How to estimate a deck replacement from your own yard: the old deck boards placed as Demolish and the new wood or composite decking placed as Build, with its posts, rails and stairs, in the free 2D/3D editor. The deck cost calculator counts the tear-off and the new deck by the square foot, with their labor hours and the haul-off.
No sign-up needed to try
Replacing a deck is a tear-off and a build. Counting only the new boards leaves the first half out.
Deck board removal, with its haul-off; a porch column removed where it is replaced.
Wood or WPC composite decking on its substructure, posts on galvanized bases on concrete or set in concrete, the railing posts and rails, the pickets, and the stairs.
The ground under the deck graded and gravel laid.
One model holds both. Select what goes in and press Existing in the scene tree: the estimate counts the tear-off alone. Press Existing on what comes out and Build on what goes in: it counts the install alone. Every press can be undone, and the model is the same.
The old deck boards off: removal by the square foot, with its haul-off.
The new decking on its substructure, the posts, the railing and the stairs.
The catalog ships no material prices: every material stays unpriced until you type your local price. Labor hours are priced at an hourly rate you set to your crew’s.
Draw it yourself with the hand tools: every piece placed by hand is counted, and the estimate with its PDF and CSV files is yours. Free, with no sign-up.
Give it the deck’s size: it places the old boards as Demolish and the new deck as Build.
Sign in, and connect the AI app you already use (Claude, ChatGPT or any app that takes a custom connector). No plan to buy for the assistant itself. It works as you, with the same hand tools; the planners stay part of the subscription for it too. How to connect it.
The subscription for builders adds the one-click tools. No one-click tool builds a deck: by hand or with your agent is the road for this job.
Not on its own. The decking work counts the boards together with their substructure, by the square foot, so a resurface with the frame kept is counted as a whole new deck.
Wood and WPC composite decking are one work; choose the material on its card.
Yes: the posts, the rails by the foot and the pickets one by one.
No. You add your prices; the catalog ships no material prices.
No. The substructure is an allowance inside the decking work, by the square foot.
No sign-up needed to try
DrawToBid records how it is used.
We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details
You can turn this off in .
May DrawToBid measure how it is used?
With your permission we send usage data to Amplitude, our analytics supplier, to make the product better and to compare versions of a page, and a report to Better Stack, our error-tracking supplier, when a page breaks, so we can fix it. Never the contents of your work, and we never sell it. Nothing is sent until you choose, and you can change your mind at any time in Cookie preferences.