Chapter 5
Read the estimate
The estimate is not a separate document you fill in. It is what the building you drew costs, and it recalculates from the model. You never type a quantity into it.
This chapter was driven on the running product — the seat table below on five seats in one sitting, and the Total tab on a house-sized job. Every picture in it was taken on that walk, and each frame outlines the control its own paragraph is about.
Press Calculate
Press Calculate in the toolbar at the top of the editor.
It is on every seat that has an editor at all: five seats were signed into on one afternoon and every one of them had a Calculate button in front of it. But it does not sit in the same place on any two of them, and it does not open the same thing. Find it by its label rather than by what is beside it — on three of the five seats there is no Share button, and on two there is no messages icon.
| the seat | immediately left of Calculate | immediately right | what the panel gives you |
|---|---|---|---|
| the builder who owns the company | the small Manage access icon | messages | eight tabs, and a Save changes button |
| a foreman in that company | Share | notifications | two tabs — Total and Labor — and the heading ends "(cost detail hidden)" |
| a subcontractor on the job | the 3D switch | messages | seven tabs (no Subcontractors), headed "Your works on …", with Save changes |
| the customer paying for it | the 3D switch | messages | four tabs — Total, Progress billing, Labor, Materials — with Save changes |
| an account with no company yet | Share | notifications | five tabs; with a subscription, Save changes once a price is entered (no Save changes on a free account) |
the builder who owns the company
immediately left of Calculate
the small Manage access icon
immediately right
messages
what the panel gives you
eight tabs, and a Save changes button
a foreman in that company
immediately left of Calculate
Share
immediately right
notifications
what the panel gives you
two tabs — Total and Labor — and the heading ends "(cost detail hidden)"
a subcontractor on the job
immediately left of Calculate
the 3D switch
immediately right
messages
what the panel gives you
seven tabs (no Subcontractors), headed "Your works on …", with Save changes
the customer paying for it
immediately left of Calculate
the 3D switch
immediately right
messages
what the panel gives you
four tabs — Total, Progress billing, Labor, Materials — with Save changes
an account with no company yet
immediately left of Calculate
Share
immediately right
notifications
what the panel gives you
five tabs; with a subscription, Save changes once a price is entered (no Save changes on a free account)
What opens
A large panel headed Cost estimate, followed by a dot and the name of whatever is currently selected in your scene. If you have the whole project selected you get the project's name; select one building and the heading names that building instead — driven: with a building selected the heading read Cost estimate · [the building]. That is what "scope" means here — the estimate is showing you the part you have selected, not always the whole job.
Across the top of the panel is a row of tabs. As the owner of a company project you get eight, in this order:
Total · Progress billing · By party · Subcontractors · Labor · Details · Materials · Equipment
Counted on an owner's own project: eight, in that order.
You will see fewer than eight whenever the seat is not the owner's, and none of it is a fault:
On a project with no company behind it — a scene you are drawing before you have set a company up — you get five: Total · Labor · Details · Materials · Equipment. Driven, and it is exactly those five. There are no other parties involved, so there is nothing to divide by party or to subcontract. If you have a subscription, a price you enter there is kept in this browser until you save: a reload keeps it, Save changes counts the prices waiting, and the status bar names how many are not saved. Pressing Save changes (or Save) creates your workspace, saves the project into it and takes the prices, the tax and the markups with it.
When someone else is looking at your project, the set is narrower and the heading tells you which kind of "narrower" you are in. The table above has the counts. None of the five seats above said *"(view only)", so do not treat that phrase as the mark of somebody else's seat: a foreman's heading says "(cost detail hidden)", a subcontractor's says "Your works on"* and names the job, and a customer's says nothing extra at all. Chapter 6 covers what a client sees through a share link — that is the seat whose heading carries "(view only)", and it is a different road again.
Close the panel with the X in its corner, or press Escape.
Read the Total tab
Total is where the panel opens, and it is the tab you will spend most of your time on.
The three figures across the top
| COST | what the job costs you — labour, materials, equipment and any subcontracted work added together |
| CLIENT PRICE | what you are asking the client to pay |
| MARGIN | the gap between the two, as a percentage of the client price |
COST
what the job costs you — labour, materials, equipment and any subcontracted work added together
CLIENT PRICE
what you are asking the client to pay
MARGIN
the gap between the two, as a percentage of the client price
A real reading from a house-sized project looks like this: COST $287,487.45 · CLIENT PRICE $302,900.41 · MARGIN 5.09%.
Read the shape of it, not the figures — the same three boxes on the same job carried different numbers a day earlier, because they move with the job. Yours will carry your own.
Your client never sees the first or the third of those. Cost and margin are yours. What crosses to a client is the client price, and Chapter 6 shows that boundary being drawn.
"BEFORE YOU COMMIT"
Directly under the figures is a short block of warnings. This is the part of the screen that stops you sending a quote you will regret. On the same project it read:
93 of 95 materials not priced yet · 98% — Price them → $191,422.63 of contractor materials not yet purchased
Read those literally. DrawToBid's catalog ships no prices — it carries the labour norms and the material quantities, and the money is yours to enter, because your supplier's prices are not ours to guess. Until you price a material, it contributes nothing to the total, and this block is telling you how much of your estimate is still air. Price them → takes you to the materials.
Building area
There is a row reading Building area, whose box is placeheld Not set until you fill it, with a suggestion beside it and a USE button — read on this job: suggested 2,568.99 ft². DrawToBid measures the building it can see and offers you the number; pressing USE adopts it. This is what per-square-foot figures divide by — pressing USE is what makes them appear at all, and 35 — The calculation follows that press row by row.
The breakdown
Below that, the estimate is laid out line by line:
Payment workers — the labour money.
Demolition labor — only when something in the project is marked Demolish, and only beside other costs: the labour of taking it down.
Hours — the labour hours behind it.
Haul-off — only when something is marked Demolish: the weight and loose volume of what comes off, in tons and cubic yards.
Materials (net) and Equipment (net).
One line per subcontracted package, marked (bought-in), with what you agreed to pay for it — for example [the subcontractor] (bought-in) lump sum $8,000.
Your markup and tax layers, each with its own percentage. On a company project these are gathered into one collapsed row — Overhead, tax & markup (14.8%) +$42,529.27 — with an arrow that opens it up into the individual layers.
Client price, on the last row, and this one is a box you can type in. It holds the computed figure, and typing over it sets the price you are asking for directly.
The markup row is the one with the arrow on it:
And the last row is a real box rather than a printed figure:
All the percentages line up in one right-aligned column so you can read down them.
On a project with work marked Demolish the two extra rows sit in that list — here Demolition labor $1,991.74 under Payment workers, and Haul-off 6.64 tons · 18.7 CY loose under Hours. Chapter 35 takes them apart.
If you have not set any markup up yet, this section says so in plain words instead of showing you zeroes: "No markup or tax layers configured — set them in Company Settings › Estimate / Markup."
Ask the client to approve
At the foot of the Total tab is a block headed CUSTOMER APPROVAL:
Send the client price to your customer their email for sign-off. Once approved it is locked.
It shows a state — DRAFT to begin with — the price you are asking them to approve, and two buttons, Request approval and History.
Request approval needs a customer on the project. If nobody has been invited yet, the block tells you so — read on a project made minutes earlier with nobody on it: "No customer on this project to approve — invite a customer to request approval." On a project that does have one, the two buttons are there instead. Chapter 22 is how you put a customer on a project.
"WHAT YOU ALSO APPROVE"
If your estimate contains an allowance — a price that is not settled yet and may move — it is disclosed here, above the signature, rather than buried in the detail. On the same project:
1 allowance in this price. This rate can change until the first payment application. Smart vapor retarder, Class II (variable-perm) — ALLOWANCE — Material — NOW IN THE ESTIMATE $116,594.67 · ~3,886.489 SF · $30/SF
The material's own amount sits in a box on that line, so you can set what the allowance is worth without leaving the tab. The quantity carries a ~ because it is rounded for display.
This exists so that the thing which may change is said before the client signs, not afterwards.
The other tabs
Labor — the working table: every work in the project, its quantity, its rate and its line total. This is also where work is assigned to your people and your subcontractors. Work marked Demolish is filed first, in its own Demolition group, each row named for taking it down — Asphalt shingle tear-off, Window removal.
Details — the same content laid out for reading, with a Joined / Detailed switch and an option to fold materials and equipment into the rows.
Materials — every material the project needs, and where you enter what you are actually paying for it.
Equipment — the machine time the works call for.
By party — the same money split by who is doing the work.
Subcontractors — packages you have put out to subcontractors. It carries a small yellow number when tenders are waiting for you to award them.
Progress billing — billing the client for work completed so far.
Each of those deserves its own chapter and does not have one yet.
Press Save changes
The estimate does not save as you type. Every money edit, every assignment, every change you make anywhere in this panel collects into one batch, and one button in the panel's header commits the lot: Save changes, with a number beside it counting what is waiting.
With nothing waiting the button is greyed and carries no number, which is how you can tell at a glance that everything you have done is already in. Tabs that are holding unsaved changes carry a dot on their label, so you can find what you have touched. If you try to close the panel or navigate away with changes waiting, DrawToBid stops you and asks.
If you are only reading, the Save changes button is not there at all.
Export the estimate's items for QuickBooks
If your books are in QuickBooks Online, you do not have to type the estimate's lines into it one by one. DrawToBid saves them as a products and services list, the file QuickBooks Online imports, and you then build the estimate in QuickBooks from those items.
Press Calculate and stay on the Total tab. At the foot of the column there are three controls in a row: Download estimate PDF, Download estimate CSV and Export items for QuickBooks. The line under them names the QuickBooks menu the file goes into.
Press Export items for QuickBooks. Your browser saves a file named after the project and the day, ending in
-quickbooks-items.csv. It holds one row per item of the estimate:Name — the item's name, kept to what QuickBooks accepts in a name;
Type —
Servicefor a work and for a machine,Non-inventoryfor a material;Sales Description — the name exactly as the estimate prints it, with its unit, such as
Interior wall painting (per SF);Purchase Cost — the cost of one unit, as the estimate shows it. It is empty where the estimate shows none: a material you have not priced yet, or a work whose row shows no cost per unit.
The same work used in several places is one item. The file carries no quantities: a QuickBooks products and services list holds items, and you enter the quantities when you write the estimate in QuickBooks. It carries no selling price either, because the estimate's client price is one figure for the whole job, not a price per line.
Import it in QuickBooks Online. Intuit's menu is Settings (the gear) > Import data > Products and Services. Choose the file, check that QuickBooks has matched the four columns to its own fields, review the rows, and import. Intuit notes that an import cannot be undone, and that purchase costs are imported on QuickBooks Online Plus and above; on the other plans the names, types and descriptions come in.
QuickBooks imports fewer than 1,000 rows at a time, so an estimate with more than 998 items is saved as several numbered files; import each of them.
Everyone who reads the estimate gets their own file. It is made from what that person's own estimate shows, never more: a person who sees no money gets a file with no Purchase Cost column.
Check the catalog line
Above the tabs there is a line about the catalog, with a Review & apply button at its right end. It names one clause per kind of drift, so you can see what sort of change is waiting before you open it:
Catalog updated — 19 works changed, 5 new works in the catalog, 11 entries moved or renamed. · Review & apply
The clauses are not added up into a single number on purpose: three of the four kinds move no money at all, and a total would hide which sort you are looking at. On a project nothing has moved under, the line says so in words instead of printing zeroes:
Catalog checked — nothing in this project changed.
Your project holds its own copy of the works it uses, so improvements we make to the catalog do not silently rewrite a job you have already quoted. This line tells you whether anything has moved underneath it, and Review & apply is where you decide whether to take the change.