The DrawToBid manualSearch the manual

Chapter 15

Follow the build as the customer

Every chapter before this one is written for the person building the house. This one is written for the person paying for it.

Your builder works in DrawToBid. At some point they will put you on the project, and you will find yourself looking at a screen full of somebody else's tools. This chapter is about the seat you get, and it says so at the top of your screen:

Customer access — set the price of the materials you supply and approve each draw. Everything else is read only.

That sentence is the whole chapter. You have exactly three jobs here — agree the price, put your own price on the materials you are buying, and approve each request for payment — and everything else on the screen is there for you to read, not to touch.

Everything below was carried out on the running product on 6 and 8 September 2026, in the order it is written, on one customer's account from the first sign-in to the last message.


Getting in

You sign in the ordinary way, with the email address and password you set up yourself. You do not need a company and you are never asked to make one — a company is what a builder needs; your account page offers you one and nothing on this seat requires it.

Where you land

You land on the project itself. Signing in puts you straight onto the job — the drawn building, the Customer access banner across the top, the progress panel on the right, and Calculate in the toolbar. There is no list to cross and no door to find: the seat this chapter describes is the first thing you see.

The very first time you arrive, a short card meets you on top of the project. It names the project, says what you are here as, and explains the one word on this screen that is not plain:

DrawToBid funny home You were invited as the customer — follow the build and approve what you are asked to. The estimate is the works and the money; the project is the building itself. Calculate, top right, opens the estimate any time. Open the estimate · View the project

Two buttons under it, and each does what it says. Open the estimate takes you to the estimate's Total tab.

View the project simply closes the card: the building stays where it was, with the progress panel on the right.

It shows once — on the arrival that accepts your invitation — and never again. Reload the page, or sign in again tomorrow, and you get the project straight away.

This road was walked cold: an address with no DrawToBid account behind it was invited by the builder, an account was made against it through Register, the verification link was followed, and the first sign-in landed on the project with that card on top of it.


Your seat

The banner runs across the top and names what you may do.

Under it is the same 3D view of the building your builder works in, and a panel down the right showing how the job is going — the overall figure, the three state counts, and every work in the job by name:

DrawToBid funny home — Overall progress 0% — Approved 0/3 works 0 IN PROGRESS · 0 APPROVED · 3 NOT STARTED Reinforced concrete foundation slab — Not started Timber-frame structural wall (timber-frame house) — Not started Gypsum board partition on wood studs — Not started

Down the left is the SCENE column, the same one your builder has: a search box, the eye that shows and hides everything, a HIDDEN filter, and the project tree. It is worth one press when you first arrive — if part of the building is missing from the view, press the eye at the top of that column and it comes back, which is how the picture above was taken. Chapter 19 reads that column properly.

You can turn the model, zoom it, switch between the 2D and 3D views, use the compass at the top right to swing round to any elevation, and open the estimate with Calculate. You cannot move anything in it: there is no drawing tool rail on this seat — counted on 6 September, zero tools, not greyed, not there at all. A Move pill does sit above the viewport; it moves the camera, not the building.

Four tabs, where your builder has eight

Press Calculate and the cost estimate opens beside the model. You get:

Total

what it is

the price, and your approval of it

Progress billing

what it is

the payment requests — draws — your builder sends you

Labor

what it is

every work in the job, its quantity and its labour hours

Materials

what it is

the materials you have agreed to buy yourself

Your builder's own estimate carries eight — the same four plus By party, Subcontractors, Details and Equipment, counted on their screen on the same job. Those carry their trade breakdown, what they pay their subcontractors, and their own margins. They are not on your screen and you cannot reach them. That is deliberate.

Before your builder has sent anything

A brand-new customer's Total tab is not empty and not broken — it says what it is waiting for:

APPROVE FINAL PRICE — DRAFT Your contractor has not sent a price yet. When it arrives, you will be asked to approve it here.

Everything from here on describes the same seat once your builder has sent one.


The price

Open the Total tab. When your builder has sent their price for approval, it is the first thing on it.

One price runs through this whole section, and it is one job's, on 8 September 2026. The panel carries whatever price your builder actually sent, so the amount on your screen will be yours — what to read here is the sequence the panel goes through and what each state lets you do.

APPROVE FINAL PRICE The general contractor sent this final price for your approval. PENDING YOUR APPROVAL — $302,900.41 Sent for your approval on Sep 8, 2026.

It rings your bell too. A line arrives on the notification bell in the top right the moment the price is sent: "[the owner] requested price approval — DrawToBid funny home", with a Review that lands you here.

The second block

Underneath the figure there is a block headed WHAT YOU ALSO APPROVE:

1 allowance in this price Smart vapor retarder, Class II (variable-perm) — ALLOWANCE — Material — $89,478.36

An allowance is a line your builder has priced provisionally, because nobody yet knows the real number — a material not yet chosen, a quantity not yet certain. Approving the price approves the allowance with it, at that provisional rate.

DrawToBid refuses to let one travel silently. It counts them, names them, prices them, and on your builder's side of the same panel it warns in plain words that the rate is still moveable — "This rate can change until the first payment application." That is the moment it stops being moveable.

If your project has no allowances in it, this block does not appear.

What it will actually cost you

Below the figure, DrawToBid answers the question you actually have, and answers it honestly rather than flatteringly:

Your total cost if you approve this price — Not yet known the proposed price plus what you buy yourself 6 of your materials have no price yet. Set your prices →

The figure your builder asked you to approve is their price. If you are buying some of the materials yourself, your real outlay is their number plus yours — and DrawToBid will not guess at that total. It stays Not yet known until you have filled your side in, and the link takes you straight there.

Approve, or decline

You have two controls: Approve and Reject.

Approve takes effect immediately. There is no confirmation step, no second dialog, no signature.

Reject opens a dialog first, and a reason is required: the Decline quote button is greyed out until you have typed one. That is deliberate — a decline with no reason tells your builder nothing they can act on.

Type one and the button comes alive. Driven on 6 September: with the box empty the Decline quote button is disabled; with a reason in it, it is not.

What approval leaves behind

The panel restates itself, and the cost line above loses its conditional — it now reads Your total cost of the build rather than if you approve this price:

APPROVED — $302,900.41 1 allowance approved on Sep 8, 2026 View what you approved · What you signed · Compare with today · History

Those four links are the most valuable thing on this seat, and they are easy to walk past. This is the record of what you agreed to, kept separately from the project, which is free to keep changing.

View what you approved expands the allowance block in place, naming each allowance you approved and the figure it stood at.

What you signed opens the whole thing — every work and every material, with the quantity each stood at on the day you signed, and Open the signed model, which shows you the building as it was then. Nothing on that list can change afterwards. On this walk it opened headed "Signed Sep 8, 2026 · $302,900.41" above Open the signed model and the list of works.

Compare with today is the one to keep coming back to. It puts that frozen list beside the project as it stands now: it opens headed "What you signed vs. the project today" with both dates side by side, and then names what has moved, line by line — on this walk, Perimeter expansion strip 213.92 LF → changed to 214.85 LF.

The screen makes no judgement about any of it. It does not say who added those items or whether they cost you anything; it says only that they were not in what you signed. That is a conversation to have with your builder, and this page is what to have it with.

History is the plainest of the four: a dated list of everything that has happened to this price, naming who did what and when — on this walk, submitted by the builder at 11:58 and approved by the customer at 12:23 the same morning, both against $302,900.41.


The materials you are buying

Open the Materials tab. It opens with a sentence that is worth taking literally:

Set your price for the materials your contractor asked you to purchase. These are the only values you can edit — everything else is read-only.

This tab lists only the materials your builder has marked as yours to buy — not the whole material list of the job. In the project walked for this chapter that was nine rows out of a material list several times longer.

Five columns:

№ / NAME, UNIT OF MEASURE

what it holds

the material and the unit it is counted in

TO BUY

what it holds

how much of it the job needs

YOUR PRICE

what it holds

the price per unit — the one field you can type in

ESTIMATED COST

what it holds

what that price makes the whole quantity cost

PURCHASED

what it holds

what you have actually bought so far

A row you have not priced yet reads:

1 — Deep-penetrating primer — lb — 50.863 — Not priced — Set your price — Nothing bought yet

The quantity is your share, not the job's. The job as a whole needs far more of that primer than your row asks for; your builder is buying the rest. A material can be split between you, and the tab shows only the part that is yours.

A row with nothing to buy on it says so. Some rows carry no quantity and no price control, and the row explains itself where the figures would be: "Nothing in this estimate uses this material, so there's nothing to buy on this line — ask your contractor." Three of the nine rows in the project walked here read that way. There is nothing for you to do with such a row — the sentence tells you who to ask.

Putting your price on a row

Set your price is the control on an unpriced row, and it puts the cursor in that row's YOUR PRICE box.

Type the price you expect to pay per unit and commit it. The row fills itself in:

1 — Deep-penetrating primer — lb — 50.863 — $ 12.5 — $635.78 — Record — Nothing bought yet

The estimated cost is worked out for you — $12.50 a pound against 50.863 lb — and where Set your price was there is now a Record button. Reload the page and the figure is still there.

What your prices do to your total

Go back to the Total tab and the honest-total line has grown a companion:

Materials you buy yourself — At least $635.78 Your total cost of the build — At least $303,536.19 the approved price plus what you buy yourself — 5 not priced yet

Note the wording: At least. DrawToBid is telling you that this is a floor, not a total, because five of your materials still have no price. It counts down as you fill them in, and the arithmetic is plain — $302,900.41 approved plus $635.78 of yours makes $303,536.19.

Recording what you actually bought

Record, on a priced row, opens a small form.

Record a purchase — Deep-penetrating primer Budget price $12.50 / lb QUANTITY BOUGHT — lb — Remaining to buy: 50.86278802 lb ACTUAL PRICE PAID — $ per lb SUPPLIER / WHERE PURCHASED (optional) This purchase: 50.86278802 lb × $0 = $0 Cancel — Record purchase

Three things about it:

  • the quantity field opens already filled in with the whole remaining amount, so recording "I bought all of it" needs no typing at all;

  • the price you type here is what you actually paid, which is deliberately separate from the budget price above it — the two are allowed to differ, and that is the point of recording it;

  • the supplier line is a note to yourself. DrawToBid keeps no supplier list and does nothing else with what you type there.

The line at the bottom recalculates as you type, so you can see the total before you commit it. Afterwards the row carries the record, tracks the remainder honestly, and Record stays available so you can add the next purchase to the same material.

What your builder sees of this

On your builder's own material list the row you were given reads differently from theirs: it is marked Customer, and they see no price on it. A sibling row may read Excluded, which is the third possibility — a material that is in the job's specification but that nobody is buying through this estimate.

Your prices are yours. What you paid, and who you paid it to, is on your side of the tab.


The Labor tab

Labor is the full list of the works in your job — twenty-two rows in the project walked here — with, for each one, the quantity it covers and the labour it takes:

№ — NAME, UNIT OF MEASURE — QUANTITY — PER UNIT HOURS — TOTAL HOURS 1 — Reinforced concrete foundation slab (1 CY) — 75.042 — 1.529 — 114.75 11 — Floor thermal & sound insulation (1 SF) — 1,678.081 — 0.025 — 42.17

There is no money on this tab at all — no rate, no line total, no sum; the whole table was read and it prints no dollar figure anywhere. It answers what is being built and how much work it is, and leaves the price to the Total tab.

Two controls sit on it, both counted on 6 September: a JOINED / DETAILED switch at the top, which changes how finely the rows are broken up, and a small eye beside every row — twenty-one of them on this job — which isolates that work in the 3D model. The eye is the quickest way to see what a line actually refers to.


The draws

Progress billing is where your builder asks to be paid. In DrawToBid a payment request is called a draw on your side and an application on theirs — the same document under two names.

Before one has been sent, the tab says so:

Nothing to review yet Your contractor hasn't sent a draw for this period.

Why a draw waits on your approval

This is worth knowing because it explains a delay you might otherwise wonder about. Until you have approved the final price, your builder's version of this screen has no way to compose a draw at all, and it tells them why:

You cannot compose an application yet. The final price has not been sent to the customer for approval yet. Send it for approval — an application is a breakdown of the figure the customer approved.

A draw is not a bill somebody writes; it is a breakdown of the number you already agreed. The whole screen follows from that, including refusing to exist before there is an agreed number to break down.

And agreeing the price is not enough on its own. Once you have approved it, your builder's tab offers them + New application — and the form they get tells them what a draw is actually made of:

This application will report the state of the work as of the end of the month. Everything you authorised as payable by that date is on this application — no matter when you authorised it. Every percentage is read from the scene: each work bills at the percentage you authorised as payable, after the crew submitted it and your foreman verified it.

So a draw carries work that has been done, submitted, verified and authorised — nothing else. On a job where none of that has happened yet, the form says so outright and the draw would bill nothing. That road — submitting, checking and authorising work — is Chapters 18 and 8.

Where this chapter stops

A draw with money on it could not be produced on this walk. The price was sent and approved here, on camera, and the builder's side then offered the form above — but no work on this job had been submitted, verified and authorised as payable, so there was nothing for a draw to bill and none was sent. What a populated draw looks like on your side — its heading and period, the four figures per work, the allowance reconciled against what was actually spent, the totals, the print control and the two answers you give it — is therefore not described here. Chapter 8 is the builder's road to a populated application, and it stops at the same wall.

What is proved here is the shape of the thing: your builder cannot ask you for money before you have agreed a price, and what they ask for afterwards is a breakdown of that figure and of work that has actually been checked.

DrawToBid is not a payment system. It agrees what is owed and records that you agreed it. The money moves however you and your builder have arranged for it to move.


What you cannot do

Named plainly, so you do not go looking. All of these are about your builder's project — the job you were invited onto. Your own empty editor, which the last item reaches, is a different screen and carries its own controls:

  • you cannot change any figure in the estimate except your own material prices;

  • you cannot see who your builder subcontracted to, or on what terms — those tabs are not on your screen;

  • you cannot share your builder's project with anyone else, invite anyone, or manage access — there is no Share control and no File menu on that seat;

  • you cannot move, add or delete anything in your builder's model — the drawing tools are not on that seat;

  • you cannot switch to another project from this seat. Your builder's project is not in your project list, and this seat only ever shows you the one job.

  • you cannot reach your builder's company at all. Asked directly for the project behind their own address, the server answers "You are not a member of any company".

If you type your builder's own project address into the browser — the one that works for them — you are not shown their job and you are not left guessing. DrawToBid puts you on your own empty editor, headed Untitled project, and says why, on that screen:

That link didn't open — You don't have access to that project. This is your own editor. Close

Nothing of your builder's project was exposed and nothing of yours was lost. Go back to your own seat: sign in again, or use the bell.


Writing to your builder

You can. There is a small speech-bubble control in the top right, beside the bell.

It opens a Messages panel under it, in the top right of the screen. On a job nobody has said anything on yet it says so, and offers the one control that changes that:

Messages × New message Nothing has been discussed yet.

New message turns the panel into a composer, with two fields and a Send:

Both fields are required, and the subject is the one people miss. Press Send with only the message written and nothing is sent — the panel answers "Add a subject — it names this conversation in the list." Fill the box that asks What's this about?, and Send goes.

The moment it goes, the conversation is on your own panel, headed with your subject and showing your message under You:

Messages › [your name] › [your subject] × General · opened by [your name] · just now You · just now — your message

And it arrives

This was driven both ways. Your builder's own Messages panel lists the parties on the job, and your row is no longer No messages yet — it carries the opening words of what you wrote and how long ago it arrived:

Open it and your message is there, word for word.


The bell

Top right, beside your account name. It carries a count when something is waiting for you.

It is how your builder reaches you. When they ask you to approve a price, a line arrives on it:

NOTIFICATIONS — Mark all read [the owner] requested price approval DrawToBid funny home · how long ago it arrived — Review

Review is a second door onto the same seat, and it works.


Not covered

Named so their absence is not read as everything being covered:

  • what happens after you decline a price — the dialog and its required reason were driven, but the decline itself was not carried through, so what your builder sees afterwards and how a revised price comes back to you are not described here;

  • a populated draw, for the reason given in its own section above;

  • the receipts behind an allowance, which are part of that same road;

  • deleting a purchase you recorded, which the seat allows and this walk did not exercise.

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details