whether it is billed. All three segments are disabled on this seat, and the control's own hover text names the owner as the only party who may change it.
You can see the setting; you cannot change it. That decision belongs to whoever hired you.
The other five tabs
The Total and Labor tabs are where the work is. The rest are readings, and each is scoped to you the same way.
By party
BY PARTY answers who is carrying what, and it is where the money is grouped by responsibility rather than by work:
BY RESPONSIBILITY PARTY BILLABLE COST BASE (COMPANY + SUBCONTRACTORS) $4,551.81 — Markup and tax are added on the Total tab. Company $4,551.81 — Labor $3,289.45 · 5 of 5 materials not priced yet · 100% · Price them → · Equipment $1,262.36 Customer-supplied — NOT BILLED $0
Two things on it are worth knowing. Price them → is a live link straight to the Materials tab for the lines that still carry no price — the same road Chapter 11 describes, from the seat that has to walk it. And Customer-supplied · NOT BILLED is the line that says what the customer is providing themselves: it counts in the build and not in your bill.
Details
DETAILS is the Labor tab opened out. It carries its own JOINED · DETAILED pair and a + MATERIALS & EQUIPMENT switch, and its columns are per-unit rather than per-work:
№ · NAME, UNIT OF MEASURE · QUANTITY · COSTS PER UNIT · COSTS TOTAL
Materials
MATERIALS is your own material budget on your own slice, and it opens with the thing you most need to know about it:
MATERIAL BUDGET — Nothing bought yet · TOTAL BUDGET $0 · UNPRICED 5 of 5 lines · 100%
№ · NAME, UNIT OF MEASURE · QUANTITY · PRICE · NET · PURCHASED Concrete (1) · Formwork (1) · Reinforcement accessories (1) · Reinforcement steel (1) · Wire (1) TOTAL $0
DrawToBid ships no material prices — the catalog carries norms, and every price on a job is one somebody entered (Chapter 11). So a fresh package reads 5 of 5 lines unpriced and a budget of $0, and filling that in is yours to do. It is your own budget on your own works; the general contractor's material prices are not in it and yours are not in his.
Equipment
EQUIPMENT is the same idea for machines, and it is the one tab that carries tax columns:
№ · NAME, UNIT OF MEASURE · QUANTITY · RATE · NET · VAT % · VAT · GROSS Equipment (1) $1,262.36 — TOTAL $1,262.36 · $0 · $1,262.36
Progress billing
PROGRESS BILLING is the tab that changes most, because it depends on something outside itself. Before the general contractor has agreed your price it will not let you start, and it says exactly why:
No applications yet This subcontract is not agreed yet, so there is nothing here to bill against. Put your sum forward and have the general contractor approve it.
Once it is agreed the same tab opens for business, naming the contract to bill against:
BILL YOUR CONTRACT — [your company] No applications yet — Pick a contract above to bill the work you have completed.
Composing an application from there, and what the general contractor does with it, is Chapter 8's road walked from this side; this chapter reaches the door and stops at it.
Setting your quote
This is the first of the two powers the banner promised, and it lives at the bottom of the Total tab:
Subcontractor price $ [ 6,196.54 ]
GENERAL CONTRACTOR APPROVAL — Set the price you charge the general contractor. DRAFT $6,196.54 Request approval · History
DrawToBid has already computed a price from your own costs and margin, and it sits in Draft until you do something with it. You can type your own figure over it — the price you actually want to charge — and the draft is yours to change for as long as it stays a draft.
Press Request approval and the panel changes immediately, with no confirmation step:
PENDING APPROVAL $6,196.54 Withdraw request · History
The shape of this will be familiar if you have read Chapter 8: it is the same conversation the general contractor has with their customer, one link further down the chain. You send a number, it leaves your hands while it sits with them, and Withdraw request is how you take it back.
History keeps the record of what was sent and when.
On the contractor's side
Their side of the same conversation is their estimate's Subcontractors tab — the eighth tab you do not have. While your price sits with them it reads:
[the subcontractor] · PLANNED · 0% · ACTION NEEDED · Messages · NOT AGREED $6,196.54
Nothing can be billed until you approve a new price. [the subcontractor] sent a price for your approval — approve or reject it below.
PENDING YOUR APPROVAL $6,196.54 — Approve · Reject · History · Ask for a scope change · Withdraw works…
They press Approve, and their card settles to APPROVED $6,196.54 with Request price change where Approve and Reject used to be.
Once they have approved it
Your own panel settles too, and it gains a control it did not have before:
APPROVED $6,196.54 Request sum change · History
Withdraw request is gone — the number is agreed, so there is no request left to withdraw. What replaces it is Request sum change: the price is settled, and changing it now is a new conversation rather than a correction of an old one.
Approval before staffing
This is the single precondition for everything in the rest of this chapter, and it is easy to meet without noticing. Until the general contractor has agreed your price, the works on your Labor tab carry no assign control at all. Not a greyed one: nothing. The ASSIGNEE column is simply empty, and there is no gesture on the row to make it do anything.
Driven, on the same seat minutes apart: with the quote at DRAFT, the tab offered zero assign controls across all three works. The general contractor pressed Approve, the subcontractor reloaded, and two of the three grew an Assign… button. Nothing else about the seat changed.
That is deliberate. A subcontract you have not won is not yours to staff — putting your people on it would be scheduling work nobody has agreed you are doing. So the order is fixed: price it, get it approved, then staff it.
Staffing your own crew
The second power, and the one the approval above unlocked. On a work you hold, the ASSIGNEE column carries an Assign… button, and it opens a small panel:
Assign — Reinforced concrete foundation slab WORKER / CREW / SUB — Choose… Share % Assign
Your own roster
Open the picker and you get your own people, and only your own people. On the company used for this chapter it offered three names — Hector Ramos, Marta Nowak, Victor Reyes, its whole roster — and none of the general contractor's. Your staffing is your business, and their roster is not yours to see.
None of the three is greyed out, and all three carry logins of their own. That is worth saying because a roster person with no login is a different matter — a crew cannot hold one, and the general contractor's own panel refuses to put work on one. Everyone on this roster has an account, so the question does not arise here.
The rest behaves like the assign panel in Chapter 7: a Share % so a work can be split between two people, and an Assign button that does nothing until you press it.
And — as everywhere in the estimate — nothing is written until you press Save changes. Press Assign and the counter at the top right of the estimate starts counting; the assignment exists on your screen and nowhere else until you save it.
What the row shows afterwards
Assign somebody, save, and three things change on the row at once. Its COVERAGE cell reads 1 worker, its ASSIGNEE cell becomes a disclosure reading 1 assignee, and under it appears the holder's own line:
1 assignee · ● Hector Ramos Progress | Work distribution Hector Ramos · 114.8 h · 100% of this work · Unassign · Assigned · Not scheduled
That line is four things in a row, and each is a control:
| on the line | what it is |
|---|---|
| Progress · Work distribution | which of two instruments the line carries — the ladder, or the share editor. One at a time, never both |
| Unassign | take this person off the work |
| Assigned · Not scheduled | the dates, and the way into the schedule |
| the ladder | how far this person's share has got — the next section but one |
Progress · Work distribution
what it is
which of two instruments the line carries — the ladder, or the share editor. One at a time, never both
Unassign
what it is
take this person off the work
Assigned · Not scheduled
what it is
the dates, and the way into the schedule
the ladder
what it is
how far this person's share has got — the next section but one
The schedule
Chapter 7 met the words Assigned · Not scheduled on every holder line and could not follow them. They are a button — its hover text says "Open the schedule to view / set this assignment's dates" — and this is where it leads.
What the button opens
Press it and a full scheduling surface opens for that one person on that one work:
Schedule assignment Hector Ramos · Reinforced concrete foundation slab 114.8h to schedule — your 100% share of 114.8h ≈ 14 slots of 8h + 1 short slot ~2.8h
DrawToBid has done the arithmetic for you: it knows the person's share of the work, turns that share into hours, and tells you how many working days that is before you place a single one. On an assignment that already has blocks on it, a second reading joins the first — 0h still to lay — saying how much of that arithmetic is left.
Underneath is a calendar — a working day from 7:00 AM to 7:00 PM, a week at a time — and, on a fresh assignment, one sentence in the middle of it:
No slots to schedule yet — click the calendar to add a time slot.
Around it is the full set of controls:
| control | what it does |
|---|---|
| ‹ · Today · › | move the calendar back and forward, or jump to today |
| Day · Week · Month · List · Year | five ways to look at the same schedule |
| History | what was scheduled, and when it changed |
| Cancel · Save | leave it alone, or write it |
‹ · Today · ›
what it does
move the calendar back and forward, or jump to today
Day · Week · Month · List · Year
what it does
five ways to look at the same schedule
History
what it does
what was scheduled, and when it changed
Cancel · Save
what it does
leave it alone, or write it
Clear schedule joins them once there is something to clear; on an assignment with no slots laid it is not offered, because there would be nothing for it to do.
When blocks are laid, the line under the holder stops saying Not scheduled and starts naming the span instead, so you can read a person's dates off the estimate without opening the calendar at all.
This is your own schedule, in full detail. Your people's names, your split between them and your dates are yours: the company that hired you sees a single line for the whole package and none of the people underneath it.
Reporting the work
Open your estimate with Calculate and press LABOR. Your works are listed by category. Open the category, and on the work you want press the assignees button on the right of the row — it reads 1 assignee, with the person's name beside it. How far the work has got is read off the category line above it, which carries a glyph and a count: ● 3 planned, ◐ 3 in progress, ◆ 3 for review.
The ladder on the line
Each person you have put on the work has a line of their own, and the end of that line is the ladder:
Hector Ramos · 114.8 h · 100% of this work · Unassign · Assigned · Not scheduled Take up — a slider, a % box, and a Take up button
The control is one thing in three parts: the name of the rung, a slider and a % box, and the button that composes the move — all three reading Take up on a work nobody has started. The box opens at the whole of what is still available to that person: on the man above, holding 100% of the work, it rests at 100, and on one holding 40% it rests at 40, not at 100. So pressing the button without touching anything reports the whole of his share. Type or drag a smaller figure to report part of it.
Saving a rung
Press it and nothing has gone anywhere yet. The line marks itself unsaved, and the counter at the top right of the estimate becomes Save changes 1 — the same rule as everywhere else on this screen. Press Save changes and it is written: the category the work sits in rolls up to ◐ 3 in progress, and the scene tree's PROGRESS filter grows an IN PROGRESS bucket.
The line then offers the next rung. Its name and its button are not the same words — the rung reads Hand over for review and the button beside the box reads Hand over — and the road is the same: set the share, press the button, then Save changes. The category then reads ◆ 3 for review.
And then two more controls appear on that line: Verify and Return from review — each with a slider, a box and a button of its own, the button reading Verify and Return. They are there because these are your own company's people and you are the owner of the company that holds the work: checking your own crew's work is yours to do, exactly as Chapter 18 describes it for a builder checking his. What you cannot do from here is anything about the general contractor's own crews.
Everything above was driven at the share the box opens on — his whole 100%. Type or drag a smaller figure before pressing and only that part of his share moves; the rest stays on the rung below.
What crosses to the contractor
He does not see your people. On his own estimate the works he gave you read Sub: [the subcontractor] with 100% coverage and no holder lines at all, and what your reporting moves is the summary at the top of the category — his Foundations group changed to 3 for review the moment your work was handed over, and his FOR REVIEW filter now has something in it.
So the split is exactly what the schedule section above describes. Your names, your split and your dates stay on your side; what crosses is how far the package has got.
What this chapter did not cover
Named so their absence is not read as everything being covered:
composing a payment application. Your Progress billing tab opens for business the moment your price is agreed — it names your company as the contract to bill against — and this chapter reaches that door and stops at it. What you fill in, what the general contractor does with it and what comes back is Chapter 8's road walked from this side;
asking for a change once the price is agreed. Request sum change replaces Withdraw request on an approved quote, and pressing it is a conversation this chapter has not had;
declining an invitation, and what the general contractor sees when you do;
the tender itself — bidding against other companies for the same package, and what being awarded or passed over looks like from your side;
the message channel between you and the company that hired you;
what the quote's History panel holds. History sits beside the quote's state on the Total tab and beside the dates on the scheduling surface; this chapter rings both and opens neither.