One prompt. A whole house. A bid.

An AI agent designs the house and builds it in the 2D/3D editor – walls, roof, plumbing, HVAC, electrical – and ends with the estimate.

The build, in four chapters

  1. Design · 1:29

    The agent turns the prompt into a brief and a drawing set, and fixes every size.

  2. Build · 2:18

    Foundation, walls, openings and gables in one press each from that plan; the roof planner works out every slope and truss.

  3. Networks · 2:52

    Water, drains, heating and cooling, electrical, gutters – each laid out by its planner.

  4. Estimate · 1:25

    Labor hours for every trade, read from the model, at your own crew rates.

How it starts

  1. Connect your AI app to DrawToBid.

    Add the address DrawToBid gives you to your AI app as a custom connector, then sign in to DrawToBid when it asks and press Approve. How to connect it.

  2. Send one message that says what you want.

    The size, the rooms, the look. The agent writes the brief from it.

  3. Watch it draw and build, and point at anything you want changed.

    In the film, the person drew an arrow on the screen and the agent moved the gas meter (at 3:59).

Bluestem Gables, up close

The finished one-storey house from the street: blue siding, nested gables, a timber portico and a two-car garage, in the 3D view.
From the street: nested gables and a timber portico over the front door.
The HVAC ducts of the house, from the unit to every room, with the walls and roof shown see-through.
Inside: the heating and cooling ducts the HVAC planner laid out, with the house shown as a ghost.
The estimate of the house open on its Total tab, with the labor hours and the download buttons.
The estimate: 4,246 labor hours, counted from the model.

The numbers of this house

by hand, working without a break
2 days minimum
the AI agent, design and estimate
81 min

By hand, focused work only: plans from 14 hours, takeoff and estimate 8–16 hours.

sq ft, one storey
2,363
openings: doors and windows
43
roof trusses
102
networks: water, drains, HVAC, electrical, gutters
5
labor hours in the estimate
4,246

Build your own

Start your first house

The film is sped up only where the agent is thinking.

What the materials cost is yours to enter: the estimate in the film counts labor hours and labor cost.