Cost to rewire a house and upgrade the panel: count the whole job

How to estimate a rewire or an electrical panel upgrade from your own house: place the new panel, the outlets, the switches and the lights room by room in the free 2D/3D editor, and the estimate counts every device, the panel and each device’s standard cable length, with the labor hours. Then count the walls and ceilings that are opened and closed again.

No sign-up needed to try

What a rewire and a panel upgrade include

A rewire is three jobs, and a quote that names only the wiring leaves two of them out.

  1. Opening up

    The old devices and the old panel come out, and the walls and ceilings are opened where the new cable has to run: a strip of drywall along a wall, a hole above each box.

  2. The new electrical work

    The new loadcenter (200A, 40 spaces) or a meter-main with its outdoor disconnect; tamper-resistant duplex and GFCI receptacles, the 20A kitchen and laundry receptacles, the range and dryer receptacles; single-pole, 3-way and dimmer switches; ceiling, recessed and wall light outlets, a ceiling fan box, the bath fan’s connection; hard-wired smoke and CO alarms; the hard-wired connections of the furnace, the AC disconnect, the water heater and the appliances.

  3. The restoration nobody quotes

    The drywall that was opened goes back: new board, taped and finished, then primer and paint on every wall and ceiling that was touched. Draw it as new gypsum board on the walls and the ceiling, and paint on top.

Two estimates from one model

One model holds both. Select what goes in and press Existing in the scene tree: the estimate counts the tear-off alone. Press Existing on what comes out and Build on what goes in: it counts the install alone. Every press can be undone, and the model is the same.

  • The tear-off estimate

    The walls and ceilings opened for the new cable: wall and ceiling drywall removal by the square foot, with its haul-off.

  • The install estimate

    The new panel, every device with its standard cable length, and the drywall and paint that close the walls again.

Variations, a few presses each

  • The panel upgrade alone: the new loadcenter or meter-main and the connections it feeds, nothing opened.
  • The panel and the rooms rewired: the devices of each room added, and its walls opened and closed.

How to estimate a rewire in the editor

  1. 1.Press the button above and the editor opens on an empty drawing, with no sign-up. Draw the rooms of the house, or open a gallery house as your own copy where its author allows it.
  2. 2.Open Electrical in the catalog. Put the panel where the service comes in, then go room by room: the switch by the door, an outlet on each wall, the light in the ceiling. Each device is a real catalog part and one more on the list.
  3. 3.Each device’s card shows the catalog’s standard cable length for that device, and the list counts that cable in feet.
  4. 4.For the walls and ceilings you open, draw new drywall where they are patched, and paint over them.
  5. 5.Press Calculate. The estimate lists the removal rows apart from the new work, each with its labor hours, and the haul-off where the catalog has it; the Materials tab lists what to buy.
  6. 6.Type your local prices on the material rows and set the hourly rate to your crew’s: the Total tab adds them up, the demolition labor apart from the new work. Export the estimate as a PDF or a CSV file.
  7. 7.Tip: it is easiest as two separate estimates from the one model. For the tear-off, select the building and press Existing, so the house stays out of the estimate, then press Demolish on what comes off. Press Calculate and download the estimate PDF.
  8. 8.For the new work, from the same model: press Existing on what came off and Build on what you put in; everything else stays Existing. Press Calculate and download its PDF.
  9. 9.Keep the model, free: File > Export JSON downloads it as a file, and File > Import opens it again later, with no subscription. Saving it in the app, in the cloud, is part of the subscription.

The catalog ships no material prices: every material stays unpriced until you type your local price. Labor hours are priced at an hourly rate you set to your crew’s.

Three ways to get the estimate

  • By hand, free

    Draw it yourself with the hand tools: every piece placed by hand is counted, and the estimate with its PDF and CSV files is yours. Free, with no sign-up.

  • With your own AI agent

    Tell it which rooms are rewired and where the panel stands: it places the devices room by room and draws the drywall that is opened, as you would.

    Sign in, and connect the AI app you already use (Claude, ChatGPT or any app that takes a custom connector). No plan to buy for the assistant itself. It works as you, with the same hand tools; the planners stay part of the subscription for it too. How to connect it.

  • With the subscription

    The subscription for builders adds the one-click tools. The electrical planner places the devices by code, groups the circuits, writes the panel schedule and routes the cable; its Build press writes the devices into the project.

    See pricing

What this estimate does not count

  • The removal of the old wiring, the old devices and the old panel.
  • Cable drawn as runs from box to box, or a length of your own: each device carries the catalog’s standard cable length.
  • Circuits, load calculations and code spacing: those are your design.
  • The utility’s side of a service upgrade, the permit and the inspection.

Questions about the cost to rewire a house

Count your own job

Lay out the new devices

No sign-up needed to try

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .

May DrawToBid measure how it is used?

With your permission we send usage data to Amplitude, our analytics supplier, to make the product better and to compare versions of a page, and a report to Better Stack, our error-tracking supplier, when a page breaks, so we can fix it. Never the contents of your work, and we never sell it. Nothing is sent until you choose, and you can change your mind at any time in Cookie preferences.

· Cookie details