Chapter 27

The works tree, group by group

The Constructor tab is the catalog. It is where you say what you are about to build before you build it, and everything the estimate later says about materials, labour and cost is decided by which work you chose here.

Chapter 4 teaches the road: choose a work, pick a shape, set the size, place it. This chapter is the map — every group in the tree, every work in it, and what the product tells you about each one before you commit to it. It is the page to keep open when you know what you want to build and do not yet know what DrawToBid calls it.

Everything below was read off the running product on 6 September 2026, on the project DrawToBid funny home — a drawn house of 454 elements, which is also the house every picture in this chapter is taken on. The counts are the product's own, taken by opening each group and counting the rows it drew.

For how a section opens and closes, what a greyed control means, and how a search box behaves when nothing matches, see chapter 25 — that furniture is not re-described here.


The tab starts empty

The works tree is not on the screen when you arrive. Open the Constructor tab on a project where nothing is selected and you get a building icon over one sentence: "Select a constructor group to see its tree."

Click the building's row in the scene column on the left, and the tree appears. That is the whole condition — the catalog is the catalog of the thing you have selected, so until you have told DrawToBid which building you mean, there is nothing for it to list. Chapter 4 walks this as a step; it is worth knowing here because an empty Constructor tab is almost always this and not a fault.

What is above the groups

The Constructor tab is one of three tabs at the top of the right-hand panel — Constructor, Geometry, Material. Above the groups it carries four things:

the catalog's name

what it does

on the project driven it reads Building. It is a label, not a control

Catalog changed

what it does

a chip. Its hover text is "Catalog changed — review changes to this project"

a reload control

what it does

hover: "Reload catalog from the API — pull in works added in the admin (does not touch the building)". The second half of that sentence is the important one: it refreshes the list you are choosing from and leaves what you have already built alone

Search works…

what it does

a box that narrows the tree by name

The chip is on Calculate too

The Catalog changed chip is also on the Calculate button. With the chip showing, the Calculate button in the top strip announces itself as "Calculate — catalog update available" rather than plainly. Two places, one message.

The fifteen groups

With every group closed the tab is fifteen rows and nothing else — no work is shown until you open a group, which was checked rather than assumed: with all fifteen closed the tree holds zero work rows.

Each row is the group's name and the number of works in it. Every count below was checked against what opening the group actually produced, and all fifteen agree:

Foundations

works

8

Walls

works

12

Exterior finishing

works

15

Columns

works

2

Interior finishing

works

15

Chimneys

works

1

Floors

works

8

Ceilings

works

3

Floor slabs

works

3

Openings

works

4

Stairs

works

1

Roof

works

20

Site / Landscaping

works

8

Fences and railings

works

5

Decorative elements

works

3

One hundred and eight works in all.

The order they are in

The order is the order a house is built in, not alphabetical and not the catalog's own. Ground first, then what stands on it, then what covers it, then what goes in it, then the roof, then the land around it. Work down the list and you are working in the order the trades arrive.

Opening one does not close another

Opening one group does not close another — they are ordinary sections, each with its own triangle, and you can have as many open at once as you like.

What a work row tells you

Every row prints the work's name and its unit of measure — CY, SF, LF, EA. Rest the pointer on it and the hover text adds the thing the unit does not say: what the work is billed by.

There are seven of those across the whole tree, and the distinction matters because it decides what the estimate multiplies:

volume

what it measures

how much material fills the shape

an example

Reinforced concrete foundation slab — CY

surface area

what it measures

the face of the thing

an example

Timber-frame structural wall — SF

footprint area

what it measures

the ground it covers, not its face

an example

Concrete floor screed — SF

length

what it measures

how far it runs

an example

Reinforced concrete ring beam — LF

the piece

what it measures

how many there are

an example

Window installation — EA

height

what it measures

how tall the member stands

an example

Wooden porch column — LF

risers

what it measures

how many steps it climbs

an example

Wood stair, site-built — EA

SF is two different questions

SF is two different questions. A wall billed by surface area and a floor billed by footprint area both print SF, and they are not measuring the same thing — one is the face you can see, the other the ground underneath. The unit alone will not tell you which; the hover text will.

The two the unit hides

The last two are the ones the unit hides completely. The porch column prints LF like any other run of timber but is billed by its height, and the stair prints EA like a window but is billed by its risers — one stair is not one piece, it is however many steps it has. Neither is guessable from the unit.


Foundations — 8

What goes under the building, from the bed it sits on to the wall that comes out of the ground.

Gravel / crushed-stone sub-base

unit

CY

billed by

volume

Reinforced concrete foundation slab

unit

CY

billed by

volume

Reinforced concrete strip foundation

unit

CY

billed by

volume

Foundation wall masonry from concrete blocks

unit

SF

billed by

surface area

Reinforced concrete pad foundations

unit

CY

billed by

volume

Foundation thermal insulation with XPS boards

unit

SF

billed by

surface area

Granite aggregate sub-base

unit

CY

billed by

volume

Sand sub-base

unit

CY

billed by

volume

Three of the eight are beds, not foundations — sand, gravel and granite aggregate sub-base. They are the layers that go in before anything is poured, and they are billed by volume like the concrete above them.

Walls — 12

Walls in the strict sense: things that hold the house up, and things that divide a room. Nothing that merely lives on the outside of a wall is here — that is all under Exterior finishing.

Walls that carry load

The structure — walls that carry load:

Timber-frame structural wall (timber-frame house)

unit

SF

billed by

surface area

Load-bearing wall masonry from modern blocks (aerated concrete / hollow ceramic / silicate)

unit

SF

billed by

surface area

Load-bearing wall masonry from solid ceramic bricks

unit

SF

billed by

surface area

ICF wall (insulated concrete form)

unit

SF

billed by

surface area

Walls that divide

The partitions — walls that divide but carry nothing:

Gypsum board partition on wood studs

unit

SF

billed by

surface area

Double-plated gypsum board partition on steel frame

unit

SF

billed by

surface area

Single-plated gypsum board partition on steel frame

unit

SF

billed by

surface area

Partition wall masonry from AAC blocks

unit

SF

billed by

surface area

Partition wall masonry from hollow ceramic bricks

unit

SF

billed by

surface area

Solid gypsum block partition wall

unit

SF

billed by

surface area

Two that run along a wall

And two that run along a wall rather than being one:

Reinforced concrete ring beam

unit

LF

billed by

length

Double top plate (wood framing)

unit

LF

billed by

length

Exterior finishing — 15

Everything that goes on the outside of a wall — both the finishes applied to a wall that already exists (plaster, paint, stone) and the systems built onto one (siding on its own subframe, ETICS, clinker). Every one of the fifteen is billed by surface area and measured in SF; this is the most uniform group in the tree.

External cement-lime plaster (traditional)

unit

SF

Clinker / ceramic facade cladding

unit

SF

Facade painting with elastic acrylic paint

unit

SF

Decorative exterior plaster (baranek / kornik)

unit

SF

Thin-layer exterior plaster (smooth)

unit

SF

Exterior decorative (artificial) stone cladding

unit

SF

Exterior marble cladding

unit

SF

Vinyl siding

unit

SF

Exterior natural-stone cladding

unit

SF

Exterior skim coat (facade leveling)

unit

SF

Engineered-wood siding

unit

SF

ETICS facade thermal insulation system

unit

SF

Fiber-cement siding

unit

SF

Timber facade cladding on subframe

unit

SF

Clinker brick facade cladding

unit

SF

If you are looking for cladding or siding, this is the only group that has any. Walls holds none of it.

Columns — 2

Wooden porch column

unit

LF

billed by

height

Brick column masonry

unit

CY

billed by

volume

Two columns, and no two works in the tree are billed less alike. The timber one is measured by how tall it stands; the brick one by how much brick is in it.

Interior finishing — 15

The same idea as Exterior finishing, on the inside.

Cement-lime interior plaster

unit

SF

billed by

surface area

Machine-applied gypsum interior plaster

unit

SF

billed by

surface area

GK board wall cladding on steel framing

unit

SF

billed by

surface area

Gypsum skim coat (smooth finish)

unit

SF

billed by

surface area

Interior wall painting (acrylic / latex)

unit

SF

billed by

surface area

Ceramic wall tile installation

unit

SF

billed by

surface area

Decorative interior plaster

unit

SF

billed by

surface area

Interior decorative-stone cladding (artificial)

unit

SF

billed by

surface area

Interior marble wall cladding

unit

SF

billed by

surface area

Interior mosaic cladding

unit

SF

billed by

surface area

Wallpapering

unit

SF

billed by

surface area

Interior natural-stone cladding (sandstone / slate)

unit

SF

billed by

surface area

Wood wall paneling / shiplap / wainscot

unit

SF

billed by

surface area

Baseboard installation

unit

LF

billed by

length

Crown molding installation

unit

LF

billed by

length

Thirteen of the fifteen are surfaces; the last two are trim. Baseboard and crown molding are the only works in this group billed by the running foot, because they run along a wall rather than covering it.

Chimneys — 1

Chimney construction (system / brick)

unit

LF

billed by

length

Floors — 8

What you walk on. Every one is billed by footprint area — the ground the floor covers.

Concrete floor screed

unit

SF

Solid hardwood flooring (site-finished)

unit

SF

Floor thermal & sound insulation

unit

SF

Laminate / LVT panel flooring

unit

SF

Floor ceramic / gres tiling

unit

SF

Linoleum / PVC floor

unit

SF

Carpet flooring

unit

SF

Engineered parquet

unit

SF

Two of the eight go under the other six — the screed and the insulation are the build-up, not the finish.

Ceilings — 3

Single-level GK suspended ceiling

unit

SF

billed by

footprint area

Suspended acoustic grid ceiling

unit

SF

billed by

footprint area

Two-level plasterboard suspended ceiling — cross-braced framing

unit

SF

billed by

footprint area

All three are suspended ceilings. There is no work here for finishing the underside of a slab directly — that is a plaster or a paint, and it lives in Interior finishing.

Floor slabs — 3

The structure between one storey and the next. Not to be confused with Floors above, which is what you lay on top of it.

Wooden beam slab

unit

SF

billed by

footprint area

Monolithic reinforced concrete slab 15-18 cm

unit

SF

billed by

footprint area

Prefab beam-block slab Teriva / Smart

unit

SF

billed by

footprint area

Openings — 4

The only group where every work is billed by the piece.

Entry door installation

unit

EA

billed by

the piece

Garage door installation

unit

EA

billed by

the piece

Internal door installation

unit

EA

billed by

the piece

Window installation

unit

EA

billed by

the piece

A window is a window however big it is: the estimate counts them, it does not measure them. Chapter 4 walks the placing of a window and the three doors.

Stairs — 1

Wood stair, site-built

unit

EA

billed by

risers

The unit and the billing disagree here more than anywhere else in the tree. The row prints EA, and one stair is billed by its risers — so the number that reaches the estimate is how many steps it has, not that there is one of it.

Roof — 20

The largest group and the most varied in the tree — the only one that uses four of the billing bases. It runs from the timber that carries the roof to the cap along its ridge.

The frame that holds it up

The frame that holds it up:

Roof wall plate on RC ring beam

unit

LF

billed by

length

Roof main skeleton: posts + ridge + hip + valley rafters

unit

LF

billed by

length

Common rafter installation

unit

LF

billed by

length

Prefabricated roof truss

unit

EA

billed by

the piece

Room-in-attic truss

unit

EA

billed by

the piece

Girder truss

unit

EA

billed by

the piece

Gable-end truss

unit

SF

billed by

surface area

What goes over the frame

What goes over the frame:

Full roof sheathing — boards / OSB / plywood

unit

SF

billed by

footprint area

Counter-batten + batten

unit

SF

billed by

footprint area

Porch ceiling

unit

SF

billed by

footprint area

Perimeter soffit run (eave and rake)

unit

LF

billed by

length

The covering

The covering:

Bitumen shingle covering installation

unit

SF

billed by

footprint area

Metal roof tile covering installation

unit

SF

billed by

footprint area

Ceramic / concrete tile covering installation

unit

SF

billed by

footprint area

Ridges, valleys and edges

And the lines where two slopes meet, or where the roof ends:

Ridge cap installation — horizontal + hip ridges

unit

LF

billed by

length

Bitumen shingle ridge cap installation — horizontal + hip ridges

unit

LF

billed by

length

Bitumen shingle valley lining (ice-and-water)

unit

LF

billed by

length

Valley tray installation

unit

LF

billed by

length

Pitch transition lining (slope break, ice-and-water)

unit

LF

billed by

length

Fascia / barge board installation

unit

LF

billed by

length

Match the ridge to the covering

The ridge and the valley each come in two versions, and which you want depends on the covering you chose. There is a ridge cap for tile and a separate one for bitumen shingle, and the same for the valley. Choosing the wrong one is not refused — nothing stops you putting a tile ridge on a shingle roof — so pair them yourself.

Four framing works, four bases

Four of the seven framing works are trusses or rafters billed differently from one another — a prefabricated truss is counted by the piece, a common rafter measured by the foot, a gable-end truss by its area. That is the group where reading the hover text before you choose pays for itself.

The other road to a roof

Chapter 24 is about the roof planner on the Workbench, which derives a whole roof from the building you have drawn. These twenty works are the other road: building a roof piece by piece out of the catalog, the way chapter 4 walks it.

Site / Landscaping — 8

Everything outside the building.

Concrete paver installation

unit

SF

billed by

footprint area

Curb / edging installation

unit

LF

billed by

length

Granite slab walkway

unit

SF

billed by

footprint area

Ground preparation with topsoil replacement

unit

SF

billed by

footprint area

Lawn — rolled turf (sod)

unit

SF

billed by

footprint area

Lawn preparation and seeding

unit

SF

billed by

footprint area

Planting trees and shrubs

unit

EA

billed by

the piece

Wood / WPC decking terrace

unit

SF

billed by

footprint area

Two ways to get a lawn, and they are priced quite differently: rolled turf is laid, seed is sown. Ground preparation with topsoil replacement goes under either of them.

Fences and railings — 5

Where a fence and a stair railing meet: the same posts, rails and boards serve both.

Guard post / newel post, timber

unit

EA

billed by

the piece

Baluster, timber

unit

EA

billed by

the piece

Fence post set in concrete

unit

EA

billed by

the piece

Fence / railing rail

unit

LF

billed by

length

Fence board / picket

unit

EA

billed by

the piece

A fence is built out of four of these at once, not chosen as one work: posts, a rail between them, and boards across it. Only the rail is measured by the foot; the rest are counted.

Decorative elements — 3

Timber that is there to be seen rather than to carry anything.

Light decorative timber member (batten, lattice, pergola purlin)

unit

LF

billed by

length

Heavy exposed timber member (pergola beam, girder)

unit

LF

billed by

length

Applied decorative beam (faux / box beam)

unit

LF

billed by

length

All three are billed by the foot, and the choice between them is a choice of size and honesty — light, heavy, or a hollow box made to look like a beam.


What choosing a work does

Choose a work and three things happen at once: a card appears at the top of the tab carrying the work, its unit, what it is billed by and how many materials it involves; the narrow tool rail grows a FIGURES group; and a parameters panel opens under the card.

The rail with no work chosen

With no work chosen the rail carries no FIGURES group at all — it is the ordinary tools chapter 26 counts.

The rail with a work chosen

Choose Reinforced concrete foundation slab and the rail offers one shape, Polygon, and nothing else.

Which shape each work offers

Chapter 28 is the reference for that: which shape each work offers and what its panel holds.


Find a work by name

Use the Search works… box at the top of the tab rather than opening groups one at a time. It narrows by name — type cladding and the fifteen groups become two, Exterior finishing and Interior finishing.

The surviving groups stay closed. The search tells you which groups hold a match; you still open one to see the matches themselves. Opening Exterior finishing under that search shows six rows instead of its usual fifteen.

Clearing the box brings all fifteen groups back.

The boundaries that trip people up

  • a floor — the thing you walk on is under Floors, the structure under it is Floor slabs, and painting the underside of it is Interior finishing;

  • a column, a chimney or a stair — none of them is under Walls, though each is something a wall-builder puts up. They are groups of their own: Columns, Chimneys, Stairs;

  • exposed timber — a pergola beam is under Decorative elements, not Roof, even though the Roof group is full of timber. Roof holds the timber that carries a roof; Decorative elements holds the timber that carries nothing;

  • a railing — under Fences and railings, with the fence, not with the stair it belongs to.


What other people see

On the foreman's seat

Somebody who is not the owner sees the whole catalog and cannot build from it. Signed in as the foreman on the owner's project, the Constructor tab is identical: the same fifteen groups, the same counts, the same works, and choosing one opens the same parameters panel with its material and its Add Polygon button. What is missing is the tool rail: the whole narrow column of tools is gone on a non-owner's seat, so there is no FIGURES group and no shape to draw with — and the top strip carries no Save and no undo or redo. The catalog is a reference you can read; the building is the owner's to change.

On a seat with no company

Somebody with no company gets a scene of their own and the same tree. A brand-new account lands on an untitled project with nothing in it — the scene column holds only Project, the status strip reads 0 elements, and the Constructor tab shows the "Select a constructor group to see its tree" sentence, because there is nothing selected to show a catalog for.

Press New Building at the foot of the scene column and select the building it adds, and the full fifteen-group tree appears. The counts are not identical to a company project's, because they are not the same catalog: a fresh building uses the default catalog, where Foundations holds 11 works and Floors 10, while the project driven above uses one where they hold 8 each. The label above the groups will not tell you which — it reads Building on both. What tells you is the building's own row in the scene column: Building 1 on the fresh one, and the building's own name on the project driven above.

The other difference is not in the tree at all but along the bottom of the screen: this project reads Cloud: kept locally. The Save button is there and is not greyed.


Where this chapter is used

  • chapter 4 — the road from choosing a work to a placed element;

  • chapter 25 — the furniture every screen shares;

  • chapter 26 — the editor's edge, control by control;

  • chapter 28 — what each of these works offers once you have chosen it;

  • chapter 11 — where these works, their norms and their material quantities come from, and what your company may change about them.

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .