The DrawToBid manualSearch the manual

Chapter 30

What things are made of

Every work in DrawToBid's catalog arrives with the materials it is built from already chosen for you. A timber-frame wall knows it needs studs, sheathing, insulation, a vapour barrier, fixings and tape; a foundation slab knows it needs concrete, reinforcement and a membrane. You do not have to assemble a wall out of parts — you choose the wall.

But the choices inside it are yours, and this chapter is about the window where you make them: what it holds, how the materials in it are grouped, what changing one actually does, and the block underneath that decides how a material is drawn rather than what it costs.

Everything here was pressed on the running product on 4 September 2026. Where a control did something, what it did is a reading off the screen; where one did not, that is said in those words. The counts are a fresh census of the whole catalog — every one of its works was chosen in turn and its panel read.

Read 25 — The controls that repeat first if you have not: this chapter leans on it for how a window closes, what a greyed control means and how a measurement field behaves, and does not describe those again.


Open the window

There are two doors into the same window, and they are asking different questions.

Before you place anything

Before you place anything. Choose a work in the works tree and the parameters panel opens with MATERIAL as its first row. Beside the material's name is Change. This is the door chapter 4 walks, and what you choose here applies to what you place next.

After you have placed something

After you have placed something. Select the element and open the Material tab beside Geometry. It opens with the same MATERIAL row and the same Change — and what you choose here applies to the element in front of you. Chapter 29 is that tab's other blocks.

The name is a door too

The material's name is a door too. The name beside the row is itself a button, and pressing it opens exactly the same window as Change does. If you have ever pressed the name of a material expecting something to happen: it did.


Read the window

A window opens over a dimmed screen, headed Construction material, with two tabs:

Materials · Additional works · 6

The number beside the second tab is a count and it varies by work — 6 on the timber-frame wall, 14 on the entry door.

The whole bill of materials

The Materials tab is not a list of things you might use. It is the work's whole bill of materials, every material the work consumes, grouped, with the ones you may choose between marked as such. On the timber-frame wall it holds seventeen materials in seven groups — and the work's own card in the panel behind says 17 materials. The number on the card is the number of rows in this window; they are the same count of the same thing.

What a card prints

Each group is a band across the window with its name in small capitals on the left and its rule in small capitals on the right. Under it, the materials sit as cards in a row:

  • a swatch at the top — for many materials this is the actual surface, and OSB sheathing looks like OSB. Where a material has no picture the card shows a crossed-out image mark instead, which is not an error;

  • the material's name;

  • how much of it one unit of the work consumes, and the waste allowed on top — 1.2375 LF · +10% waste, 1.05 SF · +10% waste, 0.041 lb · +5% waste. That is the number your estimate multiplies by. It is not a price and you did not set it. Some materials carry a quantity and no waste line at all — the doors are counted 1 EA with nothing added;

  • a price row, which is the next section.

The card in force

The card that is in force is outlined. One per choosable group, and you can see at a glance what your wall is currently made of without pressing anything.

The ways out

The ways out are the three chapter 25 describes: an × in the top corner, Close at the foot beside Select, and Escape, which closed it every time it was tried. Close and the × leave everything as it was.


The two rules

Every group carries one of two rules, and the difference is the most useful thing on this screen.

CHOOSE ONE

CHOOSE ONE means the materials in that group are alternatives to each other, and exactly one of them is in your building. These are the cards you can press.

ALL APPLIED

ALL APPLIED means the opposite: every material in that group is used, together, and there is nothing to decide. Those cards are not buttons — that was measured rather than assumed. Of the seventeen materials on the timber-frame wall, thirteen can be pressed, and they are exactly the members of the CHOOSE ONE groups.

Each ALL APPLIED material carries a ticked box at the head of its name, and the tick does not take a press. It is there to tell you the material is in the work; it was pressed on the running product and nothing moved, because the box is ticked and disabled. Read it as a statement, not as a control you have failed to operate.

The wall's seven groups

The timber-frame wall's own seven groups, as the window prints them:

STRUCTURAL TIMBER

its rule

CHOOSE ONE

what is in it

Structural timber C24 2×6 (studs + plates) · Structural timber C24 2×8 (energy-efficient) · Framing lumber SPF/DF-L #2 2×4

TIMBER BOARDS

its rule

CHOOSE ONE

what is in it

OSB/3 sheathing 0.5″ · OSB 7/16″ wall sheathing

THERMAL INSULATION

its rule

CHOOSE ONE

what is in it

Mineral wool 6″ (between studs) · Glass wool λ0.032 11.75″ · PIR board λ0.022 6″ · Fiberglass batt insulation R-21 · Dense-pack cellulose insulation · Closed-cell spray foam (ccSPF) · Open-cell spray foam (ocSPF)

DAMP-PROOF MEMBRANES

its rule

CHOOSE ONE

what is in it

Vapour barrier PE 8 mil (internal) · Smart vapor retarder, Class II (variable-perm)

DAMP-PROOF MEMBRANES

its rule

ALL APPLIED

what is in it

Wind barrier membrane (vapour-open)

FASTENERS

its rule

ALL APPLIED

what is in it

Nails, screws & timber connectors

SEALING TAPES & JOINTS

its rule

ALL APPLIED

what is in it

Sealing tape (vapour barrier laps)

One name, two rules

A group name can appear twice with two different rules, and that is deliberate rather than a duplicate. DAMP-PROOF MEMBRANES is listed once as a choice — the internal vapour barrier, where there are two ways to do it — and once as something always applied, the external wind barrier. They are both damp-proof membranes and they answer different questions. Read the rule, not the name.

How many groups a work has

Seven groups is a lot, and most works have far fewer. Across all 76 windows that open, 73 carry exactly one CHOOSE ONE group, one carries two, and two carry four — the timber-frame wall being one of the two. The ALL APPLIED side varies more: seven windows carry none at all, forty-four carry one, nine carry two, fourteen carry three and two carry four.


The price box

Every card carries a price row — PRICE $ [ 0 ] / LF, / SF, / EA, / lb, / gal — the unit that material is bought in.

DrawToBid's catalog carries no prices at all. Not reference prices, not typical prices, not starter values. Every box on this window reads 0 on every material of every work, and that is the shipped state rather than an oversight: the catalog carries norms — how much of a thing a job consumes — and a norm is a quantity, not money.

So this box is your own entry, against one material, on one project. Nothing forces you to fill it in, nothing is looked up when you do, and what you type is not shared with anyone else's job. There is no supplier list behind it and no price book to import from.

Every price you see and every price you enter is in US dollars. There is no currency setting anywhere in DrawToBid — not on this window, not on your account, not on a project.


The Additional works tab

The second tab is a different kind of thing altogether.

It lists the works that come with this work — the jobs you would forget. For the timber-frame wall there are six, and each is printed with its own labour norm:

Fire / biocidal protection of timber structure — 0.0093 h / SF Skim coating — gypsum finish — 0.0465 h / SF

and each of them carries its own material groups, under the same two rules:

IMPREGNANTS · ALL APPLIED — Fire-retardant / biocidal impregnant 0.0049 gal PLASTERS · CHOOSE ONE — Dry gypsum skim compound 0.4096 lb · +15% waste · Ready-mix polymer skim compound 0.6144 lb · +10% waste PRIMERS · ALL APPLIED — Deep-penetrating primer

The figure beside an additional work is hours per unit, not money — h / SF — and it is the labour the work adds. One card in this tab also carries a COLOR control beside its price, which the Materials tab has nowhere.


Change a material

This was driven end to end on a wall already standing in the building, and every value below was read off the screen before and after.

Two things worth taking from that.

The geometry does not move

Changing a material does not change the geometry. The wall is the same size afterwards; what changed is what it is made of. The measured quantities on this tab describe the shape you drew, and choosing a different board does not move them.

Only that group moves

Only the group you chose in moves. The structural timber, the insulation and the membrane were all still whatever they had been. A choice is confined to its own group.

One material, not the wall

The name on the MATERIAL row is one material, not the whole wall. This is worth stating plainly because it produces a surprise otherwise. A timber-frame wall is built from seventeen materials; the row names the one the shape is drawn from. Change the insulation and the row will not move at all — and nothing has gone wrong. That was driven deliberately: an alternative was chosen in STRUCTURAL TIMBER, Select pressed, and the MATERIAL row correctly went on reading the board it had always named. The window behind Change is where the other sixteen live.


The TEXTURE block

On the elements that have it — a polygon does, a wall does not, and chapter 29 carries that table — TEXTURE sits under the measured lines and holds seven fields. They are about how the material is drawn on the model: nothing in this block reaches the estimate, and driving all seven and reading the tab afterwards left every measured quantity byte-identical.

3D Size

what it reads when you place something

1

Repeat X · Repeat Y

what it reads when you place something

1 · 1

Top Offset X · Top Offset Y

what it reads when you place something

0 · 0

Side Offset X · Side Offset Y

what it reads when you place something

0 · 0

3D Size and the two repeats change how the surface looks. Each was set to 8 on a placed foundation slab with the camera looking straight down at it, and the drawing changed each time — the material is tiled more finely across the face. Set them back and the surface returns.

They are ordinary number fields: type a value, press Enter, and the model redraws. The four offsets are the last four rows of the block above — the table names them, and they sit in the same grid as the size and the two repeats.


When there is nothing to change

Not every work offers a Change link, and where it is absent the material named is the one you get. Per chapter 25 that is a different message from a greyed control: there is no condition to meet, and nothing you can do on this screen will make the link appear.

Seventy-six of the hundred and eight works offer it; thirty-two do not. Every one of the 108 was chosen in turn on 4 September 2026 and its panel read, so this is a count of the catalog rather than an impression of it. It is the catalog on the job this census was driven on — the same one chapter 27 maps, group by group. A project started fresh today carries a different catalog with different counts, and chapter 27 says which is which.

What decides it

Two natural guesses are both wrong, and they are worth killing because you will otherwise make them yourself.

Not the material

It is not the material. The same material answers differently in different works, and the census names the two that do it. Ready-mix concrete C20/25 is named by four works: the foundation slab, the strip foundation and the pad foundations all offer Change, and the reinforced concrete ring beam does not. C24 structural timber is named by six: the double top plate and both decorative timber members offer it; the roof wall plate, the roof main skeleton and the common rafter do not.

Not the number of materials

It is not how many materials the work uses. The work card's material count runs from 1 to 62, and every count from 2 to 6 appears on both sides — there are works with six materials that offer the link and works with six that do not. Above six, every work in this catalog happens to offer it, but that is a fact about this catalog, not a rule you can rely on: the longest bill with no link is six materials, and the shortest with one is two.

Not the shape

It is not the shape either. Fifty of the works offer more than one shape on the tool rail — a wall can be placed as a Wall, a Wall Box or a Gable — and the answer does not follow the shape. The link belongs to the work, not to the figure you draw it as.

It is the bill

What it does track is whether the work's own bill contains a group of alternatives. All seventy-six windows that opened carried at least one CHOOSE ONE group — seventy-three carried exactly one, one carried two, and two carried four. Not one of them opened with nothing to choose between. So the link is about the work's bill, not about the material named on the row and not about how long the bill is: where the bill offers a genuine alternative, the link is there.

What could not be checked

What could not be checked, said plainly: on a work with no link there is no window to open, so this walk could not look inside those thirty-two bills and confirm they contain no alternatives. The sentence above is a regularity measured across the works that do open, not a rule read out of the product.

The thirty-two

They are concentrated: twenty of the thirty-two are roof and wall works.

Foundations

the works with no Change link

Sand sub-base

Walls

the works with no Change link

Load-bearing wall masonry from solid ceramic bricks · ICF wall (insulated concrete form) · Gypsum board partition on wood studs · Double-plated gypsum board partition on steel frame · Single-plated gypsum board partition on steel frame · Partition wall masonry from AAC blocks · Partition wall masonry from hollow ceramic bricks · Solid gypsum block partition wall · Reinforced concrete ring beam

Exterior finishing

the works with no Change link

External cement-lime plaster (traditional) · Exterior skim coat (facade leveling) · Clinker brick facade cladding

Columns

the works with no Change link

Brick column masonry

Interior finishing

the works with no Change link

Cement-lime interior plaster

Floors

the works with no Change link

Carpet flooring

Ceilings

the works with no Change link

Single-level GK suspended ceiling · Two-level plasterboard suspended ceiling — cross-braced framing

Floor slabs

the works with no Change link

Monolithic reinforced concrete slab 15-18 cm · Prefab beam-block slab Teriva / Smart

Stairs

the works with no Change link

Wood stair, site-built

Roof

the works with no Change link

Bitumen shingle ridge cap installation — horizontal + hip ridges · Bitumen shingle valley lining (ice-and-water) · Fascia / barge board installation · Pitch transition lining (slope break, ice-and-water) · Roof wall plate on RC ring beam · Roof main skeleton: posts + ridge + hip + valley rafters · Common rafter installation · Girder truss · Valley tray installation · Ridge cap installation — horizontal + hip ridges · Counter-batten + batten

On these works you cannot see the bill at all. The work card tells you the job uses, say, six materials; the panel names one of them; and there is no control on this screen that shows you the other five. That is worth knowing before you plan around a work in this list — the quantities are in your estimate, but this screen will not show you what they are.


Whose window this is

Everything above is the owner's seat. Only the owner of a project may edit it, so on any other seat this window is a thing you can read rather than a thing you can use.

A foreman's seat

A person who is in the company but does not own the project — a foreman, say — reaches the project and the same Material tab, with the same material named on it. The editor tells him where he stands in one sentence: "Only the owner of a project can edit it — you have read-only access."

There is no Change link on that seat. The MATERIAL row still names what the element is made of — the foundation above reads Ready-mix concrete C20/25 — and MEASURED SIZE still gives its areas and volume, because those are facts he is entitled to. What is missing is the door: choosing an alternative is the owner's, so the link that opens the choice is not drawn at all.

Grey is not the same as absent

That is chapter 25's second case rather than its first. A control that has gone grey is waiting for a condition you can still meet; a control that is absent is telling you the action is not yours on this seat. Nothing on this tab is greyed for him — the boxes under TEXTURE are faded and do not take a value, and the link he might have pressed is simply not there to press.

With no company at all

A person with no company at all can reach this window in full. He opens the editor, presses the + at the foot of the scene column, places something, and the Change link is there beside its material like anybody else's — the window behind it opens, the groups carry their rules, and a material can be chosen. Chapter 29 walks that seat onto the drawing surface, and chapter 34 is what saving does once he is there.


Where this chapter is used

  • chapter 29 — the Material tab's other blocks;

  • chapter 27 — the catalog these bills belong to, group by group;

  • chapter 28 — what a work offers before you place it;

  • chapter 4 — the road that first reaches this window;

  • chapter 25 — how this window closes, and what a greyed control means;

  • chapter 11 — the company's own copy of these materials.

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .