Chapter 11
Your company catalog
Every number in Chapters 4, 5 and 8 came from somewhere. You drew a wall and a price appeared; you opened the estimate and it told you how many hours the job takes. You never typed either of those.
This chapter is where they come from.
DrawToBid ships with a catalog of construction work. For each item it knows what the work is, what unit it is measured in, how many man-hours one unit takes, and which materials it consumes and in what quantity. That is what makes the estimate possible: you draw the building, DrawToBid counts the square feet, and the catalog turns them into hours and material quantities.
There is one thing the catalog deliberately does not hold, and it is worth saying at the very start because it explains half of this chapter:
The catalog carries no material prices. Not one, by any route.
It does not carry what a bag of cement costs, because what a bag of cement costs is your business, in your town, this month, and we would be guessing. Every material price in DrawToBid is one you entered, against one material, on one project.
What the catalog does carry is norms — hours and quantities — and, on a minority of works, a suggested labour rate. A labour rate is a different kind of fact from a material price: it is what a company pays its own people, your company is the authority on it, and the figure the catalog offers is a starting point you replace with yours. The section What the two OUR columns hold at the end says exactly how many works carry one and what they read.
On top of that shipped catalog, your company gets a layer of its own. That layer is what these two screens are for, and it is the subject of this chapter: your rates, your norms, your materials and your own works, laid over the catalog without ever changing it.
Everything below was carried out on the running product, in the order it is written.
Where it lives
Open your company and look at the rail down the left. Under CATALOG there are two entries:
| entry | what it holds |
|---|---|
| Rates & Works | every work, with the catalog's numbers beside yours |
| Materials | materials you added yourself, with your prices |
Rates & Works
what it holds
every work, with the catalog's numbers beside yours
Materials
what it holds
materials you added yourself, with your prices
Those two pages are the whole of your company catalog. There is no third one, and there is no separate place where "the real catalog" lives that you have not been shown — the shipped catalog is visible right there on the first page, in the columns marked OUR.
At the top of both pages it tells you who you are: [your company] · Your role: owner. That line decides what you can do here, and the section Who is allowed to change this at the end of the chapter is about nothing else.
Rates & Works: the main table
The page is headed Rates & Works, under a sentence that describes the whole design in one line:
[your company]'s prices and norms on top of the base catalog. Your numbers always win; catalog values are the fallback.
Under it are two tabs — Rates / Catalog and Company works — a second line of explanation, a search box, and a table.
The tab in force when the page opens is Rates / Catalog, and under it the page says what the tab is for: "The base catalog. Set your worker-pay rate and man-hour norm on any work; your override wins, the catalog value is the fallback."
The list is 113 works long
At the bottom of the table sits a pager reading Page 1 of 5 · 113 works, twenty-five rows to a page. Prev and Next move between them; walked end to end on 4 September 2026, the five pages held 25 + 25 + 25 + 25 + 13 rows, which is the 113 the pager claims.
A hundred and thirteen is the number of main works. The catalog also holds dependent works — the small jobs that always ride along with a bigger one — and those are not listed separately here, because you never choose them on their own. They come with their parent.
This page counts a different thing from the works tree you draw with. 113 is every main work your company's rate card can reach. The Constructor tab inside a project offers the works of that project's catalog, which is a smaller list — 108 on the project walked in chapter 28. Neither number is wrong; they are counts of two different populations, and the catalog's name above the Constructor groups is what tells you which one you are looking at.
The Search works… box narrows the whole list, not just the page you are on. Typing Window installation cut the table to a single row and the pager disappeared entirely, because there was no longer more than one page to move between.
Six number columns, and which is which
The table's columns, left to right, are:
WORK · UNIT · OUR NORM · YOUR NORM · OUR DEMOLITION NORM · YOUR DEMOLITION NORM · OUR RATE · YOUR RATE, and then a column of buttons.
The naming is the design, and once you have it the screen reads itself:
"OUR" is DrawToBid speaking. These are the catalog's numbers and you cannot edit them.
"YOUR" is your company speaking. These are yours, you set them, and they win.
| column | what it is |
|---|---|
| OUR NORM | the catalog's labour norm — man-hours to do one unit of this work |
| YOUR NORM | your own norm for the same work, if your crews are faster or slower |
| OUR DEMOLITION NORM | the catalog's norm for taking one unit of the work down — the hours an element marked Demolish is priced at. No norm where the catalog has none |
| YOUR DEMOLITION NORM | your own figure for taking it down |
| OUR RATE | the labour rate the catalog suggests for this kind of work, where it has one |
| YOUR RATE | what you actually pay your people per unit of this work |
OUR NORM
what it is
the catalog's labour norm — man-hours to do one unit of this work
YOUR NORM
what it is
your own norm for the same work, if your crews are faster or slower
OUR DEMOLITION NORM
what it is
the catalog's norm for taking one unit of the work down — the hours an element marked Demolish is priced at. No norm where the catalog has none
YOUR DEMOLITION NORM
what it is
your own figure for taking it down
OUR RATE
what it is
the labour rate the catalog suggests for this kind of work, where it has one
YOUR RATE
what it is
what you actually pay your people per unit of this work
An unset YOUR cell shows an em dash — — — never a zero and never a copy of the catalog's number. That distinction matters: it lets you tell "we have not decided" from "we decided on the catalog's figure".
The two OUR columns report your market
Both OUR columns read against the market your company works in, which today is the United States for every company. So OUR NORM is the US norm for that work and OUR RATE is the US suggested labour rate — the same figures a project resolves when it prices the work. The section What the two OUR columns hold at the end shows the readings this was measured on.
An OUR RATE cell reading not defined means the catalog has no suggested rate for that work — not that the screen failed to find one. Most works have none: the catalog carries a rate only where there was solid backing for it, and never a guessed number. This is the one figure the catalog offers in money, and it is a labour rate, never a material price.
Setting your own norm and your own rate
This is the everyday use of the page, and it is two clicks.
Click a YOUR NORM or YOUR RATE cell. It becomes a small text box in place — no dialog, no separate edit screen. Type a number and press Enter. The cell fills in, turns the accent colour, and that is the whole gesture.
Before you press anything, hovering tells you what will happen. An empty cell reads:
Not set — click to set your norm (overrides OUR NORM) Not set — click to set your worker-pay rate
and once it holds a value, the same cell reads Your norm — click to change and Your worker-pay rate — click to change. Both were read off the running product on 4 September 2026, before and after.
What was driven, and what came back
On Window installation, a work the catalog measures in EA:
YOUR NORM was set to
1.9. The cell changed from — to 1.9 h/EA, and its hover text changed with it.YOUR RATE was set to
61. The cell changed from — to $61/EA.The page was then reloaded from scratch and both were still there. These are stored on your company, not held in the browser.
Getting out, and getting rid of it
Escape abandons the edit. Typing
9.99into a cell already holding1.9and pressing Escape left it reading 1.9 h/EA — nothing was sent.Clearing the box and pressing Enter deletes the override. The cell went back to —. It does not store a zero, which is the difference between "I have no opinion about this work" and "this work costs nothing" — and storing the second by accident would quietly zero out that work's labour in every estimate.
Your own demolition norm
The demolition columns are the hours to take one unit of a work down, for an element marked Demolish in a project (chapter 29). The catalog carries them for the works a rework most often starts with. On Bitumen shingle covering installation, OUR DEMOLITION NORM reads 0.015 h/SF: the shingle tear-off.
Where the catalog has none, OUR DEMOLITION NORM reads No norm, and in a project that work's Demolish is greyed. Concrete floor screed is one. Its YOUR DEMOLITION NORM cell reads —, and hovering it says "Not set — click to set your demolition norm (overrides OUR DEMOLITION NORM)".
It is set the same two-click way as your own norm. Click the cell, type the hours per unit, press Enter:
The cell reads 0.02 h/SF and its hover text becomes "Your demolition norm — click to change". It was still there after the page was reloaded. That is what makes Demolish available on the work in your projects: open the project again and the screed's Demolish is live.
Clearing the box and pressing Enter takes it away again, and the cell goes back to —, as with every YOUR cell.
On a phone the work is a card, and both demolition norms are rows on it: Our demolition norm, read-only, and Your demolition norm (h/SF), a box.
Your own materials
The second page, Materials, is headed with:
[your company]'s own materials — attached to catalog works, visible only to your company, with your prices.
This is where the sentence at the top of the chapter is resolved. The catalog carries no material prices, so this page is one of the two ways a material price gets into DrawToBid at all: you type it.
The table has four columns — MATERIAL · UNIT · YOUR PRICE · ATTACHED TO — and a Delete button on each row. On a company that has added none, it reads No company materials yet.
Adding one
Add material opens the form in place, and the button itself changes to Close — so you always know how to back out. Both were read on 4 September: Add material before the press, Close after it.
The form is headed New company material — attaches to a work, visible only to your company, and it asks for six things:
| field | what it wants |
|---|---|
| Name | your name for it, e.g. "Our supplier drywall 1/2 inch" — the box itself shows e.g. Our supplier drywall 1/2" |
| Unit | how it is measured — ten codes |
| Consumption (SF per LF) | how much of it one unit of the work uses — the label names both ends of the ratio: the material's own unit, then the unit of the work it is being attached to |
| Your price (per SF) | what you pay for one unit of the material, stated per the unit you picked above |
| Find work | a search box |
| Attach to work | which work consumes it — the list re-queries as you search |
Name
what it wants
your name for it, e.g. "Our supplier drywall 1/2 inch" — the box itself shows e.g. Our supplier drywall 1/2"
Unit
what it wants
how it is measured — ten codes
Consumption (SF per LF)
what it wants
how much of it one unit of the work uses — the label names both ends of the ratio: the material's own unit, then the unit of the work it is being attached to
Your price (per SF)
what it wants
what you pay for one unit of the material, stated per the unit you picked above
Find work
what it wants
a search box
Attach to work
what it wants
which work consumes it — the list re-queries as you search
The Unit picker holds exactly ten codes, and it opens on the list rather than on a typed box. Counted on 8 September 2026, in the order the picker prints them:
CY · EA · gal · lb · LF · m-h · pack · set · SF · ton
It arrives set to SF, which is the commonest, not the first in the list.
The price box is the point of this page, and it is the only place on either of these two screens that takes money.
What a price field is for, and what it is not. It records what you pay for one unit of one material, on one work, for your company alone. It is not a market rate, not a quotation, and not something DrawToBid can fill in for you: the catalog underneath carries norms — hours and quantities — and no material price at all, deliberately, because what a bag of cement costs is your business, in your town, this month. Nobody else's company sees a price you type here, and typing one changes nothing for anybody but you.
A material is always attached to a work. That is the point of it: you are not building a price list, you are telling DrawToBid "when this company does this work, it uses this material, this much of it, at this price."
The Attach to work picker is capped at fifty works, and searching is the only way past it. Opened with nothing typed it holds exactly fifty entries — counted with the picker open — out of the 113 the catalog carries. If the work you want is not on the list, type its name into Find work; the picker re-queries as you type, and typing Window installation cut it to that one.
Filled in as Ridgeline housewrap, SF, consumption 1.15, price 0.42, attached to Window installation, and submitted, the row that came back read:
Ridgeline housewrap
Yours· SF · $0.42/SF · Window installation · Edit · Delete
and it was still there after a full page reload.
The Yours badge is on every row of this table, because every row is yours. Nothing on this page came from us.
If you leave something out
Submitting with the name blank produced one message and no new row:
Add material: name, target work and non-negative numbers are required
Deleting one
Delete removes the row immediately. You are not asked to confirm, and nothing is said afterwards — driven again on 4 September: no dialog appeared, the row simply went, and the table returned to No company materials yet. Worth knowing before you press it on a material you spent time pricing.
Your own works
Sometimes the catalog has no entry for something you do. The Company works tab is for that.
It opens captioned Works created by [your company] — visible only to you, and on a company that has added none it reads No company works yet. An owner also gets an Add work button here.
Two ways to start one
Add work opens the work editor empty.
Copy, on any row of the Rates / Catalog tab, opens the same editor pre-filled from that work. Pressing Copy on Window installation opened the editor headed Window installation (copy), at
/company/<your-company>/catalog/works/new.
Copy is the intended route when the catalog is nearly right. The catalog row itself is never edited — you take a copy and change the copy, and the original stays as it is for everybody.
What the editor asks for
The form is long, and it is worth reading what it asks for, because of what is missing from it. It comes in seven blocks. The first, Core, is the one you cannot skip:
Name · Catalog section · Category · Unit · Norm (man-h per SF) · Dimension basis · Figure kind · Coefficient · Quantity, then Sections, an optional Model link, and Default dimensions — Height, Length, Width, Thickness, each taken as a pair of boxes, feet and inches — with an option marked Thickness locked (material-defined — bricks/blocks/boards/tiles; the editor hides the thickness input and rejects overrides) for parts whose thickness comes from the material itself. Two switches close the block: Active, and Add by default.
The Norm field's label names the unit you picked above it. With SF · area in the Unit box it reads Norm (man-h per SF); pick EA · count and it reads Norm (man-h per EA). The number you type is always hours for one of that unit, so the label and the figure can never drift apart. The Unit box itself offers ten, each with what it measures beside it: lb · mass, gal · liquid, LF · linear, m-h · time, SF · area, CY · volume, pack · count, EA · count, set · count, ton · mass.
Six more blocks follow it, and they are why the form is as long as it is:
| block | what it holds |
|---|---|
| Relations | FIGURE TYPES — which shapes this work may be drawn as, ticked from the fifteen chapter 28 lists — and COUNTRIES, which markets the work belongs to |
| TOOLS | which drawing tools the work arms — add-figure, arrow, eraser, move-canvas, rectangle, rotate, ruler |
| PER-COUNTRY NORMS | a norm of its own per market, over the single Norm above |
| EQUIPMENT | the machines the work uses; empty unless you add some |
| DEPENDED WORKS | the small jobs that ride along with this one, each with the dimension it is measured against |
| Materials | what the work consumes — standalone rows are always included, and a bucket is a set of interchangeable alternatives you choose one of |
Relations
what it holds
FIGURE TYPES — which shapes this work may be drawn as, ticked from the fifteen chapter 28 lists — and COUNTRIES, which markets the work belongs to
TOOLS
what it holds
which drawing tools the work arms — add-figure, arrow, eraser, move-canvas, rectangle, rotate, ruler
PER-COUNTRY NORMS
what it holds
a norm of its own per market, over the single Norm above
EQUIPMENT
what it holds
the machines the work uses; empty unless you add some
DEPENDED WORKS
what it holds
the small jobs that ride along with this one, each with the dimension it is measured against
Materials
what it holds
what the work consumes — standalone rows are always included, and a bucket is a set of interchangeable alternatives you choose one of
COUNTRIES offers DE — Germany · PL — Poland · US — United States. That row is catalog data — it says which markets a work belongs to, the same mechanism the per-country norms use. It is not a locale switch: your company's market is the United States and nothing on this form changes it.
Catalog section decides where the work sits in the tree you pick from while drawing; its own hint reads "Where the work lives in the tree (main works only)."
Not one field on this form asks for a price, a cost or a rate. Every label on the form was collected and searched for the words price, cost, rate and the dollar sign, across all seven blocks, and there were none. That is not an oversight and it is the whole shape of the product: a work record holds a norm — how long it takes — and nothing about money. Money reaches it from your rate card on the previous page, and from the materials you attach.
Creating it
Filled in with a name, a norm of 0.35, unit SF · area and catalog section Foundations, Create work confirmed with:
Work created.
and opened the new work's own page. Back on the Company works tab it was listed as:
Crawlspace vapour barrier
Yours· SF · 0.35 h/SF · — · not defined · — · Copy Edit Delete
Rows on this tab, and only this tab, carry Edit and Delete beside Copy. A catalog work can be copied; only your own can be changed or removed.
What happens to a job you have already quoted
This is the question that matters most, and the answer is reassuring: nothing changes underneath you.
A project keeps its own copy of the works it uses. When you change a norm in your catalog, the job you quoted last month does not silently re-price. Instead, the next time you open that project, DrawToBid tells you what changed and asks.
The panel that asks
Open a project whose catalog has moved underneath it and a panel comes up over the editor before you can touch anything, headed Catalog updates. Read on 8 September 2026:
At the top, what the change is worth to this job, before you decide anything:
TOTAL $306,085.93 → $313,735.96
+$7,650.03LABOR 2,585.03 h → 2,911.95 h+326.92 h
(Those are the job as it stood that day. What the panel is showing you is the pair of deltas on the right; the absolute figures will be your own.)
Under them, in the product's own words:
These are catalog norm changes. Your prices are unchanged.
Then a table, one row per affected work, with the old norm and the new one side by side and what each is worth:
| WORK | NORM (OLD → NOW) | COST IMPACT |
|---|---|---|
| Reinforced concrete foundation slab ([the subcontractor]) | 1.53 → 9.72 h/1 CY | +$9,217.14 |
| Full roof sheathing — boards / OSB / plywood | 0.04 → 0.03 h/1 SF | −$805.94 |
| Porch ceiling | 0.09 → 0.06 h/1 SF | −$293.74 |
| Common rafter installation | 0.08 → 0.09 h/1 LF | +$292.09 |
| … |
Reinforced concrete foundation slab ([the subcontractor])
NORM (OLD → NOW)
1.53 → 9.72 h/1 CY
COST IMPACT
+$9,217.14
Full roof sheathing — boards / OSB / plywood
NORM (OLD → NOW)
0.04 → 0.03 h/1 SF
COST IMPACT
−$805.94
Porch ceiling
NORM (OLD → NOW)
0.09 → 0.06 h/1 SF
COST IMPACT
−$293.74
Common rafter installation
NORM (OLD → NOW)
0.08 → 0.09 h/1 LF
COST IMPACT
+$292.09
…
NORM (OLD → NOW)
COST IMPACT
A row names the holder where the work is somebody else's — [the subcontractor] above — and the panel says what that means underneath: "Work that's delegated to a subcontractor can't be changed until it's released. Use Initiate change to ask for it back, or withdraw the subcontract it's on."
Below the table it also reports what has appeared and what has moved:
NEW WORKS IN THE CATALOG — 6 works · each available to add MOVED OR RENAMED IN THE CATALOG — 11 entries · each no cost change
and at the foot, Not now and Apply, with one line above them: "Closing keeps this — it stays on the Calculate button until you apply it."
Read what that panel does, because it is unusually careful:
It shows the money before you decide. Not "the catalog changed" — the actual total, the actual labour hours, and the difference, for this job.
It names every affected work, with the old norm and the new one side by side, and what each one is worth in money.
"Your prices are unchanged." Norms move; the money you agreed does not move by itself.
It separates what is new and what merely moved, and offers new works rather than adding them.
Nothing is applied until you press Apply. Pressing Not now does not lose the message: it moves to the Calculate button, which then carries a mark, and a Catalog changed chip appears beside the project in the right-hand panel. Both were read after pressing it.
And what pressing Apply does
Apply is the press that moves the catalog's changes into the job. It was driven on 16 September 2026, on the same project, and everything below is what came back.
The panel you reach from the estimate — the Review & apply control on its banner — is the same panel, with two differences worth knowing. Its dismissal reads Cancel rather than Not now, because this time you asked for it; and in place of the "closing keeps this" line its foot carries the date of the last pull, here Catalog last pulled: Sep 8, 2026.
While the write is out the panel stays and says so. Apply is replaced by the words Applying…, the dismissal disappears — there is nothing left to cancel once the write has gone — and the banner over the estimate reads Applying catalog updates…
When it lands the panel closes by itself, and the banner becomes one sentence:
Catalog applied to this session — press Save to keep it.
Read that sentence literally, because it is the whole shape of this control: Apply changes the estimate you are looking at, and saving the project is what keeps the change.
The notice is discharged. The mark on Calculate goes, and so does the Catalog changed chip beside the project — there is nothing left to review.
The money did not move, and the panel had said it would not. Both figures at the top of the panel read — on this job, and the Total tab prints the same numbers on both sides of the press:
| the Total tab | before Apply | after Apply |
|---|---|---|
| Total cost | $275,046.34 | $275,046.34 |
| Client price | $283,741.10 | $283,741.10 |
| Payment workers | $64,390.84 | $64,390.84 |
| Hours | 2,088.31 | 2,088.31 |
| Materials (net) | $202,173.06 | $202,173.06 |
| Equipment (net) | $482.44 | $482.44 |
Total cost
before Apply
$275,046.34
after Apply
$275,046.34
Client price
before Apply
$283,741.10
after Apply
$283,741.10
Payment workers
before Apply
$64,390.84
after Apply
$64,390.84
Hours
before Apply
2,088.31
after Apply
2,088.31
Materials (net)
before Apply
$202,173.06
after Apply
$202,173.06
Equipment (net)
before Apply
$482.44
after Apply
$482.44
That is what "Your prices are unchanged" means when the changes on offer are renamings and consumption figures: the job takes the catalog's new words and new quantities, and the money you agreed stays where it was. When a change IS worth money the panel prices it in its own table first — that is the point of reading the deltas before you press.
Every work the press touched is marked. On Details, a changed work carries an Updated chip beside its name, so you can see what moved without comparing two estimates.
And until the project is saved, the job is not. Open it again without keeping the change and the panel is waiting, with the same works on it and the mark back on Calculate.
Four things to know before you press it
It moves norms and quantities, not your prices. The panel says so above its own table, and the job's totals bear it out.
It does not cover every kind of catalog change, and it states its own scope at the foot: "Applies norms and material consumptions. Not applied: 13 added, 35 switched additional works on 5 works — set those on the element." Additional works a catalog entry has gained, and defaults that have been switched on or off, are yours to set on the element itself — because applying them would overwrite choices you made there.
A work somebody else is holding is not changed. A delegated row names its holder and the panel says what to do about it: ask for the work back, or withdraw the subcontract it is on.
Nothing is kept until the project is saved. This chapter stops at the press; saving a project and what a saved version carries are chapter 34.
Your own norm really does reach the job — followed there and back
The panel above reports every kind of catalog drift at once, so seeing your own override in it takes a controlled measurement rather than a glance. One was made on 8 September 2026, on one work the project actually uses — Common rafter installation — with everything else left alone.
| what was set on Rates & Works | the panel's row for that work | the job's TOTAL delta |
|---|---|---|
| nothing — YOUR NORM reads — | 0.08 → 0.09 h/1 LF · +$292.09 | +$7,650.03 |
| YOUR NORM = 0.9 | 0.08 → 0.90 h/1 LF · +$15,802.15 | +$31,845.23 |
| the override cleared again | 0.08 → 0.09 h/1 LF · +$292.09 | +$7,650.03 |
nothing — YOUR NORM reads —
the panel's row for that work
0.08 → 0.09 h/1 LF · +$292.09
the job's TOTAL delta
+$7,650.03
YOUR NORM = 0.9
the panel's row for that work
0.08 → 0.90 h/1 LF · +$15,802.15
the job's TOTAL delta
+$31,845.23
the override cleared again
the panel's row for that work
0.08 → 0.09 h/1 LF · +$292.09
the job's TOTAL delta
+$7,650.03
The "NOW" half of that row is the number typed into YOUR NORM, the cost impact moves with it, and the whole job's total moves with that. Clearing the override put all three figures back exactly where they started, to the cent.
Note what 0.9 means here, because it is the whole reason that middle row is so large. The cell is hours for one linear foot, and the catalog's own figure for this work is 0.09144. So 0.9 is not a small adjustment — it is very nearly ten times the catalog norm, and the job's labour goes from 2,585.03 h to 3,945.93 h to match. The number you type is always hours for one of the unit printed beside it.
So the answer to "does my change reach the job I already drew?" is: it is offered to that job, priced, and it waits for you. New jobs pick the change up as normal, and until you press Apply the job you already quoted is untouched.
And this is how to read OUR NORM against a job you already drew
The panel prints two figures per work: the norm the job is carrying, and the norm the product would apply. Put the Rates & Works page beside them, on the same company:
| work | the job is carrying | the product would apply | Rates & Works prints |
|---|---|---|---|
| Common rafter installation | 0.08 h/LF | 0.09 h/LF | 0.09144 h/LF |
| Full roof sheathing — boards / OSB / plywood | 0.04 h/SF | 0.03 h/SF | 0.02508 h/SF |
| Porch ceiling | 0.09 h/SF | 0.06 h/SF | 0.05574 h/SF |
Common rafter installation
the job is carrying
0.08 h/LF
the product would apply
0.09 h/LF
Rates & Works prints
0.09144 h/LF
Full roof sheathing — boards / OSB / plywood
the job is carrying
0.04 h/SF
the product would apply
0.03 h/SF
Rates & Works prints
0.02508 h/SF
Porch ceiling
the job is carrying
0.09 h/SF
the product would apply
0.06 h/SF
Rates & Works prints
0.05574 h/SF
The catalog page agrees with the figure the product would apply, on all three — the panel rounds to two decimals where the catalog page prints the figure in full, and 0.09144, 0.02508 and 0.05574 are 0.09, 0.03 and 0.06 rounded. That is what the column is for: it tells you what a NEW job will use. Where a job you drew earlier is carrying something older, the Catalog updates panel is the place that says so and offers you the change — the page itself always speaks for the catalog as it stands today.
Who is allowed to change this
Your company catalog is your company's economics, and DrawToBid treats it that way. There are three kinds of membership, and they get three different answers. All three were signed in and driven on 4 September 2026.
The owner
Everything above. The owner is the only person who can write anything on either page.
What an owner may change, and what an owner may not. You may set YOUR NORM and YOUR RATE on any work in the catalog, add materials of your own with your prices and your consumption figures, and create works of your own — from scratch or copied from a catalog work. You may not change a catalog work itself: its name, its unit, its OUR NORM and its OUR RATE are DrawToBid's and are the same for everybody. Nothing you do here is visible to another company, and nothing you do here changes the shipped catalog for anybody. The word for what you are building is an overlay: the catalog underneath is untouched, and if you clear every override you set, you are back to exactly what you started with.
A foreman
A foreman reads the whole thing and changes none of it. Signed in as a foreman, on the same two pages:
the table has six columns instead of seven — the buttons column is not drawn at all, so there is no Copy on any row (counted: zero);
Add work and Add material are absent, not greyed out;
the YOUR NORM and YOUR RATE cells still show their values, and cannot be edited;
there is no Delete on any material row;
everything else — both tabs, the search, the pager, both tables — is identical.
That is deliberate. A foreman plans work against these numbers and needs to see them; deciding what the company pays is not their job.
A client guest
A client guest cannot reach these pages at all. Signing in as one and going to the catalog address directly produced a card and nothing else — no rail, no table, no heading:
No access to this company You don't have an active invitation to this company workspace. Back to editor
Not an empty table, not a broken page — a plain refusal with a way out. A worker's account gets the same card, which chapter 14 shows.
What the two OUR columns hold
OUR NORM and OUR RATE report the market your company works in. That is the same market a project prices against, so the norm on this page is the norm a new job will use.
What the table reads
113 works, page by page, from the owner's seat, re-read on 8 September 2026. The OUR RATE column carries twelve distinct figures across the 113 rows, and not defined on the rest. Sixteen works carry a US suggested labour rate, and each prints its figure:
| work | OUR RATE, as the cell prints it |
|---|---|
| Window installation | $75/EA |
| Clinker brick facade cladding | $27/per 1,000 brick (~$0.55/brick, single-wythe) |
| Load-bearing wall masonry from solid ceramic bricks | $27/per 1,000 brick (~$0.55/brick) |
| Foundation wall masonry from concrete blocks | $24/per block (~$2/block) |
| Load-bearing wall masonry from modern blocks (aerated concrete / hollow ceramic / silicate) | $24/per block |
| Partition wall masonry from hollow ceramic bricks | $24/per block |
| Partition wall masonry from AAC blocks | $24/per block |
| Floor ceramic / gres tiling | $2.229675/SF |
| Metal roof tile covering installation | $7.5/square = 100 sqft (~$70/sq) |
| Vinyl siding | $5.9/square = 100 sqft (~$57/sq) |
| Bitumen shingle covering installation | $4.85/square = 100 sqft ($45/sq) |
| Laminate / LVT panel flooring | $0.752515/SF |
| Gypsum skim coat (smooth finish) | $0.50168/SF |
| Machine-applied gypsum interior plaster | $0.50168/SF |
| Single-plated gypsum board partition on steel frame | $0.50168/SF |
| Interior wall painting (acrylic / latex) | $0.27871/SF |
Window installation
OUR RATE, as the cell prints it
$75/EA
Clinker brick facade cladding
OUR RATE, as the cell prints it
$27/per 1,000 brick (~$0.55/brick, single-wythe)
Load-bearing wall masonry from solid ceramic bricks
OUR RATE, as the cell prints it
$27/per 1,000 brick (~$0.55/brick)
Foundation wall masonry from concrete blocks
OUR RATE, as the cell prints it
$24/per block (~$2/block)
Load-bearing wall masonry from modern blocks (aerated concrete / hollow ceramic / silicate)
OUR RATE, as the cell prints it
$24/per block
Partition wall masonry from hollow ceramic bricks
OUR RATE, as the cell prints it
$24/per block
Partition wall masonry from AAC blocks
OUR RATE, as the cell prints it
$24/per block
Floor ceramic / gres tiling
OUR RATE, as the cell prints it
$2.229675/SF
Metal roof tile covering installation
OUR RATE, as the cell prints it
$7.5/square = 100 sqft (~$70/sq)
Vinyl siding
OUR RATE, as the cell prints it
$5.9/square = 100 sqft (~$57/sq)
Bitumen shingle covering installation
OUR RATE, as the cell prints it
$4.85/square = 100 sqft ($45/sq)
Laminate / LVT panel flooring
OUR RATE, as the cell prints it
$0.752515/SF
Gypsum skim coat (smooth finish)
OUR RATE, as the cell prints it
$0.50168/SF
Machine-applied gypsum interior plaster
OUR RATE, as the cell prints it
$0.50168/SF
Single-plated gypsum board partition on steel frame
OUR RATE, as the cell prints it
$0.50168/SF
Interior wall painting (acrylic / latex)
OUR RATE, as the cell prints it
$0.27871/SF
The other 97 rows read not defined, and that is the honest answer. The catalog carries a suggested rate only where there was real backing for it and never invents one, so most works have none. A blank here means "we have no figure to suggest — set YOUR RATE".
Some rates are quoted in the market's own unit rather than the work's. Foundation wall masonry reads $24/per block, Clinker brick facade cladding reads $27/per 1,000 brick, roof coverings read per square = 100 sqft. That is how the trade quotes them; the unit is written into the cell so the figure cannot be mistaken for a rate per unit of the work. Those nine read the same whatever the work is measured in — a rate quoted per block is not a rate per square foot, so nothing about it is stated per the work's unit.
OUR NORM is the market norm. The three works measured against a running job in the section above print 0.3, 0.27 and 0.6 h — the figures the product applies.
What a foreman sees
The same table, the same norms, and no rates at all: every OUR RATE and YOUR RATE cell reads not defined or — on that seat, whatever the catalog holds — counted across all 113 rows, not one carries a figure. Rates are money, and money is the owner's. Norms are hours, and a foreman planning a crew's week needs them — so Window installation reads 0.7 h/EA on that seat exactly as it does for the owner.
What this chapter does not cover yet
So that you know what you are not being told:
Pressing Apply on the Catalog updates panel, and what the estimate looks like afterwards. The panel itself was driven, read in full and is described above; the button was not pressed.
Editing a company work after it exists. Creating one was driven; opening it again to change it was not.
Deleting a company work that a project is already using, and what the product says if you try.
Overriding how much of a material a catalog work consumes. Neither of these two pages offers it.
The furniture these pages are built out of — a picker that closes on Escape, a greyed control, a hover text, a form that holds its submit — Chapter 25.