Chapter 22
Let somebody onto the job
Every other chapter in this manual starts with somebody already on the project — the subcontractor quoting the work, the customer approving the price, the crew lead checking it. This chapter is about the step before all of those: the moment you put a named person on a job.
There is exactly one door, and Chapter 21 has already walked half of it. That chapter used Manage access to create a worker's seat. What is here is the other two roles — subcontractor and customer — and one question asked of each:
What does the dialog promise, what does the invitation actually confer, and what happens when you take it back while the person is using it?
The seats themselves already have chapters. A subcontractor's is Chapter 9 (and Chapter 13 for bidding); a customer's is Chapter 15. This chapter does not describe them again — it stops at the door and points.
Everything below was carried out on the running product, in the order it is written.
The door
Where it is
Manage access is on the toolbar of your own project, between the drawing and your account name.
What it says when it opens
Press it and the dialog names itself and the job:
Manage access — "DrawToBid funny home" Grant one role per person on this project.
Three ways to close it
It closes three ways and all three work: Done at the foot, the × beside the title, and the Escape key. None of them undoes anything — every act in this dialog has already taken effect by the time you close it.
The three roles
The picker offers three roles, and it opens on Subcontractor: the first role is already chosen and its sentence is already printed before you touch anything.
| the role you pick | what the dialog promises, word for word |
|---|---|
| Subcontractor | Edits the estimate for their works and the general contractor's works, and attaches workers. No canvas editing. This applies to this project only — invite them again on another project. |
| Customer | Views the project and its progress, and reads the final estimate (no rates). Buys the materials you delegate to them: they set the price, record what they actually paid, attach receipts, and can delete those records. |
| Worker | Views the project, the works assigned to them and their schedule. Read only: progress is recorded for them, never by them. |
Subcontractor
what the dialog promises, word for word
Edits the estimate for their works and the general contractor's works, and attaches workers. No canvas editing. This applies to this project only — invite them again on another project.
Customer
what the dialog promises, word for word
Views the project and its progress, and reads the final estimate (no rates). Buys the materials you delegate to them: they set the price, record what they actually paid, attach receipts, and can delete those records.
Worker
what the dialog promises, word for word
Views the project, the works assigned to them and their schedule. Read only: progress is recorded for them, never by them.
Each role prints its own sentence in the same place, one paragraph, never two.
Read the worker's promise carefully — it is the honest one
"Read only: progress is recorded for them, never by them." A worker is given the project, his own works and his schedule, and no way to mark anything done. That is not an omission: it is what the seat does, said plainly at the moment you grant it. Chapter 21 walks that seat and Chapter 18 is where somebody else records his progress for him.
You cannot invite a crew lead
A crew lead is one of your own workers, promoted. You invite him as a Worker, and afterwards you make him the lead of his crew on the Team page — the Team page is Chapter 7's subject, and what a crew lead then does with the seat is Chapter 18's. The role is not in this picker, and the server refuses it even if something asks for it directly, in words: "A crew lead is not invited — invite the person as a worker, then make him the lead of his crew on the Team page."
Anybody who already holds a crew-lead access from before keeps it, exactly as it was.
Linking to a roster worker
Only the Worker branch grows an extra control. Pick Worker and a Link this invite to a roster worker (optional) picker appears under the sentence, offering — Not linked — until you choose somebody (Chapter 21).
Subcontractor and Customer have no such control: there is nothing to tie the invitation to on your side. You are inviting an email address, and the address is the whole of it.
The link to send
Under the roles, once per list — not once per person — the dialog carries the address a grantee opens:
People with access ·
localhost:3100/draw/access/107· Copy link
It is your site's own address followed by /draw/access/ and the project's number — the copy above is from the machine this chapter was walked on. Press Copy link and the button reads Copied.
It is the same string for everybody on the list, and it is the thing to paste into your own email or message: sending the invitation puts a row in this list and nothing else visibly happens on either side — no message, no bell, nothing the invited person has been seen to receive.
Sending an invitation
Type the address in the box at the top of the form, pick the role, and press Invite.
The row it makes
The row appears in the list at once:
nimbus · [email protected] — Subcontractor · Pending — Revoke
A row names the person as soon as there is an account behind the address. The roofing company above had an account on this system before the invitation was written, so its row carried his name from the moment it was made — while it was still Pending, before he had been anywhere near the job.
An address with no account
This is how a real customer usually arrives. The dialog takes the address without complaint and makes the row:
[email protected] — Customer · Pending — Revoke
Inviting an address that has no account is allowed, and it does not create one. The person has to make their own account against that address (Chapter 1) before the invitation is worth anything — and until they do, the row shows the email and no name, because there is nobody to name. That is the difference between the two rows above, and it is the only thing the list tells you about who has actually signed up.
The same person twice
Inviting somebody who is already on the list is refused, in words:
nimbus already has access. Revoke it first to change their role.
The refusal is printed in red beside Invite, the list is unchanged, and no second row is made. The same sentence comes back when you pick a different role for them — trying to move the same person from Subcontractor to Customer on the same project is refused in exactly the same way, which is the dialog's own rule stated at the top: one role per person on this project.
Changing somebody's role is therefore two acts, not one: revoke, then invite again.
When nobody is on the list
On a project nobody has been invited to yet, the same dialog shows:
People with access — No one has access yet. Invite someone above.
and there is no link block at all — the handover address appears only once the list has somebody on it. So the order of operations is fixed: invite first, then copy the link and send it.
What the invitee gets
Where they land
A customer
A customer lands on the project. Her first sign-in ends on the job itself — the drawn building, her own banner, her own cut of the interface. Chapter 15 walks that arrival.
A subcontractor
A subcontractor lands on a list. His first sign-in ends on Shared projects, headed with your company's name and his role, with one card per job you have shared with him and an Open on each:
[your company] · SUBCONTRACTOR · nimbus — Shared projects Projects [your company] has shared with you. Open one to view it in your scoped workspace. DrawToBid funny home — Open
Both roads reach the same seat and neither needs the invitation link: a person you invite can get to the job by signing in, and the job is on their list waiting for them. Nothing is sent, though — no message and no bell — so unless they think to go and look, the link from the dialog, pasted into your own message, is what tells them there is anything to open.
The card on first arrival
The arrival that accepts the invitation — and only that one — is met by a short card on top of the project. It names the job, says what they are here as, and explains the one word on the screen that is not plain:
DrawToBid funny home You were invited as the subcontractor — set your quote and staff your own works. The estimate is the works and the money; the project is the building itself. Calculate, top right, opens the estimate any time. Open the estimate · View the project
Two buttons under it, and each does what it says. View the project simply closes the card.
It shows once. Anyone returning gets the project straight away, no card.
The seat behind it
🔑 Subcontractor access — set your quote and staff your own crew. Canvas editing is off.
The building is on his screen, the scene tree is on the left, Calculate is on the toolbar, and the drawing tools are gone. That is the seat Chapter 9 describes, and Chapter 13 covers bidding for the work in the first place. This chapter goes no further into it.
A subcontractor with no company
This is the one case where the invitation does not open the project, and it is deliberate.
A subcontractor is being asked to price and staff work. On DrawToBid that work belongs to his own company, so a person who is a member of none is not shown the job — he is shown what this seat needs. He still lands on Shared projects like any other invitee, and the job is listed there with an Open on it:
Follow that, or the invitation link, and this is the whole screen:
This seat needs a company DrawToBid funny home You were invited to price and staff your own works on this project. On DrawToBid that work belongs to your own company, and a company starts with a subscription. Set one up and this project opens here on your seat. Your invitation stays as it is. Set up your company
The job is named and nothing of it is shown. That is not a mistake either: a project carries what you paid for the work and what you quoted your client, so a seat that cannot yet act is not handed the file. One control, and it goes to the ordinary company-and-subscription road on the account page (Chapter 2):
Two things easy to get wrong
Two things about this that are easy to get wrong:
His invitation is untouched. The card says so, and it is true — the grant stays exactly as it was, and the same address opens the project once he has a company.
Opening the card still counts as arriving. The grant turns Active on that visit even though he was shown no project. See below: Active records that somebody walked through the door, not that they got anywhere.
A customer meets none of this
A customer meets none of this. A customer belongs to no company, is not asked to make one, and gets the project on her first sign-in. The difference is what the seat is for.
Pending and Active
A new row appears as Pending, and turns Active when the person opens the project.
Signing in is not the same thing — and for a subcontractor, who lands on a list, the two are different moments: his row was still Pending after he had signed in and was looking at Shared projects, and Active a moment later once the seat had loaded. For a customer, whose sign-in lands her on the job, the two moments are one.
What the two words mean
So the two words mean something narrower than they look:
Pending — the invitation is live and the person has not opened the project yet.
Active — they have been on the job at least once.
Neither word is anything you press.
Declining
An invited company's owner has an Invitations page of his own, under his own company, and every project he has been invited to is on it:
Invitations — Projects other companies invited you to work on. Accept a pending invite to open the project; past invitations stay here for your records. Pending — Awaiting your response. Craftsman Ranch · by [your company] · Subcontractor — Sep 4, 2026 — Pending — Accept & open · Decline DrawToBid funny home · by [your company] · Subcontractor — Sep 4, 2026 — Pending — Accept & open · Decline
Accepting is opening. There is no separate accept step: Accept & open opens the project, and so does the invitation link, and either turns the row Active. Declining is a real answer — it is recorded against the invitation and the past ones stay on that page as his own record.
This page lives under a company, which is why only somebody who has one can reach it. A customer and a worker have no company and no such page: their invitation is answered by using it or by ignoring it.
A second job
A second job is a second invitation. The subcontractor hint says so outright, and it is true of the customer too: invite the same two people onto another of your projects through that project's own Manage access, and neither invitation is refused as a duplicate.
What they get is one seat listing both jobs — not a second login, not a second workspace, and both jobs are named:
[your company] · SUBCONTRACTOR · nimbus — Shared projects Craftsman Ranch — Open · DrawToBid funny home — Open
Where a grantee can go
The project's link (/draw/access/…, the one in the dialog) — the seat, every time. That is the address to send.
Your own project address — the one out of your browser bar. Do not send it: it is not their address and it does not work for them. It does not open your job; it puts them on their own empty editor and tells them why, in a notice on that screen: "That link didn't open — You don't have access to that project. This is your own editor." Chapter 15 shows that screen from the customer's side.
The company's shared-projects page (/company-access/…) — their own list of your jobs, the one above.
Everything else about your company is refused. Asked directly for the project, its grant list and its estimate settings, the server answered every one "Project 107 not found in this company" — and a grantee with no company of his own is refused earlier still, "You are not a member of any company". From a grantee's side your job is not a thing they can address, only a thing they can be let into.
Taking it back
Revoke on the row
Revoke is on the person's row.
It asks first, in the row itself:
[email protected] — Customer · Pending Remove [email protected]'s access? — Confirm · Cancel
The question names the person when the row has a name on it and the address when it does not. Cancel puts the row back as it was; on Confirm the row is gone from the list at once.
On an open session
The reload is the wall. The moment the page is loaded again, the seat is gone and the product says so plainly:
This page is unavailable Request an invitation and the owning company will review it. You'll get access to this project once they approve. Requesting as [email protected] — Add a note (optional) — Request an invitation
The same page comes up for every role, with each person's own address in it. It is also a way back in: the screen offers to ask you for the access again, with a note, rather than leaving them at a dead end. This walk did not press that button, so what follows it is not recorded here; your company's Access requests page is Chapter 14.
Behind the screens the doors close immediately — asked for the project directly, the server answered every revoked account "not found in this company" within the same minute.
What to remember
One door, three roles, one role per person per project. Changing somebody's role means revoking and inviting again — the dialog refuses to do it in one step, in words.
The invitation is the link. Nothing has been seen to arrive on the other side, so the address in the dialog's link block, pasted into your own message, is the road that always works.
They can also just sign in. A customer lands on the job; a subcontractor lands on a list of your jobs with an Open on each. The first arrival on the job gets a short card naming the seat, once and never again.
Invite the email address, not the person. An address with no DrawToBid account behind it is accepted — they make the account afterwards, and until they do the row has no name on it.
A subcontractor with no company is not shown the project, only what the seat needs and where to get it. His invitation stays live. A customer needs no company at all.
Pending means nobody has opened the project yet. Active records that they have, once.
They can decline. An invited company owner has his own Invitations page with Accept & open and Decline on every pending row.
A second job needs a second invitation, and the person still gets one seat with both jobs on it, both named.
Revoking closes the seat. Loading the project again gives a plain This page is unavailable with a way to ask you for the access back.