Bathroom remodel cost calculator: demolition to tile, quantities and labor hours

How to estimate a bathroom remodel from your own bathroom: the old toilet, vanity, tub, wall tile and floor placed as Demolish, and the new fixtures, tile, drywall and drain placed as Build, in the free 2D/3D editor. The bathroom remodel cost estimator counts the demolition and the new work separately, with every quantity and labor hour.

No sign-up needed to try

What a bathroom remodel includes

The fixtures are what a remodel is chosen by. The demolition, the drywall and the tile under them are where the hours are.

  1. The demolition

    Water closet removal, lavatory and vanity removal, bathtub or shower stall removal, wall tile removal, floor tile or sheet vinyl removal, the tile substrate and the wall drywall where they come out, each with its labor hours; the tile, the floor and the drywall also with their haul-off.

  2. The new bathroom

    The rough-ins for the water closet, the lavatory and the tub or shower; the drain, waste and vent and the water lines laid by hand; new drywall on the dry walls, cement backer board and a waterproofing membrane on the tub and shower walls, a tiled shower floor pan (pre-slope, liner and mortar bed), ceramic wall tile and floor tile; the fixtures set: a water closet, a lavatory on a vanity, a bathtub or a shower stall; the bath exhaust fan, a GFCI receptacle and the lights.

  3. The restoration nobody quotes

    Paint on the ceiling and the walls above the tile, the door casing and the baseboard back, and the hallway floor patched where the doorway threshold changed.

Two estimates from one model

One model holds both. Select what goes in and press Existing in the scene tree: the estimate counts the tear-off alone. Press Existing on what comes out and Build on what goes in: it counts the install alone. Every press can be undone, and the model is the same.

  • The tear-off estimate

    The fixtures pulled, the wall tile, the floor and the drywall taken out: each removal with its labor hours, the tile, floor and drywall with their haul-off.

  • The install estimate

    The rough-ins, the drain and the water lines, the drywall, the backer board and the waterproofing at the tub or shower, the tile, the shower pan and the new fixtures.

Variations, a few presses each

  • The fixtures alone, the tile kept.
  • A tub changed for a shower.
  • Everything to the studs.

How to estimate a bathroom remodel in the editor

  1. 1.Press the button above and the editor opens on an empty drawing, with no sign-up. Draw the bathroom’s walls, or open a gallery house as your own copy where its author allows it.
  2. 2.Press Demolish on each old fixture’s card and add it, then the old wall tile and the old floor.
  3. 3.Press Build and add the new drywall, the tile, the shower pan and the new fixtures with their rough-ins; on the wall tile’s card at the tub or shower, add its cement backer board and its waterproofing membrane; lay the drain and the water lines piece by piece.
  4. 4.Add the exhaust fan, the GFCI receptacle, the light and the paint.
  5. 5.Press Calculate. The estimate lists the removal rows apart from the new work, each with its labor hours, and the haul-off where the catalog has it; the Materials tab lists what to buy.
  6. 6.Type your local prices on the material rows and set the hourly rate to your crew’s: the Total tab adds them up, the demolition labor apart from the new work. Export the estimate as a PDF or a CSV file.
  7. 7.Tip: it is easiest as two separate estimates from the one model. For the tear-off, select the building and press Existing, so the house stays out of the estimate, then press Demolish on what comes off. Press Calculate and download the estimate PDF.
  8. 8.For the new work, from the same model: press Existing on what came off and Build on what you put in; everything else stays Existing. Press Calculate and download its PDF.
  9. 9.Keep the model, free: File > Export JSON downloads it as a file, and File > Import opens it again later, with no subscription. Saving it in the app, in the cloud, is part of the subscription.

The catalog ships no material prices: every material stays unpriced until you type your local price. Labor hours are priced at an hourly rate you set to your crew’s.

Three ways to get the estimate

  • By hand, free

    Draw it yourself with the hand tools: every piece placed by hand is counted, and the estimate with its PDF and CSV files is yours. Free, with no sign-up.

  • With your own AI agent

    Tell it what stays and what goes: it places the old as Demolish and the new as Build, and lays the drain piece by piece.

    Sign in, and connect the AI app you already use (Claude, ChatGPT or any app that takes a custom connector). No plan to buy for the assistant itself. It works as you, with the same hand tools; the planners stay part of the subscription for it too. How to connect it.

  • With the subscription

    The subscription for builders adds the one-click tools. The plumbing and heating planner lays the house out by code (supply and drain sizing, venting) and its Build press writes every pipe, fitting and part into the project.

    Measured by hand: the drain, waste and vent of a 32 x 24 ft house with five fixtures took 89 pieces and 110.6 minutes (2026-11-19).

    See pricing

What this estimate does not count

  • Mirrors, accessories, shower glass and medicine cabinets.
  • The removal of the old pipes.
  • The prices of the fixtures: type the ones you choose.

Questions about the cost of a bathroom remodel

Count your own job

Count my bathroom remodel

No sign-up needed to try

DrawToBid records how it is used.

We send usage data to Amplitude, our analytics supplier, to make the product better and to test which page explains it best, and a report to Better Stack, our error-tracking supplier, when a page breaks or stops answering, so we can fix it. We also record the domain name of the site you came from, such as google.com or reddit.com, never the page address or the search words. Never the contents of your work, and we never sell it. Cookie details

You can turn this off in .

May DrawToBid measure how it is used?

With your permission we send usage data to Amplitude, our analytics supplier, to make the product better and to compare versions of a page, and a report to Better Stack, our error-tracking supplier, when a page breaks, so we can fix it. Never the contents of your work, and we never sell it. Nothing is sent until you choose, and you can change your mind at any time in Cookie preferences.

· Cookie details